SIC 3585 Air-Cond & Warm Air Heatg Equip & Comm & Indl Refrig Equip

Carrier Global Corporation vs Lennox International Inc.

WatchlistCARR / LIIPrices through Nov 5, 2026

Why these are rivals: #2 and #3 by market value ($45B vs $12B) with SEC SIC 3585 (Air-Cond & Warm Air Heatg Equip & Comm & Indl Refrig Equip).

Rivals, but right now the price gap does not have a measured habit of closing, so there is no paper idea, whatever the gap.

  • Mean reversion: ADF t-statistic of the spread: -0.66 (needs <= -2.873 (5% critical value))
  • Speed: half-life of the spread, sessions: 74.41 (needs <= 63)
Business leadership

CARR is the larger business

Annual revenue reported to the SEC. Scale, not market share.

YearCARRLIILarger
2025$21.7B$5.2BCARR
2024$22.5B$5.3BCARR
2023$19.0B$5.0BCARR
2022$17.3B$4.7BCARR
2021$20.6B$4.2BCARR
2020$17.5B$3.6BCARR

CARR led in every year with figures for both. Market value: CARR $45.3B, LII $11.9B.

Stock leadership

CARR is ahead now

Measured against the pair's own last 252 trading days.

CARR leads LII by 1.42 standard deviations: +19.6% over its usual price ratio. 3 lead switches in the last year.

Price change3 mo6 mo12 mo
CARR-16.9%-20.8%-7.5%
LII-20.7%-33.8%-29.1%
Relationship

Not a measured twin today

Only these tests can make a pair tradable on paper.

Pass
Aligned sessions: 1668 (needs >= 254)
Pass
Co-movement: daily return correlation, 252 sessions: 0.67 (needs >= 0.60)
Fail
Mean reversion: ADF t-statistic of the spread: -0.66 (needs <= -2.873 (5% critical value))
Fail
Speed: half-life of the spread, sessions: 74.41 (needs <= 63)
Data
Both stocks current
The twins over two years

Prices side by side, and the gap between them

CARR Carrier Global Corporation LII Lennox International Inc.Price index, 100 = 2024-11-01. Tint = which stock is ahead of the pair's usual 1-year relationship (z beyond +/-0.5).
6080100Nov 2024Nov 2025Nov 2026CARR 73LII 58
Spread z-score: CARR relative to LII, against the 252 sessions before each day. Above 0: CARR ahead; below 0: LII ahead. Lines at +/-2 (idea) and +/-4 (stop).
-4stop-2idea0+2idea+4stopNov 2024Nov 2025Nov 2026
Data table (504 sessions)
DateCARR indexLII indexzAhead
2026-11-0573.3057.80+1.42CARR ahead
2026-11-0476.6859.48+1.56CARR ahead
2026-11-0376.2857.42+1.82CARR ahead
2026-11-0276.0058.60+1.65CARR ahead
2026-10-3073.8857.02+1.66CARR ahead
2026-10-2976.5157.69+1.87CARR ahead
2026-10-2877.5255.12+2.38CARR ahead
2026-10-2779.6761.65+1.70CARR ahead
2026-10-2677.7560.59+1.66CARR ahead
2026-10-2377.4862.31+1.41CARR ahead
2026-10-2277.8162.76+1.40CARR ahead
2026-10-2177.7960.71+1.69CARR ahead
2026-10-2077.3860.28+1.72CARR ahead
2026-10-1976.0658.96+1.78CARR ahead
2026-10-1675.7759.28+1.72CARR ahead
2026-10-1575.7159.41+1.71CARR ahead
2026-10-1474.7257.81+1.85CARR ahead
2026-10-1375.8158.02+1.96CARR ahead
2026-10-1276.3559.11+1.88CARR ahead
2026-10-0976.5459.07+1.93CARR ahead
2026-10-0876.9159.91+1.87CARR ahead
2026-10-0775.7759.39+1.83CARR ahead
2026-10-0677.2860.59+1.85CARR ahead
2026-10-0576.7759.85+1.92CARR ahead
2026-10-0275.9359.04+1.97CARR ahead
2026-10-0176.0759.73+1.90CARR ahead
2026-09-3075.5858.83+2.00CARR ahead
2026-09-2976.2959.68+1.98CARR ahead
2026-09-2876.9761.05+1.88CARR ahead
2026-09-2577.6661.94+1.85CARR ahead
2026-09-2475.5960.94+1.77CARR ahead
2026-09-2375.9161.70+1.72CARR ahead
2026-09-2276.1361.59+1.78CARR ahead
2026-09-2175.2460.26+1.89CARR ahead
2026-09-1874.2359.53+1.90CARR ahead
2026-09-1774.9359.50+2.02CARR ahead
2026-09-1674.7559.83+1.97CARR ahead
2026-09-1576.5160.02+2.19CARR ahead
2026-09-1478.8860.57+2.43CARR ahead
2026-09-1179.1660.66+2.49CARR ahead
2026-09-1078.0361.75+2.21CARR ahead
2026-09-0979.8362.27+2.38CARR ahead
2026-09-0881.4363.83+2.37CARR ahead
2026-09-0482.2664.71+2.37CARR ahead
2026-09-0381.3963.98+2.42CARR ahead
2026-09-0279.3261.97+2.52CARR ahead
2026-09-0178.8762.51+2.41CARR ahead
2026-08-3180.2063.41+2.47CARR ahead
2026-08-2880.9965.19+2.32CARR ahead
2026-08-2781.0664.82+2.43CARR ahead
2026-08-2680.9265.24+2.37CARR ahead
2026-08-2580.6264.47+2.50CARR ahead
2026-08-2482.6166.13+2.54CARR ahead
2026-08-2183.1766.76+2.55CARR ahead
2026-08-2082.8667.29+2.45CARR ahead
2026-08-1984.3169.49+2.32CARR ahead
2026-08-1884.6168.11+2.63CARR ahead
2026-08-1786.1868.96+2.76CARR ahead
2026-08-1486.4969.93+2.68CARR ahead
2026-08-1387.2769.32+2.95CARR ahead
2026-08-1286.9069.75+2.88CARR ahead
2026-08-1187.6471.39+2.75CARR ahead
2026-08-1087.3970.14+3.00CARR ahead
2026-08-0788.1872.87+2.68CARR ahead
2026-08-0688.1172.20+2.84CARR ahead
2026-08-0590.1474.05+2.86CARR ahead
2026-08-0490.4974.03+2.98CARR ahead
2026-08-0387.0272.08+2.87CARR ahead
2026-07-3185.1568.91+3.27CARR ahead
2026-07-3084.5769.17+3.19CARR ahead
2026-07-2982.5571.26+2.46CARR ahead
2026-07-2887.0190.16-0.16near the usual relationship
2026-07-2795.5190.70+1.09CARR ahead
2026-07-2494.8989.67+1.17CARR ahead
2026-07-2395.2689.13+1.32CARR ahead
2026-07-2293.8188.29+1.24CARR ahead
2026-07-2191.8787.81+1.01CARR ahead
2026-07-2092.2788.42+0.98CARR ahead
2026-07-1794.6390.13+1.06CARR ahead
2026-07-1695.5292.56+0.82CARR ahead
2026-07-1594.7090.92+0.95CARR ahead
2026-07-1496.1093.26+0.79CARR ahead
2026-07-1394.5291.34+0.86CARR ahead
2026-07-1095.5291.48+0.99CARR ahead
2026-07-0993.4289.07+1.05CARR ahead
2026-07-0891.9489.11+0.81CARR ahead
2026-07-0794.6092.29+0.71CARR ahead
2026-07-0696.5794.12+0.73CARR ahead
2026-07-0296.5394.46+0.67CARR ahead
2026-07-0199.2894.63+1.05CARR ahead
2026-06-30101.0594.94+1.25CARR ahead
2026-06-29101.1694.26+1.37CARR ahead
2026-06-26101.3893.44+1.53CARR ahead
2026-06-25104.7094.57+1.83CARR ahead
2026-06-24102.0391.43+1.96CARR ahead
2026-06-2397.4786.76+2.07CARR ahead
2026-06-2298.9888.83+1.97CARR ahead
2026-06-1898.9388.23+2.07CARR ahead
2026-06-1795.7385.52+2.05CARR ahead
2026-06-1698.0287.55+2.06CARR ahead
2026-06-1597.9986.86+2.18CARR ahead
2026-06-1296.3184.87+2.28CARR ahead
2026-06-1196.0785.68+2.11CARR ahead
2026-06-1093.6483.65+2.10CARR ahead
2026-06-0998.1487.67+2.11CARR ahead
2026-06-0892.7885.08+1.72CARR ahead
2026-06-0592.5284.25+1.83CARR ahead
2026-06-0494.4285.85+1.87CARR ahead
2026-06-0393.1085.39+1.74CARR ahead
2026-06-0291.5085.57+1.45CARR ahead
2026-06-0189.7082.32+1.75CARR ahead
2026-05-2987.9983.21+1.28CARR ahead
2026-05-2887.9082.36+1.43CARR ahead
2026-05-2788.8783.38+1.42CARR ahead
2026-05-2689.3983.28+1.53CARR ahead
2026-05-2286.9880.31+1.68CARR ahead
2026-05-2185.6679.62+1.58CARR ahead
2026-05-2087.6081.75+1.52CARR ahead
2026-05-1984.6479.99+1.33CARR ahead
2026-05-1888.8783.09+1.50CARR ahead
2026-05-1589.0982.85+1.59CARR ahead
2026-05-1491.9385.24+1.65CARR ahead
2026-05-1390.3384.10+1.59CARR ahead
2026-05-1290.3284.27+1.57CARR ahead
2026-05-1190.7686.41+1.25CARR ahead
2026-05-0892.0786.38+1.49CARR ahead
2026-05-0792.6087.26+1.43CARR ahead
2026-05-0693.5489.71+1.14CARR ahead
2026-05-0588.4186.53+0.81CARR ahead
2026-05-0490.7785.32+1.46CARR ahead
2026-05-0193.1587.22+1.54CARR ahead
2026-04-3092.5388.64+1.18CARR ahead
2026-04-2985.0585.77+0.35near the usual relationship
2026-04-2885.4182.11+1.13CARR ahead
2026-04-2785.2983.23+0.90CARR ahead
2026-04-2483.9981.36+1.03CARR ahead
2026-04-2384.7881.81+1.10CARR ahead
2026-04-2283.5581.16+1.00CARR ahead
2026-04-2185.0181.64+1.19CARR ahead
2026-04-2084.9381.77+1.16CARR ahead
2026-04-1784.4780.72+1.29CARR ahead
2026-04-1682.2679.41+1.13CARR ahead
2026-04-1580.6680.25+0.65CARR ahead
2026-04-1489.0886.24+1.10CARR ahead
2026-04-1388.6185.82+1.10CARR ahead
2026-04-1087.2683.73+1.26CARR ahead
2026-04-0984.6780.98+1.33CARR ahead
2026-04-0880.3079.22+0.83CARR ahead
2026-04-0776.3774.68+0.98CARR ahead
2026-04-0676.5875.16+0.93CARR ahead
2026-04-0276.7575.34+0.93CARR ahead
2026-04-0178.3977.03+0.92CARR ahead
2026-03-3177.5776.91+0.78CARR ahead
2026-03-3074.8973.57+0.94CARR ahead
2026-03-2774.7372.56+1.14CARR ahead
2026-03-2675.3172.63+1.26CARR ahead
2026-03-2581.6279.82+1.04CARR ahead
2026-03-2480.7079.04+1.02CARR ahead
2026-03-2380.3179.04+0.94CARR ahead
2026-03-2080.0077.53+1.20CARR ahead
2026-03-1981.2479.08+1.14CARR ahead
2026-03-1879.3679.21+0.73CARR ahead
2026-03-1778.5080.70+0.24near the usual relationship
2026-03-1676.9479.35+0.19near the usual relationship
2026-03-1376.6679.70+0.05near the usual relationship
2026-03-1277.8279.92+0.26near the usual relationship
2026-03-1180.8584.29+0.01near the usual relationship
2026-03-1080.4984.82-0.16near the usual relationship
2026-03-0980.8985.66-0.25near the usual relationship
2026-03-0680.3885.75-0.36near the usual relationship
2026-03-0583.2187.61-0.15near the usual relationship
2026-03-0484.1491.25-0.63LII ahead
2026-03-0384.2791.52-0.65LII ahead
2026-03-0287.9593.36-0.27near the usual relationship
2026-02-2788.7294.44-0.31near the usual relationship
2026-02-2686.4690.21+0.02near the usual relationship
2026-02-2584.7289.47-0.17near the usual relationship
2026-02-2487.5292.52-0.19near the usual relationship
2026-02-2387.4291.94-0.10near the usual relationship
2026-02-2088.3692.96-0.09near the usual relationship
2026-02-1986.6891.19-0.09near the usual relationship
2026-02-1888.6291.78+0.17near the usual relationship
2026-02-1791.5193.71+0.36near the usual relationship
2026-02-1390.1093.90+0.08near the usual relationship
2026-02-1289.3992.56+0.19near the usual relationship
2026-02-1192.4192.38+0.75CARR ahead
2026-02-1090.6790.90+0.71CARR ahead
2026-02-0989.9887.71+1.16CARR ahead
2026-02-0688.0687.82+0.80CARR ahead
2026-02-0586.9385.70+0.99CARR ahead
2026-02-0487.5588.58+0.59CARR ahead
2026-02-0384.3184.26+0.79CARR ahead
2026-02-0283.1582.07+0.99CARR ahead
2026-01-3082.0882.04+0.80CARR ahead
2026-01-2982.3782.21+0.83CARR ahead
2026-01-2879.7880.78+0.61CARR ahead
2026-01-2778.6282.66+0.03near the usual relationship
2026-01-2679.0384.91-0.31near the usual relationship
2026-01-2378.9484.47-0.24near the usual relationship
2026-01-2279.1384.46-0.20near the usual relationship
2026-01-2179.5485.58-0.32near the usual relationship
2026-01-2076.0683.76-0.67LII ahead
2026-01-1677.4187.14-1.02LII ahead
2026-01-1576.5386.55-1.09LII ahead
2026-01-1476.5987.04-1.17LII ahead
2026-01-1376.0687.99-1.45LII ahead
2026-01-1276.2988.36-1.48LII ahead
2026-01-0977.4987.86-1.15LII ahead
2026-01-0874.2085.61-1.44LII ahead
2026-01-0772.4283.68-1.47LII ahead
2026-01-0673.7086.14-1.67LII ahead
2026-01-0574.1083.50-1.09LII ahead
2026-01-0273.7382.67-1.02LII ahead
2025-12-3172.7980.46-0.79LII ahead
2025-12-3073.6181.86-0.89LII ahead
2025-12-2973.8582.29-0.92LII ahead
2025-12-2673.8382.55-0.98LII ahead
2025-12-2473.7082.40-0.98LII ahead
2025-12-2373.4881.95-0.94LII ahead
2025-12-2273.2982.11-1.01LII ahead
2025-12-1974.0782.34-0.89LII ahead
2025-12-1873.2981.86-0.96LII ahead
2025-12-1772.1980.78-0.99LII ahead
2025-12-1673.6281.60-0.84LII ahead
2025-12-1572.4382.21-1.23LII ahead
2025-12-1272.9383.81-1.44LII ahead
2025-12-1174.6085.32-1.37LII ahead
2025-12-1073.5683.81-1.32LII ahead
2025-12-0972.7982.94-1.33LII ahead
2025-12-0873.0583.42-1.37LII ahead
2025-12-0574.7984.78-1.26LII ahead
2025-12-0475.0883.64-0.98LII ahead
2025-12-0375.2482.86-0.80LII ahead
2025-12-0274.1480.75-0.62LII ahead
2025-12-0174.7381.11-0.57LII ahead
2025-11-2875.6082.67-0.69LII ahead
2025-11-2674.8981.76-0.67LII ahead
2025-11-2574.3280.23-0.49near the usual relationship
2025-11-2471.2977.08-0.52LII ahead
2025-11-2172.2077.07-0.31near the usual relationship
2025-11-2069.3873.62-0.22near the usual relationship
2025-11-1970.6073.98-0.02near the usual relationship
2025-11-1871.6575.49-0.11near the usual relationship
2025-11-1773.1976.21+0.08near the usual relationship
2025-11-1474.5378.13-0.04near the usual relationship
2025-11-1375.9978.99+0.10near the usual relationship
2025-11-1277.1379.03+0.33near the usual relationship
2025-11-1178.4880.76+0.26near the usual relationship
2025-11-1078.9881.10+0.29near the usual relationship
2025-11-0779.2381.56+0.24near the usual relationship
2025-11-0677.9381.36+0.02near the usual relationship
2025-11-0578.3281.20+0.13near the usual relationship
2025-11-0479.2881.56+0.25near the usual relationship
2025-11-0379.7181.84+0.28near the usual relationship
2025-10-3181.9583.68+0.36near the usual relationship
2025-10-3081.0782.14+0.49near the usual relationship
2025-10-2983.6980.83+1.26CARR ahead
2025-10-2880.9283.05+0.28near the usual relationship
2025-10-2780.3083.22+0.12near the usual relationship
2025-10-2479.6882.23+0.17near the usual relationship
2025-10-2378.6982.02+0.00near the usual relationship
2025-10-2278.1781.71-0.05near the usual relationship
2025-10-2182.4190.97-0.89LII ahead
2025-10-2079.4588.61-1.05LII ahead
2025-10-1777.4286.66-1.11LII ahead
2025-10-1678.1886.82-1.00LII ahead
2025-10-1578.8187.33-0.97LII ahead
2025-10-1479.2187.96-1.00LII ahead
2025-10-1378.3486.87-0.99LII ahead
2025-10-1078.0586.91-1.06LII ahead
2025-10-0980.0488.54-0.97LII ahead
2025-10-0882.3891.90-1.09LII ahead
2025-10-0781.5389.82-0.92LII ahead
2025-10-0682.3991.74-1.07LII ahead
2025-10-0382.1791.24-1.04LII ahead
2025-10-0281.1490.58-1.12LII ahead
2025-10-0181.9189.00-0.75LII ahead
2025-09-3082.2487.72-0.51LII ahead
2025-09-2981.4686.28-0.42near the usual relationship
2025-09-2681.0686.49-0.52LII ahead
2025-09-2580.9385.54-0.40near the usual relationship
2025-09-2481.2686.57-0.51LII ahead
2025-09-2382.3087.93-0.56LII ahead
2025-09-2283.0888.46-0.52LII ahead
2025-09-1983.1989.42-0.65LII ahead
2025-09-1884.1789.77-0.55LII ahead
2025-09-1783.6590.47-0.74LII ahead
2025-09-1683.9491.21-0.81LII ahead
2025-09-1584.3691.45-0.79LII ahead
2025-09-1284.9690.22-0.52LII ahead
2025-09-1185.8294.00-0.94LII ahead
2025-09-1086.1092.59-0.70LII ahead
2025-09-0987.4492.48-0.48near the usual relationship
2025-09-0890.3896.19-0.57LII ahead
2025-09-0590.2595.79-0.54LII ahead
2025-09-0487.5393.02-0.56LII ahead
2025-09-0386.0690.32-0.40near the usual relationship
2025-09-0287.4890.07-0.15near the usual relationship
2025-08-2989.8292.44-0.15near the usual relationship
2025-08-2891.1692.71+0.01near the usual relationship
2025-08-2793.1193.96+0.11near the usual relationship
2025-08-2691.5894.06-0.13near the usual relationship
2025-08-2590.9294.54-0.29near the usual relationship
2025-08-2293.3398.09-0.43near the usual relationship
2025-08-2189.5694.56-0.50LII ahead
2025-08-2092.0897.62-0.55LII ahead
2025-08-1992.27101.66-1.07LII ahead
2025-08-1891.6099.43-0.87LII ahead
2025-08-1590.1098.04-0.91LII ahead
2025-08-1490.5999.29-1.01LII ahead
2025-08-1392.37101.36-1.03LII ahead
2025-08-1290.5597.85-0.83LII ahead
2025-08-1189.3896.50-0.82LII ahead
2025-08-0890.9696.47-0.58LII ahead
2025-08-0791.4298.41-0.78LII ahead
2025-08-0691.0798.58-0.86LII ahead
2025-08-0591.4599.92-1.00LII ahead
2025-08-0491.6799.50-0.91LII ahead
2025-08-0192.19100.40-0.96LII ahead
2025-07-3194.53100.92-0.69LII ahead
2025-07-3093.95102.01-0.93LII ahead
2025-07-2998.73105.97-0.78LII ahead
2025-07-28110.46108.44+0.43near the usual relationship
2025-07-25111.21109.50+0.39near the usual relationship
2025-07-24109.44110.12+0.10near the usual relationship
2025-07-23109.67109.50+0.20near the usual relationship
2025-07-22105.28102.73+0.51CARR ahead
2025-07-21104.6699.60+0.86CARR ahead
2025-07-18105.57100.99+0.79CARR ahead
2025-07-17105.98101.39+0.79CARR ahead
2025-07-16103.9198.95+0.86CARR ahead
2025-07-15103.84100.12+0.69CARR ahead
2025-07-14105.54101.95+0.67CARR ahead
2025-07-11105.55102.22+0.64CARR ahead
2025-07-10105.76102.31+0.66CARR ahead
2025-07-09104.5599.82+0.84CARR ahead
2025-07-08103.1898.52+0.85CARR ahead
2025-07-07102.8298.11+0.86CARR ahead
2025-07-03104.22100.12+0.77CARR ahead
2025-07-02103.6899.77+0.75CARR ahead
2025-07-01102.3699.20+0.66CARR ahead
2025-06-30100.8394.99+1.06CARR ahead
2025-06-27101.4994.04+1.29CARR ahead
2025-06-26100.0093.54+1.17CARR ahead
2025-06-2599.7893.62+1.14CARR ahead
2025-06-2499.8294.31+1.05CARR ahead
2025-06-2398.8893.49+1.04CARR ahead
2025-06-2097.0891.16+1.14CARR ahead
2025-06-1896.2490.79+1.09CARR ahead
2025-06-1796.1389.06+1.35CARR ahead
2025-06-1697.8690.14+1.44CARR ahead
2025-06-1398.1489.17+1.65CARR ahead
2025-06-1299.8591.17+1.59CARR ahead
2025-06-1199.8591.30+1.57CARR ahead
2025-06-1098.8492.02+1.32CARR ahead
2025-06-0998.7192.15+1.28CARR ahead
2025-06-0697.8691.53+1.26CARR ahead
2025-06-0598.3691.24+1.38CARR ahead
2025-06-0498.3593.05+1.10CARR ahead
2025-06-0397.5392.92+1.00CARR ahead
2025-06-0296.9091.43+1.13CARR ahead
2025-05-3098.0993.53+0.98CARR ahead
2025-05-2998.3794.37+0.89CARR ahead
2025-05-2897.8694.16+0.84CARR ahead
2025-05-2799.6495.98+0.82CARR ahead
2025-05-2397.7893.98+0.84CARR ahead
2025-05-2298.8795.22+0.81CARR ahead
2025-05-2199.3194.45+0.98CARR ahead
2025-05-20103.2598.94+0.87CARR ahead
2025-05-19104.46100.17+0.85CARR ahead
2025-05-16104.17100.38+0.78CARR ahead
2025-05-15101.2398.47+0.64CARR ahead
2025-05-14101.0697.99+0.68CARR ahead
2025-05-13102.8499.81+0.66CARR ahead
2025-05-12101.1798.72+0.58CARR ahead
2025-05-0998.4295.07+0.71CARR ahead
2025-05-0897.1295.51+0.45near the usual relationship
2025-05-0796.4294.12+0.55CARR ahead
2025-05-0696.6993.90+0.61CARR ahead
2025-05-0597.5593.28+0.81CARR ahead
2025-05-0298.5493.05+0.97CARR ahead
2025-05-0196.1692.30+0.75CARR ahead
2025-04-3086.1690.60-0.46near the usual relationship
2025-04-2983.7988.64-0.54LII ahead
2025-04-2883.3388.02-0.52LII ahead
2025-04-2582.7487.38-0.52LII ahead
2025-04-2483.0886.84-0.39near the usual relationship
2025-04-2380.7384.31-0.38near the usual relationship
2025-04-2281.9392.62-1.43LII ahead
2025-04-2180.1589.65-1.30LII ahead
2025-04-1782.5292.16-1.29LII ahead
2025-04-1681.5490.78-1.26LII ahead
2025-04-1583.3092.33-1.21LII ahead
2025-04-1483.4792.57-1.22LII ahead
2025-04-1181.6491.87-1.43LII ahead
2025-04-1081.3591.19-1.39LII ahead
2025-04-0983.7292.99-1.28LII ahead
2025-04-0876.5384.60-1.22LII ahead
2025-04-0778.2986.87-1.28LII ahead
2025-04-0478.7788.04-1.39LII ahead
2025-04-0383.6590.61-0.97LII ahead
2025-04-0289.6095.20-0.70LII ahead
2025-04-0187.5393.60-0.79LII ahead
2025-03-3187.3492.93-0.73LII ahead
2025-03-2887.2491.64-0.56LII ahead
2025-03-2790.4795.67-0.65LII ahead
2025-03-2692.2695.93-0.42near the usual relationship
2025-03-2593.8397.42-0.40near the usual relationship
2025-03-2493.6297.15-0.39near the usual relationship
2025-03-2191.1694.38-0.37near the usual relationship
2025-03-2091.5195.91-0.54LII ahead
2025-03-1993.2498.00-0.58LII ahead
2025-03-1892.7196.34-0.42near the usual relationship
2025-03-1793.1797.63-0.54LII ahead
2025-03-1491.6595.27-0.44near the usual relationship
2025-03-1388.5192.55-0.52LII ahead
2025-03-1290.1494.39-0.55LII ahead
2025-03-1190.4493.82-0.42near the usual relationship
2025-03-1092.37100.19-1.04LII ahead
2025-03-0792.84100.52-1.03LII ahead
2025-03-0690.0596.76-0.92LII ahead
2025-03-0589.3697.45-1.14LII ahead
2025-03-0485.5194.95-1.40LII ahead
2025-03-0387.1597.27-1.48LII ahead
2025-02-2889.2799.60-1.49LII ahead
2025-02-2788.2899.80-1.69LII ahead
2025-02-2691.06103.23-1.74LII ahead
2025-02-2592.57102.53-1.42LII ahead
2025-02-2491.68101.03-1.36LII ahead
2025-02-2191.10101.74-1.56LII ahead
2025-02-2092.45106.28-2.01LII ahead
2025-02-1990.89107.90-2.51LII ahead
2025-02-1891.73105.40-2.06LII ahead
2025-02-1489.72103.10-2.09LII ahead
2025-02-1387.71102.73-2.41LII ahead
2025-02-1287.62100.87-2.18LII ahead
2025-02-1189.7699.81-1.67LII ahead
2025-02-1091.2496.63-0.92LII ahead
2025-02-0788.4095.31-1.21LII ahead
2025-02-0689.8397.00-1.24LII ahead
2025-02-0588.9496.94-1.40LII ahead
2025-02-0488.0095.84-1.39LII ahead
2025-02-0387.0096.60-1.71LII ahead
2025-01-3190.0798.17-1.44LII ahead
2025-01-3090.88100.51-1.68LII ahead
2025-01-2989.27100.14-1.92LII ahead
2025-01-2892.71109.80-2.82LII ahead
2025-01-2792.89108.70-2.68LII ahead
2025-01-2496.60109.80-2.25LII ahead
2025-01-2396.27110.52-2.45LII ahead
2025-01-2296.47109.92-2.36LII ahead
2025-01-2197.19109.96-2.27LII ahead
2025-01-1795.96107.29-2.10LII ahead
2025-01-1696.07106.53-1.98LII ahead
2025-01-1594.78104.52-1.91LII ahead
2025-01-1494.23104.02-1.95LII ahead
2025-01-1392.45102.49-2.05LII ahead
2025-01-1091.62101.09-1.99LII ahead
2025-01-0894.30103.66-1.95LII ahead
2025-01-0793.97101.30-1.63LII ahead
2025-01-0694.65101.08-1.47LII ahead
2025-01-0395.41101.53-1.43LII ahead
2025-01-0294.13100.17-1.44LII ahead
2024-12-3194.03100.97-1.61LII ahead
2024-12-3093.99101.74-1.77LII ahead
2024-12-2794.92102.74-1.79LII ahead
2024-12-2695.94104.34-1.90LII ahead
2024-12-2495.67104.58-2.02LII ahead
2024-12-2394.77103.58-2.04LII ahead
2024-12-2094.35104.11-2.24LII ahead
2024-12-1991.87102.72-2.53LII ahead
2024-12-1892.34105.77-3.04LII ahead
2024-12-1796.82108.97-2.76LII ahead
2024-12-1698.62110.70-2.76LII ahead
2024-12-13100.58110.11-2.30LII ahead
2024-12-12101.31109.70-2.11LII ahead
2024-12-11101.53108.95-1.96LII ahead
2024-12-10100.30107.13-1.89LII ahead
2024-12-09100.84105.85-1.56LII ahead
2024-12-06101.49109.55-2.14LII ahead
2024-12-05101.93107.93-1.78LII ahead
2024-12-04103.84110.28-1.86LII ahead
2024-12-03104.12110.02-1.77LII ahead
2024-12-02105.10110.60-1.71LII ahead
2024-11-29106.58110.55-1.42LII ahead
2024-11-27105.94109.37-1.34LII ahead
2024-11-26105.99110.40-1.53LII ahead
2024-11-25108.65112.42-1.41LII ahead
2024-11-22106.08108.98-1.27LII ahead
2024-11-21104.71107.81-1.33LII ahead
2024-11-20102.63103.63-0.92LII ahead
2024-11-19102.40103.33-0.92LII ahead
2024-11-18102.01102.77-0.89LII ahead
2024-11-15102.67101.11-0.42near the usual relationship
2024-11-14103.28102.38-0.56LII ahead
2024-11-13105.25102.63-0.22near the usual relationship
2024-11-12103.93102.09-0.38near the usual relationship
2024-11-11105.10104.47-0.63LII ahead
2024-11-08105.63104.55-0.55LII ahead
2024-11-07103.50103.11-0.69LII ahead
2024-11-06103.84100.22-0.03near the usual relationship
2024-11-05101.80103.67-1.16LII ahead
2024-11-0499.74100.20-0.88LII ahead
2024-11-01100.00100.00-0.79LII ahead

One-day company-specific moves (4+ standard deviations, which block ideas for 10 sessions): Apr 23, 2025 (CARR -1.5%, LII -9.0%); May 1, 2025 (CARR +11.6%, LII +1.9%); Jul 29, 2025 (CARR -10.6%, LII -2.3%); Jul 28, 2026 (CARR -8.9%, LII -0.6%); Jul 29, 2026 (CARR -5.1%, LII -21.0%); Oct 28, 2026 (CARR -2.7%, LII -10.6%).

Paired trades

The shared paper book and the replay, kept apart

Forward paper record

No paper position on this pair yet.

Historical simulation (a diagnostic, same rules)

1 simulated trade to Nov 3, 2026: +6.52% per trade on average after costs, 1 won.

LegsEnteredExitedWhyDaysBefore costsCosts + borrowAfter costs
Long CARR · Short LIISep 2, 2022Jan 5, 2023converged125$733.14-$79.48$652.39 (+6.52%)

Per $10,000 a leg. A replay on today's companies cannot prove an edge.

The companies

CARR and LII at a glance

CARR Carrier Global Corporation

Listing
NYSE · SEC CIK 1783180
Industry
Industrial Machinery/Components · SIC 3585 Air-Cond & Warm Air Heatg Equip & Comm & Indl Refrig Equip
Market value
$45.3B
Price history
1,668 daily closes, Mar 19, 2020 to Nov 5, 2026

LII Lennox International Inc.

Listing
NYSE · SEC CIK 1069202
Industry
Industrial Machinery/Components · SIC 3585 Air-Cond & Warm Air Heatg Equip & Comm & Indl Refrig Equip
Market value
$11.9B
Price history
2,531 daily closes, Oct 12, 2016 to Nov 5, 2026

Daily prices: Nasdaq.com. Filings and industry codes: SEC EDGAR. Earnings dates: Nasdaq earnings calendar.

Related
All pairs →
PairStatusAhead nowIndustry
JCI / LIIWatchlistJCI by 1.32 sdSIC 3585 Air-Cond & Warm Air Heatg Equip & Comm & Indl Refrig Equip
JCI / CARRWatchlistJCI by 0.92 sdSIC 3585 Air-Cond & Warm Air Heatg Equip & Comm & Indl Refrig Equip

Follow the research behind the paper book

Boostio is a research-first platform in private beta: crypto candidates, daily market stories, public paper trading and now rival stocks. Exploring these pages stays free and open.

Explore the private beta

Paper only: hypothetical paired positions with modelled costs. No broker, no orders, no real money. A historical simulation is a diagnostic, not proof of an edge. Not investment advice.