RETAIL: Building Materials

Lowe's Companies Inc. vs The Sherwin-Williams Company

WatchlistLOW / SHWPrices through Oct 22, 2026

Why these are rivals: #2 and #3 by market value ($110B vs $81B) in Nasdaq's "RETAIL: Building Materials" industry; SEC SIC 5211 / 5200 (same major group).

Rivals, but right now the price gap does not have a measured habit of closing, so there is no paper idea, whatever the gap.

  • Mean reversion: ADF t-statistic of the spread: -0.30 (needs <= -2.873 (5% critical value))
  • Speed: half-life of the spread, sessions: 197.83 (needs <= 63)
Business leadership

LOW is the larger business

Annual revenue reported to the SEC. Scale, not market share.

YearLOWSHWLarger
2025$86.3B$23.6BLOW
2024$83.7B$23.1BLOW
2023$86.4B$23.1BLOW
2022$97.1B$22.1BLOW
2021$96.3B$19.9BLOW
2020$89.6B$18.4BLOW

LOW led in every year with figures for both. Market value: LOW $109.9B, SHW $80.5B.

Stock leadership

SHW is ahead now

Measured against the pair's own last 252 trading days.

SHW leads LOW by 1.60 standard deviations: +16.4% over its usual price ratio. 1 lead switch in the last year.

Price change3 mo6 mo12 mo
LOW-1.6%-17.1%-16.7%
SHW+8.9%+2.4%+2.1%
Relationship

Not a measured twin today

Only these tests can make a pair tradable on paper.

Pass
Aligned sessions: 2521 (needs >= 254)
Pass
Co-movement: daily return correlation, 252 sessions: 0.73 (needs >= 0.60)
Fail
Mean reversion: ADF t-statistic of the spread: -0.30 (needs <= -2.873 (5% critical value))
Fail
Speed: half-life of the spread, sessions: 197.83 (needs <= 63)
Data
Both stocks current
The twins over two years

Prices side by side, and the gap between them

LOW Lowe's Companies Inc. SHW The Sherwin-Williams CompanyPrice index, 100 = 2024-10-18. Tint = which stock is ahead of the pair's usual 1-year relationship (z beyond +/-0.5).
80100Oct 2024Oct 2025Oct 2026LOW 73SHW 89
Spread z-score: LOW relative to SHW, against the 252 sessions before each day. Above 0: LOW ahead; below 0: SHW ahead. Lines at +/-2 (idea) and +/-4 (stop).
-4stop-2idea0+2idea+4stopOct 2024Oct 2025Oct 2026
Data table (504 sessions)
DateLOW indexSHW indexzAhead
2026-10-2272.5689.00-1.60SHW ahead
2026-10-2169.7986.84-1.77SHW ahead
2026-10-2070.4986.52-1.64SHW ahead
2026-10-1969.5685.39-1.66SHW ahead
2026-10-1670.0886.31-1.71SHW ahead
2026-10-1569.4986.75-1.88SHW ahead
2026-10-1466.8683.57-1.92SHW ahead
2026-10-1367.0183.45-1.90SHW ahead
2026-10-1265.8982.45-1.97SHW ahead
2026-10-0966.0482.23-1.94SHW ahead
2026-10-0867.0582.66-1.85SHW ahead
2026-10-0764.4681.11-2.11SHW ahead
2026-10-0665.2182.70-2.23SHW ahead
2026-10-0563.7382.00-2.43SHW ahead
2026-10-0264.2082.27-2.42SHW ahead
2026-10-0164.7682.60-2.41SHW ahead
2026-09-3065.4383.24-2.41SHW ahead
2026-09-2966.4985.09-2.52SHW ahead
2026-09-2866.6385.69-2.63SHW ahead
2026-09-2567.2184.74-2.42SHW ahead
2026-09-2466.9382.50-2.17SHW ahead
2026-09-2367.9484.06-2.25SHW ahead
2026-09-2269.6284.55-2.04SHW ahead
2026-09-2167.8182.74-2.13SHW ahead
2026-09-1868.3582.59-2.03SHW ahead
2026-09-1768.9582.64-1.95SHW ahead
2026-09-1668.9282.77-2.00SHW ahead
2026-09-1569.1083.23-2.06SHW ahead
2026-09-1470.3683.56-1.90SHW ahead
2026-09-1169.8883.25-1.96SHW ahead
2026-09-1069.8081.74-1.75SHW ahead
2026-09-0970.5282.56-1.77SHW ahead
2026-09-0871.3083.97-1.87SHW ahead
2026-09-0472.5985.93-1.96SHW ahead
2026-09-0371.6985.55-2.10SHW ahead
2026-09-0270.9685.29-2.23SHW ahead
2026-09-0171.0384.96-2.19SHW ahead
2026-08-3172.6887.24-2.27SHW ahead
2026-08-2873.8788.80-2.32SHW ahead
2026-08-2773.4188.89-2.46SHW ahead
2026-08-2674.6989.78-2.39SHW ahead
2026-08-2576.2090.24-2.21SHW ahead
2026-08-2477.0489.28-1.91SHW ahead
2026-08-2176.7389.24-1.99SHW ahead
2026-08-2077.1789.33-1.93SHW ahead
2026-08-1978.1191.05-2.06SHW ahead
2026-08-1876.5788.90-2.03SHW ahead
2026-08-1776.6390.11-2.25SHW ahead
2026-08-1477.5792.47-2.49SHW ahead
2026-08-1377.4893.10-2.66SHW ahead
2026-08-1276.6892.75-2.81SHW ahead
2026-08-1178.5693.84-2.65SHW ahead
2026-08-1077.7293.40-2.79SHW ahead
2026-08-0779.3095.20-2.82SHW ahead
2026-08-0677.5593.58-2.96SHW ahead
2026-08-0578.0995.19-3.20SHW ahead
2026-08-0477.4393.10-3.01SHW ahead
2026-08-0375.2991.21-3.20SHW ahead
2026-07-3173.7987.77-2.93SHW ahead
2026-07-3074.5988.79-3.00SHW ahead
2026-07-2976.5888.55-2.50SHW ahead
2026-07-2877.4991.22-2.88SHW ahead
2026-07-2775.1184.27-1.98SHW ahead
2026-07-2473.7381.76-1.77SHW ahead
2026-07-2371.6979.96-1.89SHW ahead
2026-07-2272.5682.37-2.23SHW ahead
2026-07-2172.2682.00-2.22SHW ahead
2026-07-2072.6883.32-2.42SHW ahead
2026-07-1774.1185.31-2.51SHW ahead
2026-07-1676.7587.07-2.23SHW ahead
2026-07-1574.4485.56-2.49SHW ahead
2026-07-1473.7484.59-2.46SHW ahead
2026-07-1373.7584.71-2.50SHW ahead
2026-07-1075.1486.00-2.44SHW ahead
2026-07-0975.6385.50-2.20SHW ahead
2026-07-0875.5885.12-2.13SHW ahead
2026-07-0778.4388.13-2.09SHW ahead
2026-07-0679.4689.90-2.22SHW ahead
2026-07-0280.7890.76-2.09SHW ahead
2026-07-0178.8089.11-2.22SHW ahead
2026-06-3078.2988.66-2.25SHW ahead
2026-06-2977.9988.65-2.33SHW ahead
2026-06-2678.9988.60-2.06SHW ahead
2026-06-2578.8087.31-1.82SHW ahead
2026-06-2478.6385.78-1.50SHW ahead
2026-06-2375.8283.14-1.59SHW ahead
2026-06-2276.1381.60-1.14SHW ahead
2026-06-1878.9082.60-0.69SHW ahead
2026-06-1777.1480.80-0.68SHW ahead
2026-06-1679.5483.03-0.61SHW ahead
2026-06-1578.1882.46-0.79SHW ahead
2026-06-1278.3981.70-0.55SHW ahead
2026-06-1178.4981.60-0.49near the usual relationship
2026-06-1076.7678.25-0.13near the usual relationship
2026-06-0977.1879.96-0.41near the usual relationship
2026-06-0873.8477.13-0.54SHW ahead
2026-06-0574.8378.61-0.63SHW ahead
2026-06-0473.6977.27-0.59SHW ahead
2026-06-0373.7376.34-0.36near the usual relationship
2026-06-0273.3775.45-0.23near the usual relationship
2026-06-0173.7575.92-0.24near the usual relationship
2026-05-2976.1178.24-0.21near the usual relationship
2026-05-2877.3878.57+0.00near the usual relationship
2026-05-2776.9979.82-0.33near the usual relationship
2026-05-2675.3080.14-0.74SHW ahead
2026-05-2276.3579.59-0.40near the usual relationship
2026-05-2177.1979.65-0.23near the usual relationship
2026-05-2078.4979.23+0.12near the usual relationship
2026-05-1977.5477.00+0.39near the usual relationship
2026-05-1877.4177.96+0.17near the usual relationship
2026-05-1577.5577.27+0.35near the usual relationship
2026-05-1479.4079.61+0.25near the usual relationship
2026-05-1378.2778.88+0.18near the usual relationship
2026-05-1279.7280.23+0.21near the usual relationship
2026-05-1180.2780.52+0.27near the usual relationship
2026-05-0881.3881.58+0.28near the usual relationship
2026-05-0781.9882.45+0.24near the usual relationship
2026-05-0682.8683.33+0.25near the usual relationship
2026-05-0579.9780.46+0.25near the usual relationship
2026-05-0479.4379.95+0.25near the usual relationship
2026-05-0182.8581.88+0.52LOW ahead
2026-04-3084.7982.81+0.71LOW ahead
2026-04-2982.9181.84+0.55LOW ahead
2026-04-2885.3383.50+0.69LOW ahead
2026-04-2786.1286.54+0.30near the usual relationship
2026-04-2486.8086.96+0.35near the usual relationship
2026-04-2387.5486.95+0.48near the usual relationship
2026-04-2287.0686.30+0.52LOW ahead
2026-04-2189.1986.16+0.90LOW ahead
2026-04-2089.9388.56+0.63LOW ahead
2026-04-1789.3888.98+0.47near the usual relationship
2026-04-1686.0785.83+0.45near the usual relationship
2026-04-1586.6384.67+0.75LOW ahead
2026-04-1488.2185.90+0.81LOW ahead
2026-04-1387.7386.10+0.71LOW ahead
2026-04-1086.7186.55+0.47near the usual relationship
2026-04-0987.9986.45+0.70LOW ahead
2026-04-0886.5186.43+0.46near the usual relationship
2026-04-0782.2480.84+0.70LOW ahead
2026-04-0683.5181.47+0.82LOW ahead
2026-04-0282.0381.88+0.49near the usual relationship
2026-04-0183.7983.87+0.46near the usual relationship
2026-03-3183.8982.54+0.71LOW ahead
2026-03-3082.5881.34+0.70LOW ahead
2026-03-2781.7781.21+0.59LOW ahead
2026-03-2683.8182.28+0.76LOW ahead
2026-03-2583.8682.90+0.66LOW ahead
2026-03-2483.2480.78+0.94LOW ahead
2026-03-2383.1780.84+0.92LOW ahead
2026-03-2079.7678.16+0.81LOW ahead
2026-03-1981.5679.92+0.81LOW ahead
2026-03-1882.0580.37+0.83LOW ahead
2026-03-1785.1182.58+0.97LOW ahead
2026-03-1685.9683.10+1.03LOW ahead
2026-03-1384.3682.34+0.90LOW ahead
2026-03-1285.0281.81+1.12LOW ahead
2026-03-1187.6683.10+1.34LOW ahead
2026-03-1089.1685.06+1.26LOW ahead
2026-03-0988.8485.85+1.08LOW ahead
2026-03-0689.4484.94+1.35LOW ahead
2026-03-0590.4486.38+1.28LOW ahead
2026-03-0491.8389.52+0.98LOW ahead
2026-03-0391.5089.82+0.88LOW ahead
2026-03-0291.3191.69+0.55LOW ahead
2026-02-2793.9493.36+0.71LOW ahead
2026-02-2693.8892.83+0.79LOW ahead
2026-02-2593.3991.99+0.85LOW ahead
2026-02-2498.9293.92+1.41LOW ahead
2026-02-2397.4293.80+1.21LOW ahead
2026-02-2099.5592.86+1.70LOW ahead
2026-02-1998.7792.08+1.72LOW ahead
2026-02-18100.1794.18+1.61LOW ahead
2026-02-1799.8394.74+1.47LOW ahead
2026-02-13102.0494.99+1.79LOW ahead
2026-02-12101.3895.94+1.54LOW ahead
2026-02-11101.9294.49+1.88LOW ahead
2026-02-10101.0893.89+1.87LOW ahead
2026-02-0998.3192.85+1.62LOW ahead
2026-02-0698.8493.21+1.66LOW ahead
2026-02-0597.6092.97+1.51LOW ahead
2026-02-0497.9494.99+1.23LOW ahead
2026-02-0397.5992.60+1.59LOW ahead
2026-02-0295.5391.76+1.40LOW ahead
2026-01-3094.8291.32+1.36LOW ahead
2026-01-2994.6791.30+1.35LOW ahead
2026-01-2895.6690.02+1.75LOW ahead
2026-01-2797.2789.11+2.21LOW ahead
2026-01-2698.6889.69+2.37LOW ahead
2026-01-2398.2689.74+2.31LOW ahead
2026-01-2297.6290.28+2.13LOW ahead
2026-01-2198.3991.75+2.00LOW ahead
2026-01-2095.3089.34+1.93LOW ahead
2026-01-1698.5592.14+1.99LOW ahead
2026-01-1598.3691.70+2.05LOW ahead
2026-01-1497.6291.24+2.02LOW ahead
2026-01-1397.3891.66+1.91LOW ahead
2026-01-1296.1892.09+1.62LOW ahead
2026-01-0994.8890.97+1.60LOW ahead
2026-01-0890.9787.81+1.49LOW ahead
2026-01-0787.7485.34+1.36LOW ahead
2026-01-0687.5287.57+0.86LOW ahead
2026-01-0586.9085.54+1.15LOW ahead
2026-01-0287.6684.42+1.54LOW ahead
2025-12-3185.6383.44+1.34LOW ahead
2025-12-3086.3483.98+1.37LOW ahead
2025-12-2986.5883.74+1.48LOW ahead
2025-12-2686.8183.80+1.52LOW ahead
2025-12-2486.2883.78+1.43LOW ahead
2025-12-2385.9883.44+1.44LOW ahead
2025-12-2285.9583.39+1.46LOW ahead
2025-12-1985.3782.62+1.51LOW ahead
2025-12-1887.9583.78+1.81LOW ahead
2025-12-1788.0484.44+1.70LOW ahead
2025-12-1687.5184.42+1.60LOW ahead
2025-12-1588.3384.57+1.75LOW ahead
2025-12-1287.8084.64+1.64LOW ahead
2025-12-1188.0884.79+1.67LOW ahead
2025-12-1087.4284.01+1.71LOW ahead
2025-12-0986.1682.69+1.75LOW ahead
2025-12-0886.9384.23+1.59LOW ahead
2025-12-0588.2285.77+1.54LOW ahead
2025-12-0487.4186.36+1.25LOW ahead
2025-12-0387.6887.35+1.10LOW ahead
2025-12-0286.3486.90+0.91LOW ahead
2025-12-0187.4887.93+0.94LOW ahead
2025-11-2886.1088.50+0.52LOW ahead
2025-11-2685.7988.42+0.47near the usual relationship
2025-11-2584.5488.23+0.24near the usual relationship
2025-11-2481.2287.03-0.26near the usual relationship
2025-11-2183.1986.79+0.24near the usual relationship
2025-11-2081.1184.46+0.27near the usual relationship
2025-11-1981.1084.92+0.17near the usual relationship
2025-11-1877.9683.38-0.24near the usual relationship
2025-11-1779.8984.15+0.05near the usual relationship
2025-11-1480.9085.53-0.02near the usual relationship
2025-11-1382.1987.25-0.10near the usual relationship
2025-11-1283.3388.76-0.17near the usual relationship
2025-11-1183.5688.86-0.14near the usual relationship
2025-11-1082.7488.20-0.18near the usual relationship
2025-11-0782.7987.59-0.04near the usual relationship
2025-11-0682.1485.92+0.17near the usual relationship
2025-11-0583.2186.46+0.29near the usual relationship
2025-11-0484.4288.31+0.16near the usual relationship
2025-11-0383.6789.00-0.16near the usual relationship
2025-10-3184.5588.82+0.07near the usual relationship
2025-10-3085.1589.58+0.04near the usual relationship
2025-10-2984.6889.02+0.05near the usual relationship
2025-10-2886.6691.27+0.01near the usual relationship
2025-10-2786.5186.54+0.95LOW ahead
2025-10-2486.1886.00+0.98LOW ahead
2025-10-2386.5985.42+1.20LOW ahead
2025-10-2286.4785.95+1.06LOW ahead
2025-10-2187.0987.15+0.94LOW ahead
2025-10-2086.0285.29+1.11LOW ahead
2025-10-1786.8885.16+1.32LOW ahead
2025-10-1686.3285.35+1.16LOW ahead
2025-10-1585.7685.68+0.97LOW ahead
2025-10-1485.4886.33+0.77LOW ahead
2025-10-1383.2685.53+0.46near the usual relationship
2025-10-1082.4585.70+0.24near the usual relationship
2025-10-0983.3285.80+0.40near the usual relationship
2025-10-0884.3686.92+0.39near the usual relationship
2025-10-0785.1886.78+0.60LOW ahead
2025-10-0685.8186.75+0.73LOW ahead
2025-10-0387.4789.25+0.57LOW ahead
2025-10-0287.8288.55+0.78LOW ahead
2025-10-0188.0587.86+0.98LOW ahead
2025-09-3089.2389.16+0.96LOW ahead
2025-09-2989.9488.30+1.29LOW ahead
2025-09-2691.2988.04+1.63LOW ahead
2025-09-2590.7387.57+1.63LOW ahead
2025-09-2491.3788.31+1.62LOW ahead
2025-09-2392.2588.69+1.73LOW ahead
2025-09-2292.4589.20+1.68LOW ahead
2025-09-1994.1689.30+2.03LOW ahead
2025-09-1895.0090.01+2.07LOW ahead
2025-09-1795.1490.18+2.09LOW ahead
2025-09-1696.0590.95+2.14LOW ahead
2025-09-1596.6191.95+2.07LOW ahead
2025-09-1296.5292.72+1.91LOW ahead
2025-09-1196.7294.93+1.50LOW ahead
2025-09-1094.6492.04+1.70LOW ahead
2025-09-0995.5293.05+1.68LOW ahead
2025-09-0896.9496.62+1.23LOW ahead
2025-09-0595.8695.90+1.17LOW ahead
2025-09-0493.9494.19+1.13LOW ahead
2025-09-0392.5693.48+0.99LOW ahead
2025-09-0291.8792.93+0.96LOW ahead
2025-08-2991.6394.20+0.64LOW ahead
2025-08-2891.4494.29+0.58LOW ahead
2025-08-2791.8494.60+0.60LOW ahead
2025-08-2691.7294.36+0.63LOW ahead
2025-08-2591.9294.50+0.65LOW ahead
2025-08-2293.6496.03+0.70LOW ahead
2025-08-2190.7793.69+0.57LOW ahead
2025-08-2091.3094.53+0.51LOW ahead
2025-08-1991.0294.74+0.41near the usual relationship
2025-08-1889.0892.40+0.48near the usual relationship
2025-08-1589.5093.83+0.27near the usual relationship
2025-08-1489.8594.13+0.28near the usual relationship
2025-08-1391.0194.97+0.37near the usual relationship
2025-08-1286.9492.21+0.04near the usual relationship
2025-08-1185.1691.30-0.19near the usual relationship
2025-08-0885.6290.68+0.06near the usual relationship
2025-08-0784.7090.10-0.03near the usual relationship
2025-08-0684.6190.31-0.10near the usual relationship
2025-08-0584.3190.66-0.25near the usual relationship
2025-08-0483.0289.57-0.32near the usual relationship
2025-08-0180.3988.43-0.72SHW ahead
2025-07-3179.3885.20-0.22near the usual relationship
2025-07-3080.7585.48+0.06near the usual relationship
2025-07-2981.6886.77-0.01near the usual relationship
2025-07-2881.6686.56+0.03near the usual relationship
2025-07-2580.5387.57-0.49near the usual relationship
2025-07-2480.0987.60-0.62SHW ahead
2025-07-2381.1788.30-0.51SHW ahead
2025-07-2280.5487.57-0.51SHW ahead
2025-07-2178.4487.88-1.12SHW ahead
2025-07-1877.8287.57-1.21SHW ahead
2025-07-1777.6187.52-1.27SHW ahead
2025-07-1676.9187.51-1.46SHW ahead
2025-07-1576.3487.30-1.57SHW ahead
2025-07-1478.9788.71-1.22SHW ahead
2025-07-1179.5889.07-1.16SHW ahead
2025-07-1080.9290.59-1.17SHW ahead
2025-07-0980.0990.52-1.38SHW ahead
2025-07-0879.4289.09-1.24SHW ahead
2025-07-0779.8989.17-1.15SHW ahead
2025-07-0381.0691.15-1.30SHW ahead
2025-07-0280.5890.77-1.35SHW ahead
2025-07-0181.1891.49-1.37SHW ahead
2025-06-3078.7888.41-1.30SHW ahead
2025-06-2779.4089.02-1.29SHW ahead
2025-06-2678.5588.03-1.28SHW ahead
2025-06-2578.3688.48-1.44SHW ahead
2025-06-2478.1189.01-1.64SHW ahead
2025-06-2377.6188.52-1.67SHW ahead
2025-06-2075.5485.87-1.62SHW ahead
2025-06-1874.8685.35-1.69SHW ahead
2025-06-1775.2485.24-1.57SHW ahead
2025-06-1676.7286.46-1.48SHW ahead
2025-06-1377.1486.49-1.39SHW ahead
2025-06-1279.3691.72-2.01SHW ahead
2025-06-1178.6891.96-2.27SHW ahead
2025-06-1079.8592.89-2.20SHW ahead
2025-06-0979.4092.17-2.19SHW ahead
2025-06-0679.9992.05-2.04SHW ahead
2025-06-0580.8192.15-1.87SHW ahead
2025-06-0481.0993.27-2.07SHW ahead
2025-06-0381.2492.12-1.80SHW ahead
2025-06-0280.0791.52-1.99SHW ahead
2025-05-3080.1592.39-2.20SHW ahead
2025-05-2979.8691.60-2.12SHW ahead
2025-05-2879.7291.34-2.12SHW ahead
2025-05-2780.1892.52-2.31SHW ahead
2025-05-2378.4990.77-2.39SHW ahead
2025-05-2279.4590.88-2.18SHW ahead
2025-05-2180.7391.14-1.91SHW ahead
2025-05-2082.1192.47-1.87SHW ahead
2025-05-1983.2493.21-1.76SHW ahead
2025-05-1683.1793.60-1.90SHW ahead
2025-05-1582.5393.07-1.96SHW ahead
2025-05-1481.1490.48-1.73SHW ahead
2025-05-1381.9491.68-1.82SHW ahead
2025-05-1282.6591.96-1.71SHW ahead
2025-05-0978.9290.60-2.47SHW ahead
2025-05-0879.7091.04-2.39SHW ahead
2025-05-0779.3690.53-2.39SHW ahead
2025-05-0679.1890.77-2.54SHW ahead
2025-05-0579.9692.65-2.84SHW ahead
2025-05-0280.6792.60-2.66SHW ahead
2025-05-0178.9491.06-2.82SHW ahead
2025-04-3079.3890.87-2.68SHW ahead
2025-04-2979.2789.64-2.40SHW ahead
2025-04-2878.5285.54-1.48SHW ahead
2025-04-2578.4485.39-1.47SHW ahead
2025-04-2478.8486.12-1.57SHW ahead
2025-04-2377.3285.29-1.83SHW ahead
2025-04-2277.7885.48-1.75SHW ahead
2025-04-2175.5582.99-1.76SHW ahead
2025-04-1777.7685.84-1.91SHW ahead
2025-04-1676.1385.30-2.31SHW ahead
2025-04-1578.2986.74-2.05SHW ahead
2025-04-1479.5887.81-1.97SHW ahead
2025-04-1178.2486.72-2.11SHW ahead
2025-04-1078.5484.95-1.50SHW ahead
2025-04-0979.2586.58-1.78SHW ahead
2025-04-0875.1680.73-1.34SHW ahead
2025-04-0777.0383.12-1.48SHW ahead
2025-04-0479.2885.50-1.48SHW ahead
2025-04-0379.0187.72-2.27SHW ahead
2025-04-0283.5491.06-1.81SHW ahead
2025-04-0183.0990.27-1.73SHW ahead
2025-03-3182.8189.91-1.74SHW ahead
2025-03-2881.1087.48-1.57SHW ahead
2025-03-2782.4489.00-1.61SHW ahead
2025-03-2682.3988.69-1.54SHW ahead
2025-03-2581.9187.85-1.46SHW ahead
2025-03-2482.6988.25-1.33SHW ahead
2025-03-2180.6286.11-1.37SHW ahead
2025-03-2080.3486.53-1.61SHW ahead
2025-03-1980.0786.24-1.63SHW ahead
2025-03-1879.1686.40-2.02SHW ahead
2025-03-1780.1988.13-2.24SHW ahead
2025-03-1479.6988.01-2.41SHW ahead
2025-03-1379.0688.09-2.71SHW ahead
2025-03-1281.0790.08-2.68SHW ahead
2025-03-1182.6190.90-2.43SHW ahead
2025-03-1086.0692.13-1.63SHW ahead
2025-03-0786.1693.63-2.11SHW ahead
2025-03-0686.4692.72-1.73SHW ahead
2025-03-0586.2793.29-2.01SHW ahead
2025-03-0485.1691.48-1.82SHW ahead
2025-03-0387.4091.86-1.17SHW ahead
2025-02-2888.2893.28-1.34SHW ahead
2025-02-2787.1791.54-1.16SHW ahead
2025-02-2687.7392.59-1.33SHW ahead
2025-02-2586.0690.90-1.36SHW ahead
2025-02-2484.1888.54-1.24SHW ahead
2025-02-2184.9288.72-1.04SHW ahead
2025-02-2087.4990.13-0.60SHW ahead
2025-02-1987.5990.60-0.74SHW ahead
2025-02-1889.0290.89-0.34near the usual relationship
2025-02-1489.4091.89-0.55SHW ahead
2025-02-1389.7192.99-0.82SHW ahead
2025-02-1288.8691.54-0.63SHW ahead
2025-02-1191.2693.05-0.31near the usual relationship
2025-02-1091.0592.48-0.19near the usual relationship
2025-02-0789.4592.84-0.86SHW ahead
2025-02-0691.2394.04-0.65SHW ahead
2025-02-0591.7793.85-0.41near the usual relationship
2025-02-0491.3392.08+0.04near the usual relationship
2025-02-0391.0792.09-0.05near the usual relationship
2025-01-3192.3392.22+0.33near the usual relationship
2025-01-3093.7494.13+0.18near the usual relationship
2025-01-2992.9392.80+0.35near the usual relationship
2025-01-2893.8893.77+0.35near the usual relationship
2025-01-2795.3193.77+0.82LOW ahead
2025-01-2493.1092.74+0.44near the usual relationship
2025-01-2392.7992.98+0.26near the usual relationship
2025-01-2291.6192.12+0.15near the usual relationship
2025-01-2193.8693.09+0.58LOW ahead
2025-01-1792.6991.15+0.85LOW ahead
2025-01-1691.8891.20+0.56LOW ahead
2025-01-1591.1589.33+0.95LOW ahead
2025-01-1489.1987.97+0.75LOW ahead
2025-01-1388.2986.55+0.95LOW ahead
2025-01-1088.0285.01+1.41LOW ahead
2025-01-0887.6686.91+0.60LOW ahead
2025-01-0787.5586.11+0.86LOW ahead
2025-01-0688.6786.99+0.94LOW ahead
2025-01-0388.2386.66+0.91LOW ahead
2025-01-0287.6985.79+1.04LOW ahead
2024-12-3187.6387.53+0.39near the usual relationship
2024-12-3087.6087.23+0.50LOW ahead
2024-12-2788.1888.39+0.29near the usual relationship
2024-12-2688.5688.97+0.22near the usual relationship
2024-12-2488.8489.23+0.23near the usual relationship
2024-12-2387.8388.79+0.02near the usual relationship
2024-12-2087.9688.96+0.01near the usual relationship
2024-12-1986.8288.16-0.12near the usual relationship
2024-12-1888.7089.78-0.02near the usual relationship
2024-12-1791.5293.42-0.29near the usual relationship
2024-12-1692.3593.99-0.20near the usual relationship
2024-12-1393.1793.86+0.12near the usual relationship
2024-12-1293.5694.46+0.05near the usual relationship
2024-12-1195.1295.77+0.14near the usual relationship
2024-12-1095.9195.68+0.43near the usual relationship
2024-12-0997.3496.93+0.49near the usual relationship
2024-12-0697.0899.12-0.29near the usual relationship
2024-12-0595.8999.20-0.70SHW ahead
2024-12-0496.67100.96-1.01SHW ahead
2024-12-0397.43101.79-1.03SHW ahead
2024-12-0296.59101.86-1.33SHW ahead
2024-11-2996.73102.33-1.44SHW ahead
2024-11-2797.00101.44-1.09SHW ahead
2024-11-2697.45102.00-1.12SHW ahead
2024-11-2597.76102.92-1.32SHW ahead
2024-11-2293.9899.98-1.66SHW ahead
2024-11-2194.1798.70-1.20SHW ahead
2024-11-2093.3995.70-0.48near the usual relationship
2024-11-1992.0596.17-1.11SHW ahead
2024-11-1896.5096.65+0.23near the usual relationship
2024-11-1595.6597.59-0.36near the usual relationship
2024-11-1495.99100.03-1.03SHW ahead
2024-11-1396.6999.72-0.72SHW ahead
2024-11-1295.8398.79-0.71SHW ahead
2024-11-1197.47100.23-0.64SHW ahead
2024-11-0896.2699.56-0.82SHW ahead
2024-11-0794.5598.88-1.16SHW ahead
2024-11-0692.9398.04-1.44SHW ahead
2024-11-0595.5897.39-0.39near the usual relationship
2024-11-0494.0896.41-0.57SHW ahead
2024-11-0193.0192.17+0.40near the usual relationship
2024-10-3192.9792.38+0.31near the usual relationship
2024-10-3092.8193.18+0.00near the usual relationship
2024-10-2993.3793.11+0.18near the usual relationship
2024-10-2895.1593.54+0.57LOW ahead
2024-10-2595.0392.45+0.85LOW ahead
2024-10-2496.3593.11+1.01LOW ahead
2024-10-2395.9193.40+0.79LOW ahead
2024-10-2296.6693.05+1.08LOW ahead
2024-10-2198.3098.30+0.06near the usual relationship
2024-10-18100.00100.00+0.05near the usual relationship

One-day company-specific moves (4+ standard deviations, which block ideas for 10 sessions): Oct 28, 2025 (LOW +0.2%, SHW +5.5%). Upcoming earnings: SHW Oct 27, 2026 (pre-market).

Paired trades

The shared paper book and the replay, kept apart

Forward paper record

No paper position on this pair yet.

Historical simulation (a diagnostic, same rules)

1 simulated trade to Oct 20, 2026: -6.67% per trade on average after costs, 0 won.

LegsEnteredExitedWhyDaysBefore costsCosts + borrowAfter costs
Long LOW · Short SHWAug 9, 2023Nov 10, 2023divergence stop93-$638.01-$53.86-$666.97 (-6.67%)

Per $10,000 a leg. A replay on today's companies cannot prove an edge.

The companies

LOW and SHW at a glance

LOW Lowe's Companies Inc.

Listing
NYSE · SEC CIK 60667
Industry
RETAIL: Building Materials · SIC 5211 Retail-Lumber & Other Building Materials Dealers
Market value
$109.9B
Price history
2,521 daily closes, Oct 12, 2016 to Oct 22, 2026

SHW The Sherwin-Williams Company

Listing
NYSE · SEC CIK 89800
Industry
RETAIL: Building Materials · SIC 5200 Retail-Building Materials, Hardware, Garden Supply
Market value
$80.5B
Price history
2,521 daily closes, Oct 12, 2016 to Oct 22, 2026

Daily prices: Nasdaq.com. Filings and industry codes: SEC EDGAR. Earnings dates: Nasdaq earnings calendar.

Related
All pairs →
PairStatusAhead nowIndustry
HD / LOWWatchlistHD by 1.33 sdRETAIL: Building Materials
SHW / FASTWatchlistFAST by 1.29 sdSIC 5200 Retail-Building Materials, Hardware, Garden Supply
HD / SHWWatchlistSHW by 1.29 sdRETAIL: Building Materials
SHW / TSCOWatchlistSHW by 0.87 sdSIC 5200 Retail-Building Materials, Hardware, Garden Supply

Follow the research behind the paper book

Boostio is a research-first platform in private beta: crypto candidates, daily market stories, public paper trading and now rival stocks. Exploring these pages stays free and open.

Explore the private beta

Paper only: hypothetical paired positions with modelled costs. No broker, no orders, no real money. A historical simulation is a diagnostic, not proof of an edge. Not investment advice.