SIC 5200 Retail-Building Materials, Hardware, Garden Supply

The Sherwin-Williams Company vs Tractor Supply Company

WatchlistSHW / TSCOPrices through Oct 22, 2026

Why these are rivals: #1 and #3 by market value ($81B vs $17B) with SEC SIC 5200 (Retail-Building Materials, Hardware, Garden Supply).

Rivals, but right now the price gap does not have a measured habit of closing, so there is no paper idea, whatever the gap.

  • Co-movement: daily return correlation, 252 sessions: 0.33 (needs >= 0.60)
  • Mean reversion: ADF t-statistic of the spread: -1.03 (needs <= -2.873 (5% critical value))
  • Speed: half-life of the spread, sessions: 111.50 (needs <= 63)
Business leadership

SHW is the larger business

Annual revenue reported to the SEC. Scale, not market share.

YearSHWTSCOLarger
2025$23.6B$15.5BSHW
2024$23.1B$14.9BSHW
2023$23.1B$14.6BSHW
2022$22.1B$14.2BSHW
2021$19.9B$12.7BSHW
2020$18.4B$10.6BSHW

SHW led in every year with figures for both. Market value: SHW $80.5B, TSCO $17.1B.

Stock leadership

SHW is ahead now

Measured against the pair's own last 252 trading days.

SHW leads TSCO by 0.87 standard deviations: +21.3% over its usual price ratio. 1 lead switch in the last year.

Price change3 mo6 mo12 mo
SHW+8.9%+2.4%+2.1%
TSCO+12.0%-9.0%-36.6%
Relationship

Not a measured twin today

Only these tests can make a pair tradable on paper.

Pass
Aligned sessions: 2521 (needs >= 254)
Fail
Co-movement: daily return correlation, 252 sessions: 0.33 (needs >= 0.60)
Fail
Mean reversion: ADF t-statistic of the spread: -1.03 (needs <= -2.873 (5% critical value))
Fail
Speed: half-life of the spread, sessions: 111.50 (needs <= 63)
Data
Both stocks current
The twins over two years

Prices side by side, and the gap between them

SHW The Sherwin-Williams Company TSCO Tractor Supply CompanyPrice index, 100 = 2024-10-18. Tint = which stock is ahead of the pair's usual 1-year relationship (z beyond +/-0.5).
6080100Oct 2024Oct 2025Oct 2026SHW 89TSCO 58
Spread z-score: SHW relative to TSCO, against the 252 sessions before each day. Above 0: SHW ahead; below 0: TSCO ahead. Lines at +/-2 (idea) and +/-4 (stop).
-4stop-2idea0+2idea+4stopOct 2024Oct 2025Oct 2026
Data table (504 sessions)
DateSHW indexTSCO indexzAhead
2026-10-2289.0058.35+0.87SHW ahead
2026-10-2186.8454.92+1.04SHW ahead
2026-10-2086.5255.29+1.00SHW ahead
2026-10-1985.3955.12+0.96SHW ahead
2026-10-1686.3155.71+0.97SHW ahead
2026-10-1586.7556.06+0.97SHW ahead
2026-10-1483.5755.00+0.90SHW ahead
2026-10-1383.4556.61+0.77SHW ahead
2026-10-1282.4556.20+0.75SHW ahead
2026-10-0982.2356.62+0.71SHW ahead
2026-10-0882.6656.25+0.77SHW ahead
2026-10-0781.1154.63+0.82SHW ahead
2026-10-0682.7054.25+0.95SHW ahead
2026-10-0582.0052.79+1.04SHW ahead
2026-10-0282.2752.23+1.11SHW ahead
2026-10-0182.6053.31+1.05SHW ahead
2026-09-3083.2452.57+1.15SHW ahead
2026-09-2985.0952.94+1.23SHW ahead
2026-09-2885.6953.88+1.19SHW ahead
2026-09-2584.7454.21+1.12SHW ahead
2026-09-2482.5052.82+1.13SHW ahead
2026-09-2384.0654.25+1.10SHW ahead
2026-09-2284.5555.17+1.06SHW ahead
2026-09-2182.7454.31+1.04SHW ahead
2026-09-1882.5954.11+1.06SHW ahead
2026-09-1782.6455.14+0.99SHW ahead
2026-09-1682.7755.07+1.01SHW ahead
2026-09-1583.2355.49+1.00SHW ahead
2026-09-1483.5656.83+0.92SHW ahead
2026-09-1183.2555.46+1.02SHW ahead
2026-09-1081.7456.31+0.88SHW ahead
2026-09-0982.5657.12+0.87SHW ahead
2026-09-0883.9759.29+0.79SHW ahead
2026-09-0485.9358.78+0.94SHW ahead
2026-09-0385.5558.13+0.97SHW ahead
2026-09-0285.2958.56+0.93SHW ahead
2026-09-0184.9658.31+0.94SHW ahead
2026-08-3187.2458.63+1.04SHW ahead
2026-08-2888.8058.33+1.15SHW ahead
2026-08-2788.8958.30+1.17SHW ahead
2026-08-2689.7858.82+1.18SHW ahead
2026-08-2590.2459.44+1.17SHW ahead
2026-08-2489.2860.35+1.06SHW ahead
2026-08-2189.2458.77+1.19SHW ahead
2026-08-2089.3358.88+1.19SHW ahead
2026-08-1991.0559.54+1.24SHW ahead
2026-08-1888.9058.33+1.23SHW ahead
2026-08-1790.1158.26+1.31SHW ahead
2026-08-1492.4760.19+1.29SHW ahead
2026-08-1393.1060.77+1.29SHW ahead
2026-08-1292.7561.20+1.25SHW ahead
2026-08-1193.8459.29+1.45SHW ahead
2026-08-1093.4058.16+1.53SHW ahead
2026-08-0795.2058.06+1.64SHW ahead
2026-08-0693.5857.27+1.64SHW ahead
2026-08-0595.1956.13+1.83SHW ahead
2026-08-0493.1055.64+1.78SHW ahead
2026-08-0391.2153.94+1.85SHW ahead
2026-07-3187.7751.69+1.89SHW ahead
2026-07-3088.7950.75+2.05SHW ahead
2026-07-2988.5552.08+1.94SHW ahead
2026-07-2891.2252.85+2.04SHW ahead
2026-07-2784.2753.42+1.64SHW ahead
2026-07-2481.7652.11+1.63SHW ahead
2026-07-2379.9650.94+1.65SHW ahead
2026-07-2282.3749.32+1.96SHW ahead
2026-07-2182.0049.80+1.91SHW ahead
2026-07-2083.3250.90+1.91SHW ahead
2026-07-1785.3151.26+2.01SHW ahead
2026-07-1687.0752.10+2.05SHW ahead
2026-07-1585.5650.69+2.13SHW ahead
2026-07-1484.5951.32+2.04SHW ahead
2026-07-1384.7150.80+2.12SHW ahead
2026-07-1086.0051.12+2.20SHW ahead
2026-07-0985.5050.60+2.25SHW ahead
2026-07-0885.1249.69+2.35SHW ahead
2026-07-0788.1351.12+2.43SHW ahead
2026-07-0689.9050.77+2.61SHW ahead
2026-07-0290.7653.36+2.44SHW ahead
2026-07-0189.1154.20+2.29SHW ahead
2026-06-3088.6653.10+2.41SHW ahead
2026-06-2988.6552.42+2.52SHW ahead
2026-06-2688.6052.43+2.56SHW ahead
2026-06-2587.3151.66+2.61SHW ahead
2026-06-2485.7850.50+2.68SHW ahead
2026-06-2383.1449.86+2.63SHW ahead
2026-06-2281.6050.08+2.54SHW ahead
2026-06-1882.6050.80+2.57SHW ahead
2026-06-1780.8049.98+2.58SHW ahead
2026-06-1683.0350.75+2.70SHW ahead
2026-06-1582.4651.88+2.57SHW ahead
2026-06-1281.7052.50+2.48SHW ahead
2026-06-1181.6052.52+2.51SHW ahead
2026-06-1078.2551.69+2.38SHW ahead
2026-06-0979.9650.33+2.74SHW ahead
2026-06-0877.1350.64+2.51SHW ahead
2026-06-0578.6150.03+2.75SHW ahead
2026-06-0477.2749.34+2.78SHW ahead
2026-06-0376.3448.96+2.80SHW ahead
2026-06-0275.4550.42+2.56SHW ahead
2026-06-0175.9253.39+2.24SHW ahead
2026-05-2978.2452.97+2.54SHW ahead
2026-05-2878.5752.70+2.65SHW ahead
2026-05-2779.8251.53+2.98SHW ahead
2026-05-2680.1450.06+3.30SHW ahead
2026-05-2279.5953.12+2.86SHW ahead
2026-05-2179.6553.21+2.91SHW ahead
2026-05-2079.2353.24+2.93SHW ahead
2026-05-1977.0052.32+2.90SHW ahead
2026-05-1877.9653.29+2.91SHW ahead
2026-05-1577.2751.36+3.21SHW ahead
2026-05-1479.6151.22+3.57SHW ahead
2026-05-1378.8850.15+3.79SHW ahead
2026-05-1280.2351.39+3.84SHW ahead
2026-05-1180.5250.82+4.12SHW ahead
2026-05-0881.5851.49+4.28SHW ahead
2026-05-0782.4553.32+4.20SHW ahead
2026-05-0683.3354.65+4.22SHW ahead
2026-05-0580.4654.90+3.94SHW ahead
2026-05-0479.9554.28+4.13SHW ahead
2026-05-0181.8856.83+4.03SHW ahead
2026-04-3082.8158.97+3.87SHW ahead
2026-04-2981.8458.41+3.97SHW ahead
2026-04-2883.5059.79+4.08SHW ahead
2026-04-2786.5459.93+4.68SHW ahead
2026-04-2486.9661.72+4.57SHW ahead
2026-04-2386.9564.13+4.22SHW ahead
2026-04-2286.3065.45+3.98SHW ahead
2026-04-2186.1666.48+3.86SHW ahead
2026-04-2088.5675.28+2.51SHW ahead
2026-04-1788.9875.62+2.55SHW ahead
2026-04-1685.8374.98+2.18SHW ahead
2026-04-1584.6775.18+1.96SHW ahead
2026-04-1485.9075.63+2.11SHW ahead
2026-04-1386.1076.34+2.03SHW ahead
2026-04-1086.5575.65+2.27SHW ahead
2026-04-0986.4576.67+2.07SHW ahead
2026-04-0886.4376.07+2.23SHW ahead
2026-04-0780.8473.31+1.78SHW ahead
2026-04-0681.4776.25+1.29SHW ahead
2026-04-0281.8873.62+1.95SHW ahead
2026-04-0183.8774.81+2.10SHW ahead
2026-03-3182.5476.10+1.58SHW ahead
2026-03-3081.3476.29+1.32SHW ahead
2026-03-2781.2175.38+1.50SHW ahead
2026-03-2682.2877.09+1.36SHW ahead
2026-03-2582.9077.21+1.47SHW ahead
2026-03-2480.7876.42+1.22SHW ahead
2026-03-2380.8476.73+1.17SHW ahead
2026-03-2078.1676.89+0.59SHW ahead
2026-03-1979.9277.58+0.81SHW ahead
2026-03-1880.3777.20+0.99SHW ahead
2026-03-1782.5879.88+0.87SHW ahead
2026-03-1683.1081.95+0.56SHW ahead
2026-03-1382.3479.36+0.94SHW ahead
2026-03-1281.8180.81+0.53SHW ahead
2026-03-1183.1083.11+0.33near the usual relationship
2026-03-1085.0684.57+0.43near the usual relationship
2026-03-0985.8585.13+0.47near the usual relationship
2026-03-0684.9484.27+0.46near the usual relationship
2026-03-0586.3884.86+0.63SHW ahead
2026-03-0489.5284.99+1.20SHW ahead
2026-03-0389.8286.69+0.93SHW ahead
2026-03-0291.6987.83+1.06SHW ahead
2026-02-2793.3687.09+1.52SHW ahead
2026-02-2692.8385.98+1.65SHW ahead
2026-02-2591.9986.97+1.32SHW ahead
2026-02-2493.9289.49+1.19SHW ahead
2026-02-2393.8090.53+0.98SHW ahead
2026-02-2092.8688.97+1.12SHW ahead
2026-02-1992.0887.29+1.31SHW ahead
2026-02-1894.1888.27+1.52SHW ahead
2026-02-1794.7488.52+1.58SHW ahead
2026-02-1394.9992.45+0.89SHW ahead
2026-02-1295.9491.41+1.26SHW ahead
2026-02-1194.4991.61+0.96SHW ahead
2026-02-1093.8990.80+1.01SHW ahead
2026-02-0992.8590.35+0.90SHW ahead
2026-02-0693.2193.42+0.38near the usual relationship
2026-02-0592.9791.53+0.69SHW ahead
2026-02-0494.9992.87+0.81SHW ahead
2026-02-0392.6089.83+0.95SHW ahead
2026-02-0291.7689.01+0.95SHW ahead
2026-01-3091.3285.48+1.57SHW ahead
2026-01-2991.3085.61+1.56SHW ahead
2026-01-2890.0292.63-0.05near the usual relationship
2026-01-2789.1193.63-0.41near the usual relationship
2026-01-2689.6993.34-0.24near the usual relationship
2026-01-2389.7491.88+0.04near the usual relationship
2026-01-2290.2889.71+0.56SHW ahead
2026-01-2191.7589.33+0.91SHW ahead
2026-01-2089.3485.63+1.19SHW ahead
2026-01-1692.1485.70+1.73SHW ahead
2026-01-1591.7085.23+1.76SHW ahead
2026-01-1491.2485.95+1.53SHW ahead
2026-01-1391.6686.96+1.42SHW ahead
2026-01-1292.0985.14+1.90SHW ahead
2026-01-0990.9786.54+1.40SHW ahead
2026-01-0887.8186.35+0.82SHW ahead
2026-01-0785.3483.81+0.84SHW ahead
2026-01-0687.5784.52+1.16SHW ahead
2026-01-0585.5483.71+0.92SHW ahead
2026-01-0284.4285.39+0.32near the usual relationship
2025-12-3183.4484.02+0.41near the usual relationship
2025-12-3083.9884.60+0.40near the usual relationship
2025-12-2983.7485.36+0.19near the usual relationship
2025-12-2683.8086.33+0.00near the usual relationship
2025-12-2483.7886.77-0.10near the usual relationship
2025-12-2383.4485.81+0.02near the usual relationship
2025-12-2283.3986.89-0.21near the usual relationship
2025-12-1982.6286.35-0.27near the usual relationship
2025-12-1883.7887.91-0.35near the usual relationship
2025-12-1784.4489.86-0.60TSCO ahead
2025-12-1684.4288.43-0.32near the usual relationship
2025-12-1584.5788.92-0.39near the usual relationship
2025-12-1284.6487.31-0.05near the usual relationship
2025-12-1184.7987.04+0.03near the usual relationship
2025-12-1084.0188.80-0.50TSCO ahead
2025-12-0982.6987.95-0.61TSCO ahead
2025-12-0884.2389.61-0.62TSCO ahead
2025-12-0585.7790.85-0.55TSCO ahead
2025-12-0486.3691.36-0.54TSCO ahead
2025-12-0387.3590.84-0.24near the usual relationship
2025-12-0286.9089.41-0.06near the usual relationship
2025-12-0187.9390.15+0.00near the usual relationship
2025-11-2888.5092.03-0.26near the usual relationship
2025-11-2688.4291.78-0.23near the usual relationship
2025-11-2588.2391.43-0.21near the usual relationship
2025-11-2487.0389.09+0.00near the usual relationship
2025-11-2186.7988.91-0.02near the usual relationship
2025-11-2084.4688.43-0.40near the usual relationship
2025-11-1984.9288.27-0.28near the usual relationship
2025-11-1883.3889.93-0.91TSCO ahead
2025-11-1784.1590.18-0.81TSCO ahead
2025-11-1485.5393.11-1.08TSCO ahead
2025-11-1387.2594.38-0.98TSCO ahead
2025-11-1288.7694.05-0.64TSCO ahead
2025-11-1188.8693.98-0.62TSCO ahead
2025-11-1088.2093.17-0.60TSCO ahead
2025-11-0787.5991.17-0.36near the usual relationship
2025-11-0685.9289.21-0.32near the usual relationship
2025-11-0586.4690.59-0.48near the usual relationship
2025-11-0488.3189.12+0.15near the usual relationship
2025-11-0389.0088.18+0.45near the usual relationship
2025-10-3188.8290.90-0.09near the usual relationship
2025-10-3089.5890.92+0.04near the usual relationship
2025-10-2989.0291.12-0.10near the usual relationship
2025-10-2891.2793.22-0.07near the usual relationship
2025-10-2786.5494.70-1.22TSCO ahead
2025-10-2486.0094.55-1.30TSCO ahead
2025-10-2385.4294.67-1.44TSCO ahead
2025-10-2285.9592.11-0.89TSCO ahead
2025-10-2187.1592.01-0.64TSCO ahead
2025-10-2085.2992.89-1.17TSCO ahead
2025-10-1785.1692.74-1.18TSCO ahead
2025-10-1685.3592.67-1.13TSCO ahead
2025-10-1585.6893.76-1.27TSCO ahead
2025-10-1486.3393.21-1.05TSCO ahead
2025-10-1385.5392.25-1.04TSCO ahead
2025-10-1085.7091.12-0.80TSCO ahead
2025-10-0985.8091.09-0.77TSCO ahead
2025-10-0886.9290.59-0.46near the usual relationship
2025-10-0786.7890.23-0.42near the usual relationship
2025-10-0686.7591.88-0.73TSCO ahead
2025-10-0389.2593.79-0.61TSCO ahead
2025-10-0288.5594.47-0.87TSCO ahead
2025-10-0187.8693.95-0.91TSCO ahead
2025-09-3089.1695.54-0.96TSCO ahead
2025-09-2988.3095.24-1.08TSCO ahead
2025-09-2688.0494.95-1.09TSCO ahead
2025-09-2587.5794.79-1.16TSCO ahead
2025-09-2488.3196.35-1.30TSCO ahead
2025-09-2388.6998.38-1.60TSCO ahead
2025-09-2289.2097.67-1.39TSCO ahead
2025-09-1989.30100.23-1.84TSCO ahead
2025-09-1890.01100.58-1.78TSCO ahead
2025-09-1790.1899.29-1.54TSCO ahead
2025-09-1690.9599.10-1.37TSCO ahead
2025-09-1591.95100.14-1.37TSCO ahead
2025-09-1292.72101.82-1.53TSCO ahead
2025-09-1194.93100.83-0.95TSCO ahead
2025-09-1092.0498.20-1.03TSCO ahead
2025-09-0993.0599.25-1.04TSCO ahead
2025-09-0896.62100.95-0.68TSCO ahead
2025-09-0595.90101.67-0.94TSCO ahead
2025-09-0494.19101.87-1.31TSCO ahead
2025-09-0393.48101.03-1.31TSCO ahead
2025-09-0292.93103.35-1.83TSCO ahead
2025-08-2994.20103.76-1.68TSCO ahead
2025-08-2894.29105.25-1.94TSCO ahead
2025-08-2794.60104.80-1.82TSCO ahead
2025-08-2694.36103.64-1.68TSCO ahead
2025-08-2594.50103.35-1.62TSCO ahead
2025-08-2296.03103.50-1.37TSCO ahead
2025-08-2193.69102.48-1.65TSCO ahead
2025-08-2094.53102.53-1.51TSCO ahead
2025-08-1994.74104.63-1.87TSCO ahead
2025-08-1892.40102.65-2.00TSCO ahead
2025-08-1593.83101.62-1.54TSCO ahead
2025-08-1494.13100.28-1.23TSCO ahead
2025-08-1394.97100.35-1.09TSCO ahead
2025-08-1292.2199.62-1.52TSCO ahead
2025-08-1191.30100.01-1.81TSCO ahead
2025-08-0890.6899.56-1.87TSCO ahead
2025-08-0790.10100.83-2.27TSCO ahead
2025-08-0690.31101.22-2.34TSCO ahead
2025-08-0590.66100.41-2.13TSCO ahead
2025-08-0489.5799.96-2.32TSCO ahead
2025-08-0188.4396.82-1.96TSCO ahead
2025-07-3185.2095.68-2.51TSCO ahead
2025-07-3085.4897.15-2.81TSCO ahead
2025-07-2986.7798.43-2.83TSCO ahead
2025-07-2886.5697.62-2.75TSCO ahead
2025-07-2587.5799.67-3.00TSCO ahead
2025-07-2487.6099.69-3.03TSCO ahead
2025-07-2388.30100.16-2.99TSCO ahead
2025-07-2287.5799.09-2.97TSCO ahead
2025-07-2187.8896.45-2.27TSCO ahead
2025-07-1887.5795.05-2.00TSCO ahead
2025-07-1787.5295.47-2.10TSCO ahead
2025-07-1687.5194.15-1.79TSCO ahead
2025-07-1587.3094.65-1.95TSCO ahead
2025-07-1488.7197.51-2.25TSCO ahead
2025-07-1189.0795.41-1.66TSCO ahead
2025-07-1090.5996.50-1.52TSCO ahead
2025-07-0990.5296.11-1.42TSCO ahead
2025-07-0889.0995.37-1.56TSCO ahead
2025-07-0789.1795.36-1.50TSCO ahead
2025-07-0391.1591.78-0.26near the usual relationship
2025-07-0290.7792.63-0.51TSCO ahead
2025-07-0191.4990.85+0.03near the usual relationship
2025-06-3088.4188.65-0.13near the usual relationship
2025-06-2789.0286.87+0.38near the usual relationship
2025-06-2688.0387.09+0.14near the usual relationship
2025-06-2588.4888.70-0.08near the usual relationship
2025-06-2489.0189.90-0.19near the usual relationship
2025-06-2388.5290.15-0.31near the usual relationship
2025-06-2085.8788.23-0.43near the usual relationship
2025-06-1885.3587.41-0.36near the usual relationship
2025-06-1785.2485.65-0.05near the usual relationship
2025-06-1686.4686.84-0.03near the usual relationship
2025-06-1386.4986.59+0.03near the usual relationship
2025-06-1291.7286.92+0.85SHW ahead
2025-06-1191.9686.20+1.02SHW ahead
2025-06-1092.8986.49+1.12SHW ahead
2025-06-0992.1784.86+1.29SHW ahead
2025-06-0692.0585.58+1.16SHW ahead
2025-06-0592.1586.44+1.04SHW ahead
2025-06-0493.2782.89+1.81SHW ahead
2025-06-0392.1282.40+1.72SHW ahead
2025-06-0291.5280.40+1.98SHW ahead
2025-05-3092.3981.31+1.96SHW ahead
2025-05-2991.6082.27+1.68SHW ahead
2025-05-2891.3482.42+1.62SHW ahead
2025-05-2792.5284.64+1.44SHW ahead
2025-05-2390.7783.50+1.37SHW ahead
2025-05-2290.8883.45+1.40SHW ahead
2025-05-2191.1484.07+1.35SHW ahead
2025-05-2092.4786.69+1.14SHW ahead
2025-05-1993.2188.89+0.92SHW ahead
2025-05-1693.6089.02+0.96SHW ahead
2025-05-1593.0787.65+1.10SHW ahead
2025-05-1490.4886.32+0.94SHW ahead
2025-05-1391.6887.88+0.88SHW ahead
2025-05-1291.9688.57+0.83SHW ahead
2025-05-0990.6086.18+1.00SHW ahead
2025-05-0891.0486.39+1.04SHW ahead
2025-05-0790.5385.61+1.09SHW ahead
2025-05-0690.7785.71+1.12SHW ahead
2025-05-0592.6586.08+1.34SHW ahead
2025-05-0292.6085.41+1.45SHW ahead
2025-05-0191.0684.59+1.36SHW ahead
2025-04-3090.8785.04+1.28SHW ahead
2025-04-2989.6483.78+1.30SHW ahead
2025-04-2885.5482.32+0.93SHW ahead
2025-04-2585.3983.87+0.67SHW ahead
2025-04-2486.1282.32+1.03SHW ahead
2025-04-2385.2985.23+0.45near the usual relationship
2025-04-2285.4884.47+0.60SHW ahead
2025-04-2182.9983.31+0.40near the usual relationship
2025-04-1785.8484.27+0.69SHW ahead
2025-04-1685.3082.92+0.83SHW ahead
2025-04-1586.7485.68+0.62SHW ahead
2025-04-1487.8187.65+0.48near the usual relationship
2025-04-1186.7286.81+0.44near the usual relationship
2025-04-1084.9586.22+0.26near the usual relationship
2025-04-0986.5886.32+0.50SHW ahead
2025-04-0880.7380.67+0.46near the usual relationship
2025-04-0783.1282.91+0.49near the usual relationship
2025-04-0485.5088.03+0.07near the usual relationship
2025-04-0387.7293.69-0.42near the usual relationship
2025-04-0291.0693.44+0.11near the usual relationship
2025-04-0190.2792.62+0.11near the usual relationship
2025-03-3189.9192.57+0.06near the usual relationship
2025-03-2887.4889.83+0.09near the usual relationship
2025-03-2789.0090.99+0.15near the usual relationship
2025-03-2688.6990.50+0.17near the usual relationship
2025-03-2587.8588.75+0.30near the usual relationship
2025-03-2488.2589.93+0.19near the usual relationship
2025-03-2186.1188.13+0.13near the usual relationship
2025-03-2086.5387.09+0.35near the usual relationship
2025-03-1986.2488.70+0.06near the usual relationship
2025-03-1886.4088.45+0.12near the usual relationship
2025-03-1788.1389.26+0.26near the usual relationship
2025-03-1488.0187.07+0.56SHW ahead
2025-03-1388.0986.79+0.61SHW ahead
2025-03-1290.0887.96+0.73SHW ahead
2025-03-1190.9090.59+0.46near the usual relationship
2025-03-1092.1396.11-0.14near the usual relationship
2025-03-0793.6395.57+0.14near the usual relationship
2025-03-0692.7291.71+0.55SHW ahead
2025-03-0593.2992.32+0.54SHW ahead
2025-03-0491.4892.57+0.25near the usual relationship
2025-03-0391.8692.23+0.35near the usual relationship
2025-02-2893.2892.99+0.45near the usual relationship
2025-02-2791.5491.93+0.35near the usual relationship
2025-02-2692.5992.63+0.40near the usual relationship
2025-02-2590.9095.78-0.27near the usual relationship
2025-02-2488.5494.18-0.40near the usual relationship
2025-02-2188.7294.70-0.45near the usual relationship
2025-02-2090.1397.00-0.56TSCO ahead
2025-02-1990.6097.20-0.52TSCO ahead
2025-02-1890.8996.97-0.45near the usual relationship
2025-02-1491.8995.99-0.19near the usual relationship
2025-02-1392.9995.74+0.00near the usual relationship
2025-02-1291.5493.86+0.05near the usual relationship
2025-02-1193.0592.35+0.47near the usual relationship
2025-02-1092.4891.44+0.52SHW ahead
2025-02-0792.8488.96+0.92SHW ahead
2025-02-0694.0489.14+1.06SHW ahead
2025-02-0593.8590.06+0.91SHW ahead
2025-02-0492.0890.79+0.56SHW ahead
2025-02-0392.0991.69+0.43near the usual relationship
2025-01-3192.2291.32+0.50SHW ahead
2025-01-3094.1391.21+0.78SHW ahead
2025-01-2992.8096.03-0.07near the usual relationship
2025-01-2893.7796.40+0.01near the usual relationship
2025-01-2793.7797.32-0.11near the usual relationship
2025-01-2492.7497.34-0.26near the usual relationship
2025-01-2392.9896.40-0.10near the usual relationship
2025-01-2292.1296.55-0.25near the usual relationship
2025-01-2193.0995.56+0.02near the usual relationship
2025-01-1791.1590.15+0.49near the usual relationship
2025-01-1691.2089.93+0.53SHW ahead
2025-01-1589.3389.21+0.37near the usual relationship
2025-01-1487.9789.34+0.15near the usual relationship
2025-01-1386.5591.68-0.39near the usual relationship
2025-01-1085.0191.71-0.63TSCO ahead
2025-01-0886.9191.37-0.31near the usual relationship
2025-01-0786.1190.50-0.31near the usual relationship
2025-01-0686.9990.13-0.13near the usual relationship
2025-01-0386.6687.24+0.23near the usual relationship
2025-01-0285.7988.00-0.01near the usual relationship
2024-12-3187.5389.14+0.07near the usual relationship
2024-12-3087.2388.35+0.14near the usual relationship
2024-12-2788.3991.66-0.16near the usual relationship
2024-12-2688.9793.22-0.30near the usual relationship
2024-12-2489.2391.54-0.05near the usual relationship
2024-12-2388.7990.20+0.07near the usual relationship
2024-12-2088.9690.59+0.03near the usual relationship
2024-12-1988.1688.71+0.17near the usual relationship
2024-12-1889.7889.10+0.33near the usual relationship
2024-12-1793.4292.47+0.36near the usual relationship
2024-12-1693.9992.91+0.37near the usual relationship
2024-12-1393.8695.91-0.03near the usual relationship
2024-12-1294.4695.85+0.05near the usual relationship
2024-12-1195.7795.92+0.21near the usual relationship
2024-12-1095.6895.66+0.23near the usual relationship
2024-12-0996.9395.33+0.42near the usual relationship
2024-12-0699.1294.91+0.74SHW ahead
2024-12-0599.2094.91+0.75SHW ahead
2024-12-04100.9696.05+0.82SHW ahead
2024-12-03101.7995.75+0.96SHW ahead
2024-12-02101.8697.53+0.74SHW ahead
2024-11-29102.3395.31+1.08SHW ahead
2024-11-27101.4494.74+1.05SHW ahead
2024-11-26102.0094.14+1.19SHW ahead
2024-11-25102.9296.09+1.05SHW ahead
2024-11-2299.9894.65+0.88SHW ahead
2024-11-2198.7091.94+1.08SHW ahead
2024-11-2095.7090.72+0.87SHW ahead
2024-11-1996.1791.68+0.81SHW ahead
2024-11-1896.6593.01+0.69SHW ahead
2024-11-1597.5992.62+0.86SHW ahead
2024-11-14100.0393.10+1.11SHW ahead
2024-11-1399.7293.66+1.00SHW ahead
2024-11-1298.7993.81+0.87SHW ahead
2024-11-11100.2394.61+0.95SHW ahead
2024-11-0899.5696.96+0.58SHW ahead
2024-11-0798.8897.20+0.46near the usual relationship
2024-11-0698.0497.09+0.38near the usual relationship
2024-11-0597.3992.81+0.85SHW ahead
2024-11-0496.4190.84+0.99SHW ahead
2024-11-0192.1789.57+0.62SHW ahead
2024-10-3192.3889.21+0.70SHW ahead
2024-10-3093.1890.03+0.70SHW ahead
2024-10-2993.1190.32+0.66SHW ahead
2024-10-2893.5490.71+0.66SHW ahead
2024-10-2592.4591.65+0.40near the usual relationship
2024-10-2493.1192.16+0.42near the usual relationship
2024-10-2393.4098.14-0.31near the usual relationship
2024-10-2293.0597.92-0.32near the usual relationship
2024-10-2198.3098.99+0.22near the usual relationship
2024-10-18100.00100.00+0.31near the usual relationship

One-day company-specific moves (4+ standard deviations, which block ideas for 10 sessions): Jan 29, 2026 (SHW +1.4%, TSCO -7.6%); Apr 21, 2026 (SHW -2.7%, TSCO -11.7%); Jul 28, 2026 (SHW +8.3%, TSCO -1.1%). Upcoming earnings: TSCO Oct 22, 2026 (pre-market); SHW Oct 27, 2026 (pre-market).

Paired trades

The shared paper book and the replay, kept apart

Forward paper record

No paper position on this pair yet.

Historical simulation (a diagnostic, same rules)

No simulated trade through Oct 20, 2026: the pair rarely passed every test while 2 standard deviations apart.

Per $10,000 a leg. A replay on today's companies cannot prove an edge.

The companies

SHW and TSCO at a glance

SHW The Sherwin-Williams Company

Listing
NYSE · SEC CIK 89800
Industry
RETAIL: Building Materials · SIC 5200 Retail-Building Materials, Hardware, Garden Supply
Market value
$80.5B
Price history
2,521 daily closes, Oct 12, 2016 to Oct 22, 2026

TSCO Tractor Supply Company

Listing
Nasdaq · SEC CIK 916365
Industry
RETAIL: Building Materials · SIC 5200 Retail-Building Materials, Hardware, Garden Supply
Market value
$17.1B
Price history
2,521 daily closes, Oct 12, 2016 to Oct 22, 2026

Daily prices: Nasdaq.com. Filings and industry codes: SEC EDGAR. Earnings dates: Nasdaq earnings calendar.

Related
All pairs →
PairStatusAhead nowIndustry
LOW / SHWWatchlistSHW by 1.60 sdRETAIL: Building Materials
SHW / FASTWatchlistFAST by 1.29 sdSIC 5200 Retail-Building Materials, Hardware, Garden Supply
HD / SHWWatchlistSHW by 1.29 sdRETAIL: Building Materials
FAST / TSCOWatchlistFAST by 1.04 sdSIC 5200 Retail-Building Materials, Hardware, Garden Supply

Follow the research behind the paper book

Boostio is a research-first platform in private beta: crypto candidates, daily market stories, public paper trading and now rival stocks. Exploring these pages stays free and open.

Explore the private beta

Paper only: hypothetical paired positions with modelled costs. No broker, no orders, no real money. A historical simulation is a diagnostic, not proof of an edge. Not investment advice.