Shoe Manufacturing

Nike Inc. vs On Holding AG

WatchlistNKE / ONONPrices through Nov 5, 2026

Why these are rivals: #1 and #2 by market value ($57B vs $22B) in Nasdaq's "Shoe Manufacturing" industry; SEC SIC 3021 / 3021 (same major group); #1 and #2 by market value ($57B vs $22B) with SEC SIC 3021 (Rubber & Plastics Footwear).

Rivals, but right now the price gap does not have a measured habit of closing, so there is no paper idea, whatever the gap.

  • Co-movement: daily return correlation, 252 sessions: 0.36 (needs >= 0.60)
  • Mean reversion: ADF t-statistic of the spread: -2.75 (needs <= -2.873 (5% critical value))
Business leadership

Business size

Annual revenue reported to the SEC. Scale, not market share.

YearNKEONONLarger
2025$46.4B--
2024$46.3B--
2023$51.4B--
2022$51.2B--
2021$46.7B--
2020$44.5B--

Market value: NKE $57.2B, ONON $22.0B.

Stock leadership

ONON is ahead now

Measured against the pair's own last 252 trading days.

ONON leads NKE by 1.71 standard deviations: +21.3% over its usual price ratio. 3 lead switches in the last year.

Price change3 mo6 mo12 mo
NKE-5.1%-10.9%-35.4%
ONON-0.0%+5.3%+3.7%
Relationship

Not a measured twin today

Only these tests can make a pair tradable on paper.

Pass
Aligned sessions: 1292 (needs >= 254)
Fail
Co-movement: daily return correlation, 252 sessions: 0.36 (needs >= 0.60)
Fail
Mean reversion: ADF t-statistic of the spread: -2.75 (needs <= -2.873 (5% critical value))
Pass
Speed: half-life of the spread, sessions: 14.73 (needs <= 63)
Data
Both stocks current
The twins over two years

Prices side by side, and the gap between them

NKE Nike Inc. ONON On Holding AGPrice index, 100 = 2024-11-01. Tint = which stock is ahead of the pair's usual 1-year relationship (z beyond +/-0.5).
50100Nov 2024Nov 2025Nov 2026NKE 51ONON 81
Spread z-score: NKE relative to ONON, against the 252 sessions before each day. Above 0: NKE ahead; below 0: ONON ahead. Lines at +/-2 (idea) and +/-4 (stop).
-4stop-2idea0+2idea+4stopNov 2024Nov 2025Nov 2026
Data table (504 sessions)
DateNKE indexONON indexzAhead
2026-11-0550.6880.73-1.71ONON ahead
2026-11-0451.8783.05-1.76ONON ahead
2026-11-0349.3078.49-1.72ONON ahead
2026-11-0250.1276.39-1.34ONON ahead
2026-10-3049.5472.65-1.01ONON ahead
2026-10-2949.2270.54-0.82ONON ahead
2026-10-2847.5968.69-0.89ONON ahead
2026-10-2748.1269.18-0.86ONON ahead
2026-10-2648.5771.33-1.04ONON ahead
2026-10-2347.7869.91-1.02ONON ahead
2026-10-2249.0973.12-1.17ONON ahead
2026-10-2148.0873.59-1.41ONON ahead
2026-10-2048.5376.17-1.63ONON ahead
2026-10-1947.6776.15-1.79ONON ahead
2026-10-1647.5774.73-1.66ONON ahead
2026-10-1547.5875.68-1.78ONON ahead
2026-10-1445.2276.34-2.30ONON ahead
2026-10-1345.2676.32-2.32ONON ahead
2026-10-1245.2976.02-2.31ONON ahead
2026-10-0944.4775.46-2.43ONON ahead
2026-10-0844.5073.20-2.19ONON ahead
2026-10-0744.0271.44-2.09ONON ahead
2026-10-0644.3471.25-2.02ONON ahead
2026-10-0543.5068.56-1.87ONON ahead
2026-10-0243.3966.34-1.62ONON ahead
2026-10-0145.0364.95-1.14ONON ahead
2026-09-3045.3563.68-0.92ONON ahead
2026-09-2945.9163.55-0.81ONON ahead
2026-09-2846.6264.52-0.81ONON ahead
2026-09-2545.8064.43-0.95ONON ahead
2026-09-2446.1165.51-1.04ONON ahead
2026-09-2346.1864.86-0.96ONON ahead
2026-09-2246.2563.20-0.74ONON ahead
2026-09-2146.2558.75-0.14near the usual relationship
2026-09-1845.4958.62-0.27near the usual relationship
2026-09-1746.5858.77-0.10near the usual relationship
2026-09-1645.8458.39-0.19near the usual relationship
2026-09-1546.4057.55+0.02near the usual relationship
2026-09-1447.4659.08-0.01near the usual relationship
2026-09-1147.1458.95-0.06near the usual relationship
2026-09-1046.9157.74+0.06near the usual relationship
2026-09-0947.8557.72+0.21near the usual relationship
2026-09-0848.8158.65+0.24near the usual relationship
2026-09-0449.1960.19+0.09near the usual relationship
2026-09-0349.6760.99+0.05near the usual relationship
2026-09-0248.9959.78+0.10near the usual relationship
2026-09-0148.8359.63+0.08near the usual relationship
2026-08-3150.0461.29+0.05near the usual relationship
2026-08-2850.7362.04+0.06near the usual relationship
2026-08-2749.2462.26-0.20near the usual relationship
2026-08-2649.4462.86-0.25near the usual relationship
2026-08-2550.5862.00+0.02near the usual relationship
2026-08-2452.2063.46+0.07near the usual relationship
2026-08-2152.2264.56-0.06near the usual relationship
2026-08-2051.5164.30-0.13near the usual relationship
2026-08-1952.5967.23-0.31near the usual relationship
2026-08-1851.3266.73-0.44near the usual relationship
2026-08-1750.0867.33-0.69ONON ahead
2026-08-1452.1869.29-0.60ONON ahead
2026-08-1352.8267.94-0.38near the usual relationship
2026-08-1251.9066.69-0.38near the usual relationship
2026-08-1152.9366.47-0.22near the usual relationship
2026-08-1053.9583.40-1.71ONON ahead
2026-08-0753.4280.75-1.57ONON ahead
2026-08-0653.8080.30-1.49ONON ahead
2026-08-0554.3882.13-1.59ONON ahead
2026-08-0453.2080.88-1.65ONON ahead
2026-08-0354.6281.61-1.54ONON ahead
2026-07-3153.4377.94-1.38ONON ahead
2026-07-3054.1879.78-1.46ONON ahead
2026-07-2955.3781.53-1.48ONON ahead
2026-07-2855.1581.48-1.52ONON ahead
2026-07-2753.9879.70-1.52ONON ahead
2026-07-2453.4277.03-1.36ONON ahead
2026-07-2352.5174.92-1.29ONON ahead
2026-07-2254.0778.82-1.46ONON ahead
2026-07-2155.0380.09-1.46ONON ahead
2026-07-2055.6980.97-1.47ONON ahead
2026-07-1756.0680.00-1.34ONON ahead
2026-07-1657.1082.15-1.41ONON ahead
2026-07-1554.7980.56-1.58ONON ahead
2026-07-1454.9181.16-1.64ONON ahead
2026-07-1356.0681.55-1.53ONON ahead
2026-07-1056.8482.88-1.56ONON ahead
2026-07-0954.8079.08-1.49ONON ahead
2026-07-0854.9478.24-1.40ONON ahead
2026-07-0755.3578.75-1.40ONON ahead
2026-07-0655.5279.29-1.45ONON ahead
2026-07-0256.4879.20-1.31ONON ahead
2026-07-0155.1676.47-1.23ONON ahead
2026-06-3052.5976.17-1.59ONON ahead
2026-06-2953.1476.17-1.51ONON ahead
2026-06-2652.2079.72-2.02ONON ahead
2026-06-2552.4078.67-1.89ONON ahead
2026-06-2453.5779.40-1.79ONON ahead
2026-06-2354.2975.57-1.28ONON ahead
2026-06-2255.3377.87-1.37ONON ahead
2026-06-1857.9083.61-1.57ONON ahead
2026-06-1756.6181.12-1.51ONON ahead
2026-06-1657.7081.85-1.43ONON ahead
2026-06-1557.9083.20-1.52ONON ahead
2026-06-1257.5682.97-1.54ONON ahead
2026-06-1158.8884.32-1.49ONON ahead
2026-06-1056.3281.72-1.59ONON ahead
2026-06-0957.2082.26-1.51ONON ahead
2026-06-0855.3879.81-1.52ONON ahead
2026-06-0555.0679.74-1.55ONON ahead
2026-06-0455.8880.58-1.51ONON ahead
2026-06-0356.1280.69-1.47ONON ahead
2026-06-0256.0282.41-1.63ONON ahead
2026-06-0158.8485.23-1.50ONON ahead
2026-05-2959.2287.78-1.66ONON ahead
2026-05-2860.6885.48-1.26ONON ahead
2026-05-2758.9085.20-1.45ONON ahead
2026-05-2657.5786.71-1.74ONON ahead
2026-05-2257.2385.61-1.68ONON ahead
2026-05-2156.8784.28-1.60ONON ahead
2026-05-2056.6181.40-1.37ONON ahead
2026-05-1954.3480.30-1.56ONON ahead
2026-05-1854.5381.94-1.67ONON ahead
2026-05-1553.6580.13-1.62ONON ahead
2026-05-1453.8379.23-1.51ONON ahead
2026-05-1354.2476.11-1.17ONON ahead
2026-05-1254.2572.75-0.84ONON ahead
2026-05-1154.3073.20-0.87ONON ahead
2026-05-0856.5575.78-0.83ONON ahead
2026-05-0756.8976.67-0.86ONON ahead
2026-05-0656.2177.55-1.03ONON ahead
2026-05-0555.1674.39-0.87ONON ahead
2026-05-0455.2073.74-0.80ONON ahead
2026-05-0156.8874.28-0.63ONON ahead
2026-04-3056.8376.58-0.85ONON ahead
2026-04-2956.8775.98-0.79ONON ahead
2026-04-2857.6976.19-0.71ONON ahead
2026-04-2757.8377.27-0.79ONON ahead
2026-04-2457.2577.96-0.93ONON ahead
2026-04-2357.3777.89-0.91ONON ahead
2026-04-2258.5278.71-0.85ONON ahead
2026-04-2159.4378.99-0.77ONON ahead
2026-04-2059.5480.11-0.85ONON ahead
2026-04-1758.9779.46-0.87ONON ahead
2026-04-1658.5476.17-0.62ONON ahead
2026-04-1558.2176.19-0.66ONON ahead
2026-04-1456.6276.52-0.89ONON ahead
2026-04-1354.9773.53-0.81ONON ahead
2026-04-1054.6072.15-0.73ONON ahead
2026-04-0956.3774.06-0.69ONON ahead
2026-04-0855.2572.71-0.71ONON ahead
2026-04-0754.6969.27-0.44near the usual relationship
2026-04-0656.4172.41-0.54ONON ahead
2026-04-0256.6171.03-0.38near the usual relationship
2026-04-0157.1774.77-0.68ONON ahead
2026-03-3167.6773.16+0.69NKE ahead
2026-03-3065.6468.56+0.95NKE ahead
2026-03-2765.8169.66+0.85NKE ahead
2026-03-2666.7169.05+1.02NKE ahead
2026-03-2567.8775.61+0.49near the usual relationship
2026-03-2468.5285.14-0.30near the usual relationship
2026-03-2367.5285.72-0.46near the usual relationship
2026-03-2067.0980.99-0.10near the usual relationship
2026-03-1968.4683.59-0.18near the usual relationship
2026-03-1868.5083.98-0.22near the usual relationship
2026-03-1770.6185.57-0.14near the usual relationship
2026-03-1670.1984.41-0.08near the usual relationship
2026-03-1369.1581.70+0.04near the usual relationship
2026-03-1269.3481.63+0.06near the usual relationship
2026-03-1171.3684.82-0.01near the usual relationship
2026-03-1071.8488.22-0.25near the usual relationship
2026-03-0972.4288.56-0.22near the usual relationship
2026-03-0673.0389.16-0.21near the usual relationship
2026-03-0574.3393.27-0.41near the usual relationship
2026-03-0475.1292.97-0.32near the usual relationship
2026-03-0376.0894.43-0.34near the usual relationship
2026-03-0278.16100.56-0.60ONON ahead
2026-02-2779.6699.96-0.43near the usual relationship
2026-02-2681.92102.37-0.41near the usual relationship
2026-02-2581.22100.32-0.33near the usual relationship
2026-02-2482.10100.62-0.28near the usual relationship
2026-02-2380.82102.02-0.49near the usual relationship
2026-02-2083.78106.28-0.53ONON ahead
2026-02-1984.05103.27-0.31near the usual relationship
2026-02-1883.97101.78-0.21near the usual relationship
2026-02-1783.04100.34-0.19near the usual relationship
2026-02-1380.8797.40-0.17near the usual relationship
2026-02-1278.2795.20-0.23near the usual relationship
2026-02-1179.8797.40-0.25near the usual relationship
2026-02-1080.7697.42-0.17near the usual relationship
2026-02-0979.9595.35-0.09near the usual relationship
2026-02-0681.8993.48+0.22near the usual relationship
2026-02-0580.3292.30+0.18near the usual relationship
2026-02-0482.2794.34+0.20near the usual relationship
2026-02-0378.0694.90-0.21near the usual relationship
2026-02-0279.6698.80-0.34near the usual relationship
2026-01-3079.1897.31-0.27near the usual relationship
2026-01-2980.1996.82-0.15near the usual relationship
2026-01-2879.7396.47-0.16near the usual relationship
2026-01-2780.8297.89-0.16near the usual relationship
2026-01-2683.2699.94-0.10near the usual relationship
2026-01-2383.3298.84-0.01near the usual relationship
2026-01-2283.86100.26-0.06near the usual relationship
2026-01-2183.7999.57-0.02near the usual relationship
2026-01-2081.5194.88+0.13near the usual relationship
2026-01-1682.4896.88+0.07near the usual relationship
2026-01-1582.7498.92-0.05near the usual relationship
2026-01-1484.0096.92+0.19near the usual relationship
2026-01-1384.93101.63-0.05near the usual relationship
2026-01-1284.09105.18-0.35near the usual relationship
2026-01-0984.45105.63-0.35near the usual relationship
2026-01-0883.60108.88-0.62ONON ahead
2026-01-0780.99104.65-0.57ONON ahead
2026-01-0683.72105.46-0.40near the usual relationship
2026-01-0582.67105.38-0.48near the usual relationship
2026-01-0281.07100.97-0.32near the usual relationship
2025-12-3181.6299.96-0.21near the usual relationship
2025-12-3078.39102.04-0.62ONON ahead
2025-12-2978.41102.06-0.63ONON ahead
2025-12-2678.06100.60-0.56ONON ahead
2025-12-2476.8699.98-0.62ONON ahead
2025-12-2373.46102.99-1.14ONON ahead
2025-12-2273.30103.53-1.20ONON ahead
2025-12-1975.21104.45-1.09ONON ahead
2025-12-1884.08104.22-0.31near the usual relationship
2025-12-1784.15103.44-0.25near the usual relationship
2025-12-1685.99103.85-0.13near the usual relationship
2025-12-1586.83102.77+0.01near the usual relationship
2025-12-1286.43104.86-0.16near the usual relationship
2025-12-1186.78106.45-0.24near the usual relationship
2025-12-1084.28104.77-0.33near the usual relationship
2025-12-0981.13101.74-0.39near the usual relationship
2025-12-0881.40101.12-0.32near the usual relationship
2025-12-0584.37103.53-0.24near the usual relationship
2025-12-0484.15100.02-0.02near the usual relationship
2025-12-0384.10101.23-0.10near the usual relationship
2025-12-0283.1897.10+0.11near the usual relationship
2025-12-0183.7796.09+0.23near the usual relationship
2025-11-2882.8094.60+0.26near the usual relationship
2025-11-2682.4192.88+0.36near the usual relationship
2025-11-2581.5889.81+0.52NKE ahead
2025-11-2479.3487.72+0.49near the usual relationship
2025-11-2180.4588.77+0.51NKE ahead
2025-11-2078.7089.08+0.34near the usual relationship
2025-11-1980.2593.12+0.17near the usual relationship
2025-11-1880.0591.74+0.25near the usual relationship
2025-11-1780.5889.03+0.50NKE ahead
2025-11-1482.2191.18+0.48near the usual relationship
2025-11-1384.5991.18+0.68NKE ahead
2025-11-1282.2489.27+0.63NKE ahead
2025-11-1180.9075.66+1.67NKE ahead
2025-11-1077.8975.18+1.46NKE ahead
2025-11-0778.2675.27+1.49NKE ahead
2025-11-0679.2976.37+1.48NKE ahead
2025-11-0579.5777.59+1.40NKE ahead
2025-11-0478.4477.85+1.28NKE ahead
2025-11-0380.2678.41+1.39NKE ahead
2025-10-3182.7479.89+1.48NKE ahead
2025-10-3083.1480.06+1.51NKE ahead
2025-10-2983.7284.49+1.18NKE ahead
2025-10-2886.3888.54+1.07NKE ahead
2025-10-2787.8790.77+1.01NKE ahead
2025-10-2488.5389.68+1.15NKE ahead
2025-10-2389.2692.97+0.95NKE ahead
2025-10-2288.5090.90+1.05NKE ahead
2025-10-2187.5792.28+0.87NKE ahead
2025-10-2086.6389.18+1.02NKE ahead
2025-10-1786.3189.94+0.94NKE ahead
2025-10-1685.6390.28+0.86NKE ahead
2025-10-1587.7089.12+1.11NKE ahead
2025-10-1486.6590.71+0.90NKE ahead
2025-10-1386.3292.41+0.75NKE ahead
2025-10-1083.5590.02+0.70NKE ahead
2025-10-0987.1993.12+0.76NKE ahead
2025-10-0888.5193.81+0.82NKE ahead
2025-10-0788.2889.70+1.11NKE ahead
2025-10-0691.1791.55+1.19NKE ahead
2025-10-0392.1590.54+1.34NKE ahead
2025-10-0295.5391.10+1.54NKE ahead
2025-10-0195.0688.09+1.75NKE ahead
2025-09-3089.3391.08+1.08NKE ahead
2025-09-2989.1093.74+0.86NKE ahead
2025-09-2688.7991.33+1.01NKE ahead
2025-09-2588.7094.45+0.77NKE ahead
2025-09-2491.2498.41+0.67NKE ahead
2025-09-2390.8798.62+0.63NKE ahead
2025-09-2291.3198.04+0.70NKE ahead
2025-09-1990.8197.27+0.72NKE ahead
2025-09-1892.3696.75+0.87NKE ahead
2025-09-1792.6394.28+1.07NKE ahead
2025-09-1693.2092.52+1.24NKE ahead
2025-09-1593.5691.76+1.32NKE ahead
2025-09-1293.5292.24+1.28NKE ahead
2025-09-1195.2293.12+1.34NKE ahead
2025-09-1095.1292.15+1.40NKE ahead
2025-09-0994.2995.46+1.09NKE ahead
2025-09-0894.9997.20+1.02NKE ahead
2025-09-0594.6897.89+0.94NKE ahead
2025-09-0496.5399.03+0.99NKE ahead
2025-09-0395.7596.34+1.12NKE ahead
2025-09-0295.1796.32+1.07NKE ahead
2025-08-2999.1296.95+1.30NKE ahead
2025-08-2899.8295.89+1.41NKE ahead
2025-08-27100.0097.16+1.33NKE ahead
2025-08-26100.7697.16+1.37NKE ahead
2025-08-25101.4298.04+1.35NKE ahead
2025-08-22100.41100.13+1.13NKE ahead
2025-08-2197.5995.87+1.22NKE ahead
2025-08-2097.6997.29+1.12NKE ahead
2025-08-1998.4996.84+1.19NKE ahead
2025-08-1899.1997.25+1.20NKE ahead
2025-08-1598.6097.51+1.14NKE ahead
2025-08-1497.8695.08+1.24NKE ahead
2025-08-1398.90103.63+0.75NKE ahead
2025-08-1295.95107.12+0.34near the usual relationship
2025-08-1194.8298.32+0.80NKE ahead
2025-08-0895.0498.19+0.81NKE ahead
2025-08-0795.2597.12+0.89NKE ahead
2025-08-0696.69100.67+0.75NKE ahead
2025-08-0595.29101.40+0.61NKE ahead
2025-08-0495.85102.37+0.58NKE ahead
2025-08-0195.59101.14+0.63NKE ahead
2025-07-3195.68104.45+0.43near the usual relationship
2025-07-3098.23108.99+0.33near the usual relationship
2025-07-29100.35111.29+0.33near the usual relationship
2025-07-28101.51109.57+0.48near the usual relationship
2025-07-2597.71109.16+0.27near the usual relationship
2025-07-2496.62107.42+0.29near the usual relationship
2025-07-2398.32111.05+0.20near the usual relationship
2025-07-2296.58108.30+0.23near the usual relationship
2025-07-2194.82114.43-0.20near the usual relationship
2025-07-1892.84114.24-0.32near the usual relationship
2025-07-1793.49116.65-0.41near the usual relationship
2025-07-1692.36113.72-0.34near the usual relationship
2025-07-1592.22114.97-0.42near the usual relationship
2025-07-1492.56114.54-0.38near the usual relationship
2025-07-1193.04112.77-0.27near the usual relationship
2025-07-1095.59114.65-0.22near the usual relationship
2025-07-0994.24116.39-0.39near the usual relationship
2025-07-0894.70113.12-0.21near the usual relationship
2025-07-0798.04116.90-0.21near the usual relationship
2025-07-0397.86116.80-0.22near the usual relationship
2025-07-0297.86115.48-0.16near the usual relationship
2025-07-0194.04112.28-0.23near the usual relationship
2025-06-3091.01111.94-0.40near the usual relationship
2025-06-2792.29112.88-0.38near the usual relationship
2025-06-2680.12110.95-1.03ONON ahead
2025-06-2577.93110.71-1.16ONON ahead
2025-06-2478.68112.82-1.22ONON ahead
2025-06-2377.86114.13-1.34ONON ahead
2025-06-2076.59113.27-1.39ONON ahead
2025-06-1876.24111.55-1.34ONON ahead
2025-06-1776.86112.00-1.33ONON ahead
2025-06-1679.30114.00-1.27ONON ahead
2025-06-1377.54112.39-1.32ONON ahead
2025-06-1280.45119.85-1.46ONON ahead
2025-06-1180.85122.13-1.54ONON ahead
2025-06-1081.82122.43-1.50ONON ahead
2025-06-0979.31121.42-1.63ONON ahead
2025-06-0680.45121.63-1.57ONON ahead
2025-06-0580.28122.47-1.63ONON ahead
2025-06-0480.41124.80-1.72ONON ahead
2025-06-0379.90125.87-1.81ONON ahead
2025-06-0278.88127.18-1.94ONON ahead
2025-05-3077.62127.72-2.06ONON ahead
2025-05-2978.71126.54-1.97ONON ahead
2025-05-2879.14128.56-2.03ONON ahead
2025-05-2780.49130.49-2.04ONON ahead
2025-05-2376.89125.68-2.09ONON ahead
2025-05-2278.55126.49-2.03ONON ahead
2025-05-2176.84127.18-2.19ONON ahead
2025-05-2080.14128.32-2.04ONON ahead
2025-05-1979.53129.01-2.12ONON ahead
2025-05-1680.85128.82-2.04ONON ahead
2025-05-1579.94129.57-2.13ONON ahead
2025-05-1479.08123.85-1.96ONON ahead
2025-05-1379.93123.40-1.89ONON ahead
2025-05-1280.17110.34-1.35ONON ahead
2025-05-0974.69106.28-1.51ONON ahead
2025-05-0875.47106.92-1.50ONON ahead
2025-05-0775.10104.37-1.41ONON ahead
2025-05-0673.07103.66-1.51ONON ahead
2025-05-0573.47105.14-1.56ONON ahead
2025-05-0275.06105.18-1.46ONON ahead
2025-05-0172.71102.62-1.50ONON ahead
2025-04-3072.25103.46-1.57ONON ahead
2025-04-2973.71103.01-1.47ONON ahead
2025-04-2873.42100.19-1.37ONON ahead
2025-04-2573.8296.84-1.20ONON ahead
2025-04-2474.9296.26-1.12ONON ahead
2025-04-2373.5294.47-1.12ONON ahead
2025-04-2273.1091.68-1.02ONON ahead
2025-04-2171.8988.84-0.97ONON ahead
2025-04-1771.4391.40-1.12ONON ahead
2025-04-1668.6089.78-1.22ONON ahead
2025-04-1570.2491.76-1.21ONON ahead
2025-04-1470.9892.84-1.23ONON ahead
2025-04-1169.6893.57-1.34ONON ahead
2025-04-1069.6992.52-1.30ONON ahead
2025-04-0975.9996.80-1.14ONON ahead
2025-04-0868.2483.68-1.00ONON ahead
2025-04-0771.2488.11-1.04ONON ahead
2025-04-0473.3485.18-0.79ONON ahead
2025-04-0371.2080.97-0.71ONON ahead
2025-04-0283.2296.60-0.80ONON ahead
2025-04-0182.9691.83-0.62ONON ahead
2025-03-3181.3294.45-0.82ONON ahead
2025-03-2881.0894.95-0.86ONON ahead
2025-03-2784.2998.92-0.87ONON ahead
2025-03-2684.2299.03-0.88ONON ahead
2025-03-2585.24103.16-1.00ONON ahead
2025-03-2486.33103.91-0.99ONON ahead
2025-03-2187.0499.46-0.80ONON ahead
2025-03-2092.0697.98-0.53ONON ahead
2025-03-1993.50101.23-0.60ONON ahead
2025-03-1893.9199.53-0.53ONON ahead
2025-03-1794.41103.35-0.65ONON ahead
2025-03-1491.8099.87-0.64ONON ahead
2025-03-1393.0699.72-0.59ONON ahead
2025-03-1294.26100.49-0.57ONON ahead
2025-03-1195.0297.14-0.43near the usual relationship
2025-03-1097.8795.12-0.25near the usual relationship
2025-03-07100.68100.34-0.35near the usual relationship
2025-03-0699.55106.52-0.61ONON ahead
2025-03-0599.68112.86-0.82ONON ahead
2025-03-0499.05108.88-0.72ONON ahead
2025-03-03100.45102.90-0.47near the usual relationship
2025-02-28101.76104.26-0.48near the usual relationship
2025-02-27102.51100.41-0.33near the usual relationship
2025-02-26103.98107.29-0.52ONON ahead
2025-02-25104.69104.09-0.40near the usual relationship
2025-02-24102.84104.84-0.49near the usual relationship
2025-02-2198.00104.17-0.64ONON ahead
2025-02-2098.94110.13-0.80ONON ahead
2025-02-1998.36111.98-0.88ONON ahead
2025-02-1899.40114.75-0.93ONON ahead
2025-02-1493.57111.89-1.06ONON ahead
2025-02-1393.79112.62-1.08ONON ahead
2025-02-1292.57116.22-1.23ONON ahead
2025-02-1191.39116.06-1.27ONON ahead
2025-02-1090.88119.81-1.40ONON ahead
2025-02-0787.98121.31-1.56ONON ahead
2025-02-0691.90128.43-1.61ONON ahead
2025-02-0595.53126.97-1.46ONON ahead
2025-02-0498.28125.46-1.33ONON ahead
2025-02-0398.12125.85-1.36ONON ahead
2025-01-3198.51128.77-1.42ONON ahead
2025-01-30100.35136.82-1.57ONON ahead
2025-01-2998.10135.57-1.62ONON ahead
2025-01-2895.30133.68-1.68ONON ahead
2025-01-2796.82128.82-1.52ONON ahead
2025-01-2494.25129.35-1.63ONON ahead
2025-01-2395.17130.00-1.63ONON ahead
2025-01-2294.85125.94-1.55ONON ahead
2025-01-2193.74128.92-1.67ONON ahead
2025-01-1790.75124.69-1.68ONON ahead
2025-01-1691.10121.14-1.59ONON ahead
2025-01-1591.05117.68-1.51ONON ahead
2025-01-1491.17117.20-1.51ONON ahead
2025-01-1392.34119.10-1.53ONON ahead
2025-01-1091.21121.78-1.65ONON ahead
2025-01-0891.33119.44-1.60ONON ahead
2025-01-0792.35118.88-1.56ONON ahead
2025-01-0692.24117.46-1.53ONON ahead
2025-01-0393.91121.76-1.60ONON ahead
2025-01-0294.38119.08-1.53ONON ahead
2024-12-3196.94117.78-1.42ONON ahead
2024-12-3095.63118.69-1.49ONON ahead
2024-12-2797.90119.63-1.46ONON ahead
2024-12-2698.57121.27-1.49ONON ahead
2024-12-2498.37121.40-1.51ONON ahead
2024-12-2398.33121.83-1.53ONON ahead
2024-12-2098.57122.88-1.56ONON ahead
2024-12-1998.77118.58-1.46ONON ahead
2024-12-1898.51117.76-1.45ONON ahead
2024-12-1799.92121.81-1.52ONON ahead
2024-12-1698.90124.47-1.63ONON ahead
2024-12-1398.96123.23-1.61ONON ahead
2024-12-1299.87123.87-1.61ONON ahead
2024-12-11101.01125.16-1.62ONON ahead
2024-12-1098.31118.67-1.55ONON ahead
2024-12-0999.46118.32-1.52ONON ahead
2024-12-06101.06123.96-1.62ONON ahead
2024-12-05100.67127.68-1.74ONON ahead
2024-12-04100.40126.88-1.74ONON ahead
2024-12-03101.02128.04-1.77ONON ahead
2024-12-02101.32125.87-1.73ONON ahead
2024-11-29100.91125.44-1.74ONON ahead
2024-11-27100.36124.52-1.75ONON ahead
2024-11-2699.42124.69-1.80ONON ahead
2024-11-25101.54125.74-1.78ONON ahead
2024-11-2299.15125.01-1.86ONON ahead
2024-11-2196.21120.84-1.86ONON ahead
2024-11-2093.98115.57-1.82ONON ahead
2024-11-1994.68114.84-1.79ONON ahead
2024-11-1895.94110.73-1.65ONON ahead
2024-11-1598.21111.66-1.62ONON ahead
2024-11-1496.95114.73-1.76ONON ahead
2024-11-1398.03113.35-1.70ONON ahead
2024-11-1298.21113.16-1.71ONON ahead
2024-11-1198.13113.35-1.73ONON ahead
2024-11-0897.21110.73-1.70ONON ahead
2024-11-0797.26108.34-1.65ONON ahead
2024-11-0696.49102.30-1.50ONON ahead
2024-11-0599.90102.97-1.43ONON ahead
2024-11-0498.8999.57-1.37ONON ahead
2024-11-01100.00100.00-1.36ONON ahead

One-day company-specific moves (4+ standard deviations, which block ideas for 10 sessions): Jun 27, 2025 (NKE +15.2%, ONON +1.7%); Nov 12, 2025 (NKE +1.7%, ONON +18.0%); Apr 1, 2026 (NKE -15.5%, ONON +2.2%); Aug 11, 2026 (NKE -1.9%, ONON -20.3%). Upcoming earnings: ONON Nov 10, 2026 (pre-market); ONON Nov 11, 2026 (not-supplied).

Paired trades

The shared paper book and the replay, kept apart

Forward paper record

No paper position on this pair yet.

Historical simulation (a diagnostic, same rules)

1 simulated trade to Nov 3, 2026: +20.77% per trade on average after costs, 1 won.

LegsEnteredExitedWhyDaysBefore costsCosts + borrowAfter costs
Long ONON · Short NKEDec 14, 2022Mar 2, 2023converged78$2,164.25-$70.03$2,077.52 (+20.77%)

Per $10,000 a leg. A replay on today's companies cannot prove an edge.

The companies

NKE and ONON at a glance

NKE Nike Inc.

Listing
NYSE · SEC CIK 320187
Industry
Shoe Manufacturing · SIC 3021 Rubber & Plastics Footwear
Market value
$57.2B
Price history
2,531 daily closes, Oct 12, 2016 to Nov 5, 2026

ONON On Holding AG

Listing
NYSE · SEC CIK 1858985
Industry
Shoe Manufacturing · SIC 3021 Rubber & Plastics Footwear
Market value
$22.0B
Price history
1,292 daily closes, Sep 15, 2021 to Nov 5, 2026

Daily prices: Nasdaq.com. Filings and industry codes: SEC EDGAR. Earnings dates: Nasdaq earnings calendar.

Related
All pairs →
PairStatusAhead nowIndustry
ONON / DECKWatchlistONON by 0.78 sdShoe Manufacturing
NKE / DECKWatchlistDECK by 0.48 sdShoe Manufacturing

Follow the research behind the paper book

Boostio is a research-first platform in private beta: crypto candidates, daily market stories, public paper trading and now rival stocks. Exploring these pages stays free and open.

Explore the private beta

Paper only: hypothetical paired positions with modelled costs. No broker, no orders, no real money. A historical simulation is a diagnostic, not proof of an edge. Not investment advice.