Semiconductors

Broadcom Inc. vs Taiwan Semiconductor Manufacturing Company Ltd.

WatchlistAVGO / TSMPrices through Nov 6, 2026

Why these are rivals: #2 and #3 by market value ($2099B vs $1585B) in Nasdaq's "Semiconductors" industry; SEC SIC 3674 / 3674 (same major group); #2 and #3 by market value ($2099B vs $1585B) with SEC SIC 3674 (Semiconductors & Related Devices).

Rivals, but right now the price gap does not have a measured habit of closing, so there is no paper idea, whatever the gap.

  • Mean reversion: ADF t-statistic of the spread: -1.66 (needs <= -2.873 (5% critical value))
Business leadership

Business size

Annual revenue reported to the SEC. Scale, not market share.

YearAVGOTSMLarger
2025$63.9B--
2024$51.6B--
2023$35.8B--
2022$33.2B--
2021$27.4B--
2020$23.9B--

Market value: AVGO $1.59T, TSM $2.10T.

Stock leadership

TSM is ahead now

Measured against the pair's own last 252 trading days.

TSM leads AVGO by 1.47 standard deviations: +23.5% over its usual price ratio. 1 lead switch in the last year.

Price change3 mo6 mo12 mo
AVGO-30.5%-31.7%-18.2%
TSM-10.3%-8.8%+27.9%
Relationship

Not a measured twin today

Only these tests can make a pair tradable on paper.

Pass
Aligned sessions: 2532 (needs >= 254)
Pass
Co-movement: daily return correlation, 252 sessions: 0.64 (needs >= 0.60)
Fail
Mean reversion: ADF t-statistic of the spread: -1.66 (needs <= -2.873 (5% critical value))
Pass
Speed: half-life of the spread, sessions: 40.20 (needs <= 63)
Data
Both stocks current
The twins over two years

Prices side by side, and the gap between them

AVGO Broadcom Inc. TSM Taiwan Semiconductor Manufacturing Company Ltd.Price index, 100 = 2024-11-04. Tint = which stock is ahead of the pair's usual 1-year relationship (z beyond +/-0.5).
100200Nov 2024Nov 2025Nov 2026AVGO 174TSM 196
Spread z-score: AVGO relative to TSM, against the 252 sessions before each day. Above 0: AVGO ahead; below 0: TSM ahead. Lines at +/-2 (idea) and +/-4 (stop).
-4stop-2idea0+2idea+4stopNov 2024Nov 2025Nov 2026
Data table (504 sessions)
DateAVGO indexTSM indexzAhead
2026-11-06174.25195.99-1.47TSM ahead
2026-11-05172.96184.33-1.10TSM ahead
2026-11-04193.11206.59-1.14TSM ahead
2026-11-03197.05211.32-1.16TSM ahead
2026-11-02191.18208.10-1.27TSM ahead
2026-10-30193.46212.01-1.33TSM ahead
2026-10-29204.69225.42-1.37TSM ahead
2026-10-28208.73229.44-1.37TSM ahead
2026-10-27203.10228.06-1.53TSM ahead
2026-10-26195.30221.53-1.61TSM ahead
2026-10-23190.85218.47-1.69TSM ahead
2026-10-22191.78215.26-1.57TSM ahead
2026-10-21200.42225.46-1.60TSM ahead
2026-10-20198.38221.90-1.57TSM ahead
2026-10-19198.51219.37-1.50TSM ahead
2026-10-16195.05215.39-1.51TSM ahead
2026-10-15204.29220.43-1.36TSM ahead
2026-10-14205.43224.47-1.46TSM ahead
2026-10-13211.99232.37-1.49TSM ahead
2026-10-12210.46231.96-1.55TSM ahead
2026-10-09214.50236.64-1.57TSM ahead
2026-10-08213.67239.08-1.69TSM ahead
2026-10-07223.38246.50-1.60TSM ahead
2026-10-06222.97251.77-1.78TSM ahead
2026-10-05215.08253.60-2.12TSM ahead
2026-10-02210.70246.81-2.10TSM ahead
2026-10-01203.88239.72-2.15TSM ahead
2026-09-30208.36238.14-1.97TSM ahead
2026-09-29210.68238.54-1.92TSM ahead
2026-09-28207.40236.42-1.99TSM ahead
2026-09-25209.32235.23-1.90TSM ahead
2026-09-24207.87235.51-1.99TSM ahead
2026-09-23210.61233.12-1.83TSM ahead
2026-09-22216.28235.96-1.74TSM ahead
2026-09-21215.16232.38-1.67TSM ahead
2026-09-18212.17226.91-1.61TSM ahead
2026-09-17206.05224.61-1.76TSM ahead
2026-09-16201.43218.06-1.72TSM ahead
2026-09-15201.29215.99-1.66TSM ahead
2026-09-14204.52218.21-1.63TSM ahead
2026-09-11214.77226.16-1.54TSM ahead
2026-09-10214.08223.44-1.49TSM ahead
2026-09-09216.19227.27-1.55TSM ahead
2026-09-08218.67229.17-1.53TSM ahead
2026-09-04212.34223.90-1.59TSM ahead
2026-09-03211.90217.69-1.41TSM ahead
2026-09-02217.88216.90-1.20TSM ahead
2026-09-01219.33216.12-1.13TSM ahead
2026-08-31219.72216.81-1.15TSM ahead
2026-08-28218.80217.96-1.23TSM ahead
2026-08-27220.43223.06-1.35TSM ahead
2026-08-26210.97218.05-1.51TSM ahead
2026-08-25211.65217.90-1.50TSM ahead
2026-08-24212.85214.09-1.34TSM ahead
2026-08-21218.60218.70-1.31TSM ahead
2026-08-20215.98217.16-1.36TSM ahead
2026-08-19215.06215.12-1.33TSM ahead
2026-08-18225.45215.81-1.03TSM ahead
2026-08-17232.83224.98-1.10TSM ahead
2026-08-14233.16222.57-1.02TSM ahead
2026-08-13247.89224.73-0.66TSM ahead
2026-08-12246.84224.03-0.68TSM ahead
2026-08-11246.86220.33-0.57TSM ahead
2026-08-10250.61218.45-0.40near the usual relationship
2026-08-07253.79219.27-0.35near the usual relationship
2026-08-06249.52218.31-0.44near the usual relationship
2026-08-05248.16216.12-0.41near the usual relationship
2026-08-04248.09217.78-0.47near the usual relationship
2026-08-03232.71212.00-0.74TSM ahead
2026-07-31230.96211.03-0.77TSM ahead
2026-07-30230.10210.54-0.78TSM ahead
2026-07-29219.71195.59-0.60TSM ahead
2026-07-28225.99204.80-0.73TSM ahead
2026-07-27227.36208.34-0.81TSM ahead
2026-07-24226.59210.59-0.91TSM ahead
2026-07-23232.85216.95-0.94TSM ahead
2026-07-22235.43219.88-0.96TSM ahead
2026-07-21229.31221.66-1.21TSM ahead
2026-07-20224.36210.01-1.00TSM ahead
2026-07-17220.01207.96-1.07TSM ahead
2026-07-16222.16213.90-1.21TSM ahead
2026-07-15233.92218.98-1.02TSM ahead
2026-07-14230.86219.46-1.14TSM ahead
2026-07-13227.86220.08-1.26TSM ahead
2026-07-10237.30226.62-1.19TSM ahead
2026-07-09237.98228.11-1.23TSM ahead
2026-07-08230.61228.12-1.46TSM ahead
2026-07-07219.98225.81-1.75TSM ahead
2026-07-06221.83235.85-2.02TSM ahead
2026-07-02213.85226.64-2.03TSM ahead
2026-07-01219.13231.90-2.04TSM ahead
2026-06-30224.12249.31-2.44TSM ahead
2026-06-29220.97237.58-2.22TSM ahead
2026-06-26216.56225.70-2.02TSM ahead
2026-06-25224.81227.08-1.80TSM ahead
2026-06-24226.68230.13-1.86TSM ahead
2026-06-23225.54227.81-1.84TSM ahead
2026-06-22232.65244.14-2.16TSM ahead
2026-06-18244.05241.24-1.72TSM ahead
2026-06-17233.11225.60-1.57TSM ahead
2026-06-16223.50222.30-1.80TSM ahead
2026-06-15233.72230.42-1.75TSM ahead
2026-06-12226.68221.30-1.69TSM ahead
2026-06-11228.76219.81-1.58TSM ahead
2026-06-10220.77213.38-1.64TSM ahead
2026-06-09232.67223.39-1.61TSM ahead
2026-06-08235.30222.80-1.51TSM ahead
2026-06-05228.85216.73-1.52TSM ahead
2026-06-04248.54232.26-1.43TSM ahead
2026-06-03284.33227.97-0.19near the usual relationship
2026-06-02285.71233.19-0.34near the usual relationship
2026-06-01272.90227.41-0.51TSM ahead
2026-05-29265.07218.44-0.43near the usual relationship
2026-05-28253.09221.79-0.93TSM ahead
2026-05-27250.29220.68-0.98TSM ahead
2026-05-26250.38215.24-0.78TSM ahead
2026-05-22245.71211.17-0.79TSM ahead
2026-05-21245.96212.54-0.84TSM ahead
2026-05-20247.86209.66-0.67TSM ahead
2026-05-19243.89204.95-0.62TSM ahead
2026-05-18249.61206.70-0.51TSM ahead
2026-05-15252.26211.08-0.59TSM ahead
2026-05-14260.93218.06-0.59TSM ahead
2026-05-13247.28208.71-0.67TSM ahead
2026-05-12248.77207.39-0.58TSM ahead
2026-05-11254.19211.18-0.55TSM ahead
2026-05-08255.12214.91-0.67TSM ahead
2026-05-07244.77216.20-1.06TSM ahead
2026-05-06252.41218.99-0.92TSM ahead
2026-05-05253.55205.89-0.38near the usual relationship
2026-05-04247.11209.65-0.74TSM ahead
2026-05-01249.94207.60-0.57TSM ahead
2026-04-30247.66206.76-0.62TSM ahead
2026-04-29240.55205.59-0.82TSM ahead
2026-04-28237.22204.81-0.91TSM ahead
2026-04-27248.12211.41-0.80TSM ahead
2026-04-24250.82210.10-0.66TSM ahead
2026-04-23249.15199.76-0.30near the usual relationship
2026-04-22250.76202.26-0.35near the usual relationship
2026-04-21238.61192.15-0.34near the usual relationship
2026-04-20237.10191.19-0.36near the usual relationship
2026-04-17241.20193.41-0.31near the usual relationship
2026-04-16236.41189.68-0.32near the usual relationship
2026-04-15235.37195.81-0.62TSM ahead
2026-04-14225.92198.31-1.07TSM ahead
2026-04-13225.30192.93-0.87TSM ahead
2026-04-10220.44193.46-1.08TSM ahead
2026-04-09210.57190.80-1.35TSM ahead
2026-04-08208.03191.01-1.46TSM ahead
2026-04-07198.14180.27-1.39TSM ahead
2026-04-06186.55178.41-1.81TSM ahead
2026-04-02186.62176.99-1.75TSM ahead
2026-04-01185.99178.27-1.85TSM ahead
2026-03-31183.63176.42-1.89TSM ahead
2026-03-30174.08165.22-1.80TSM ahead
2026-03-27178.39170.57-1.87TSM ahead
2026-03-26183.57170.24-1.62TSM ahead
2026-03-25189.15181.54-1.93TSM ahead
2026-03-24188.84179.19-1.85TSM ahead
2026-03-23191.34176.68-1.62TSM ahead
2026-03-20184.22171.87-1.73TSM ahead
2026-03-19189.76176.86-1.74TSM ahead
2026-03-18187.44177.27-1.88TSM ahead
2026-03-17190.63180.61-1.92TSM ahead
2026-03-16192.77177.61-1.69TSM ahead
2026-03-13191.14176.61-1.73TSM ahead
2026-03-12199.33175.77-1.31TSM ahead
2026-03-11202.65185.09-1.64TSM ahead
2026-03-10203.25181.19-1.43TSM ahead
2026-03-09205.13182.03-1.39TSM ahead
2026-03-06196.07176.91-1.55TSM ahead
2026-03-05197.43184.73-1.90TSM ahead
2026-03-04188.39186.59-2.46TSM ahead
2026-03-03186.20184.34-2.49TSM ahead
2026-03-02189.15192.69-2.81TSM ahead
2026-02-27189.59195.54-2.99TSM ahead
2026-02-26190.86196.71-3.05TSM ahead
2026-02-25197.16202.41-3.07TSM ahead
2026-02-24193.11201.37-3.31TSM ahead
2026-02-23195.99193.17-2.77TSM ahead
2026-02-20197.36193.43-2.77TSM ahead
2026-02-19198.15188.13-2.46TSM ahead
2026-02-18197.87189.11-2.58TSM ahead
2026-02-17197.29190.12-2.72TSM ahead
2026-02-13192.92191.25-3.10TSM ahead
2026-02-12196.48192.16-3.01TSM ahead
2026-02-11203.36195.29-2.85TSM ahead
2026-02-10201.98188.93-2.58TSM ahead
2026-02-09204.06185.53-2.27TSM ahead
2026-02-06197.52182.11-2.48TSM ahead
2026-02-05184.22172.65-2.71TSM ahead
2026-02-04182.76170.05-2.67TSM ahead
2026-02-03190.05175.27-2.59TSM ahead
2026-02-02196.45178.20-2.40TSM ahead
2026-01-30196.56172.56-1.99TSM ahead
2026-01-29196.22177.26-2.37TSM ahead
2026-01-28197.71178.69-2.39TSM ahead
2026-01-27197.44176.62-2.29TSM ahead
2026-01-26192.73173.68-2.41TSM ahead
2026-01-23189.88174.81-2.73TSM ahead
2026-01-22193.11170.90-2.23TSM ahead
2026-01-21195.08170.24-2.07TSM ahead
2026-01-20197.33170.79-1.97TSM ahead
2026-01-16208.67178.74-1.84TSM ahead
2026-01-15203.51178.35-2.17TSM ahead
2026-01-14201.66170.76-1.72TSM ahead
2026-01-13210.39172.90-1.31TSM ahead
2026-01-12208.96173.19-1.43TSM ahead
2026-01-09204.67168.94-1.38TSM ahead
2026-01-08197.26166.01-1.65TSM ahead
2026-01-07203.80166.36-1.24TSM ahead
2026-01-06203.96170.93-1.61TSM ahead
2026-01-05203.75168.22-1.42TSM ahead
2026-01-02206.24166.85-1.14TSM ahead
2025-12-31205.34158.64-0.50TSM ahead
2025-12-30207.56156.39-0.16near the usual relationship
2025-12-29207.29157.09-0.24near the usual relationship
2025-12-26208.92158.09-0.21near the usual relationship
2025-12-24207.78155.98-0.10near the usual relationship
2025-12-23207.25155.02-0.05near the usual relationship
2025-12-22202.58153.10-0.19near the usual relationship
2025-12-19201.93150.84-0.03near the usual relationship
2025-12-18195.72148.61-0.26near the usual relationship
2025-12-17193.43144.58-0.04near the usual relationship
2025-12-16202.49149.75+0.12near the usual relationship
2025-12-15201.61150.21+0.03near the usual relationship
2025-12-12213.54152.45+0.60AVGO ahead
2025-12-11241.10159.14+1.61AVGO ahead
2025-12-10245.01161.90+1.58AVGO ahead
2025-12-09241.05158.39+1.63AVGO ahead
2025-12-08237.97157.59+1.52AVGO ahead
2025-12-05231.53153.85+1.46AVGO ahead
2025-12-04226.06152.92+1.25AVGO ahead
2025-12-03225.81154.23+1.14AVGO ahead
2025-12-02226.38152.48+1.29AVGO ahead
2025-12-01229.06150.18+1.59AVGO ahead
2025-11-28239.07152.18+1.91AVGO ahead
2025-11-26235.88151.37+1.82AVGO ahead
2025-11-25228.44148.61+1.67AVGO ahead
2025-11-24224.24148.59+1.47AVGO ahead
2025-11-21201.84143.59+0.74AVGO ahead
2025-11-20205.77144.86+0.85AVGO ahead
2025-11-19210.28147.41+0.90AVGO ahead
2025-11-18202.02145.08+0.67AVGO ahead
2025-11-17203.29147.22+0.59AVGO ahead
2025-11-14203.18148.68+0.49near the usual relationship
2025-11-13201.71147.32+0.52AVGO ahead
2025-11-12210.75151.71+0.66AVGO ahead
2025-11-11208.82152.00+0.56AVGO ahead
2025-11-10212.63154.14+0.61AVGO ahead
2025-11-07207.32149.56+0.66AVGO ahead
2025-11-06210.97150.99+0.74AVGO ahead
2025-11-05212.98153.29+0.69AVGO ahead
2025-11-04208.80153.50+0.50AVGO ahead
2025-11-03215.10159.15+0.45near the usual relationship
2025-10-31219.30156.83+0.76AVGO ahead
2025-10-30223.36158.29+0.85AVGO ahead
2025-10-29229.00159.27+1.02AVGO ahead
2025-10-28221.28157.41+0.83AVGO ahead
2025-10-27214.80155.70+0.67AVGO ahead
2025-10-24210.10153.98+0.58AVGO ahead
2025-10-23204.27151.77+0.47near the usual relationship
2025-10-22201.90150.80+0.43near the usual relationship
2025-10-21203.30153.74+0.33near the usual relationship
2025-10-20207.20155.41+0.41near the usual relationship
2025-10-17207.26154.04+0.49near the usual relationship
2025-10-16210.12156.53+0.48near the usual relationship
2025-10-15208.44159.07+0.28near the usual relationship
2025-10-14204.17154.49+0.36near the usual relationship
2025-10-13211.63158.12+0.47near the usual relationship
2025-10-10192.60146.51+0.32near the usual relationship
2025-10-09204.70156.55+0.29near the usual relationship
2025-10-08204.98158.97+0.18near the usual relationship
2025-10-07199.59153.49+0.25near the usual relationship
2025-10-06199.04157.86+0.00near the usual relationship
2025-10-03200.75152.53+0.36near the usual relationship
2025-10-02200.64150.40+0.47near the usual relationship
2025-10-01197.80150.59+0.35near the usual relationship
2025-09-30195.73145.80+0.53AVGO ahead
2025-09-29194.54142.63+0.67AVGO ahead
2025-09-26198.48142.70+0.83AVGO ahead
2025-09-25199.41144.42+0.78AVGO ahead
2025-09-24201.31146.54+0.74AVGO ahead
2025-09-23201.09147.58+0.68AVGO ahead
2025-09-22201.00142.32+0.98AVGO ahead
2025-09-19204.65138.27+1.36AVGO ahead
2025-09-18204.89140.24+1.27AVGO ahead
2025-09-17205.38137.18+1.48AVGO ahead
2025-09-16213.59136.80+1.84AVGO ahead
2025-09-15216.01136.45+1.97AVGO ahead
2025-09-12213.51135.38+1.96AVGO ahead
2025-09-11213.37135.16+1.98AVGO ahead
2025-09-10219.26135.96+2.18AVGO ahead
2025-09-09199.74130.99+1.74AVGO ahead
2025-09-08205.07129.04+2.10AVGO ahead
2025-09-05198.69127.07+1.99AVGO ahead
2025-09-04181.61122.79+1.55AVGO ahead
2025-09-03179.41120.79+1.60AVGO ahead
2025-09-02176.94119.23+1.60AVGO ahead
2025-08-29176.44120.52+1.50AVGO ahead
2025-08-28183.12124.38+1.56AVGO ahead
2025-08-27178.14124.92+1.31AVGO ahead
2025-08-26176.81124.62+1.28AVGO ahead
2025-08-25174.57122.98+1.29AVGO ahead
2025-08-22174.43121.63+1.39AVGO ahead
2025-08-21171.82118.67+1.48AVGO ahead
2025-08-20172.75119.34+1.50AVGO ahead
2025-08-19174.97121.48+1.47AVGO ahead
2025-08-18181.41126.02+1.47AVGO ahead
2025-08-15181.75124.70+1.59AVGO ahead
2025-08-14184.65125.81+1.67AVGO ahead
2025-08-13183.38126.04+1.61AVGO ahead
2025-08-12185.60127.53+1.62AVGO ahead
2025-08-11180.30126.38+1.46AVGO ahead
2025-08-08180.94126.24+1.51AVGO ahead
2025-08-07180.22126.65+1.47AVGO ahead
2025-08-06178.98120.78+1.83AVGO ahead
2025-08-05173.79121.36+1.55AVGO ahead
2025-08-04176.64124.77+1.47AVGO ahead
2025-08-01171.25122.79+1.35AVGO ahead
2025-07-31174.25126.13+1.28AVGO ahead
2025-07-30179.54126.81+1.51AVGO ahead
2025-07-29176.46125.98+1.42AVGO ahead
2025-07-28174.61126.72+1.29AVGO ahead
2025-07-25172.16128.21+1.07AVGO ahead
2025-07-24171.29126.12+1.18AVGO ahead
2025-07-23168.31125.46+1.08AVGO ahead
2025-07-22165.29122.47+1.14AVGO ahead
2025-07-21170.99124.69+1.30AVGO ahead
2025-07-18168.10125.50+1.10AVGO ahead
2025-07-17169.95128.21+1.01AVGO ahead
2025-07-16166.60124.01+1.14AVGO ahead
2025-07-15166.68123.69+1.18AVGO ahead
2025-07-14163.51119.37+1.33AVGO ahead
2025-07-11162.79120.28+1.24AVGO ahead
2025-07-10163.39119.94+1.30AVGO ahead
2025-07-09164.88121.03+1.32AVGO ahead
2025-07-08161.26118.95+1.28AVGO ahead
2025-07-07162.67119.63+1.32AVGO ahead
2025-07-03163.26122.57+1.15AVGO ahead
2025-07-02160.13121.95+1.03AVGO ahead
2025-07-01157.07117.29+1.21AVGO ahead
2025-06-30163.54118.23+1.52AVGO ahead
2025-06-27159.80119.32+1.24AVGO ahead
2025-06-26160.29116.94+1.46AVGO ahead
2025-06-25157.02116.28+1.33AVGO ahead
2025-06-24156.49114.89+1.42AVGO ahead
2025-06-23150.56109.79+1.50AVGO ahead
2025-06-20148.32109.37+1.41AVGO ahead
2025-06-18149.07111.45+1.29AVGO ahead
2025-06-17147.95111.66+1.22AVGO ahead
2025-06-16149.57112.59+1.25AVGO ahead
2025-06-13147.55110.20+1.33AVGO ahead
2025-06-12151.93112.46+1.42AVGO ahead
2025-06-11150.05111.77+1.38AVGO ahead
2025-06-10145.14110.91+1.15AVGO ahead
2025-06-09144.93108.06+1.39AVGO ahead
2025-06-06146.50107.11+1.58AVGO ahead
2025-06-05154.22106.15+2.15AVGO ahead
2025-06-04154.90105.66+2.27AVGO ahead
2025-06-03152.39103.16+2.37AVGO ahead
2025-06-02147.56101.71+2.23AVGO ahead
2025-05-30143.62100.92+2.08AVGO ahead
2025-05-29143.56102.92+1.91AVGO ahead
2025-05-28142.05102.39+1.88AVGO ahead
2025-05-27139.81103.19+1.67AVGO ahead
2025-05-23135.70100.22+1.68AVGO ahead
2025-05-22136.77102.42+1.56AVGO ahead
2025-05-21136.30100.10+1.76AVGO ahead
2025-05-20137.45100.99+1.78AVGO ahead
2025-05-19136.83101.01+1.75AVGO ahead
2025-05-16135.63101.39+1.65AVGO ahead
2025-05-15138.02101.39+1.84AVGO ahead
2025-05-14137.72101.67+1.81AVGO ahead
2025-05-13137.89101.27+1.88AVGO ahead
2025-05-12131.4697.61+1.79AVGO ahead
2025-05-09123.5292.15+1.76AVGO ahead
2025-05-08123.2791.47+1.84AVGO ahead
2025-05-07121.5191.12+1.75AVGO ahead
2025-05-06118.7189.94+1.66AVGO ahead
2025-05-05119.0992.09+1.47AVGO ahead
2025-05-02120.8293.59+1.46AVGO ahead
2025-05-01117.0890.16+1.53AVGO ahead
2025-04-30114.1987.02+1.66AVGO ahead
2025-04-29113.4285.86+1.75AVGO ahead
2025-04-28114.1985.30+1.91AVGO ahead
2025-04-25114.1086.19+1.81AVGO ahead
2025-04-24111.6385.71+1.65AVGO ahead
2025-04-23104.9682.38+1.43AVGO ahead
2025-04-22100.6179.04+1.44AVGO ahead
2025-04-2198.6177.19+1.49AVGO ahead
2025-04-17101.4579.21+1.53AVGO ahead
2025-04-16103.6079.18+1.78AVGO ahead
2025-04-15106.1782.13+1.66AVGO ahead
2025-04-14105.8281.35+1.75AVGO ahead
2025-04-11107.9482.00+1.90AVGO ahead
2025-04-10102.2278.89+1.75AVGO ahead
2025-04-09109.8582.87+2.02AVGO ahead
2025-04-0892.5773.80+1.42AVGO ahead
2025-04-0791.4576.31+0.92AVGO ahead
2025-04-0486.7976.63+0.28near the usual relationship
2025-04-0391.3782.16+0.08near the usual relationship
2025-04-02102.1088.95+0.44near the usual relationship
2025-04-0199.9888.04+0.32near the usual relationship
2025-03-3199.3486.66+0.42near the usual relationship
2025-03-28100.3486.27+0.59AVGO ahead
2025-03-27102.0487.83+0.58AVGO ahead
2025-03-26106.3690.57+0.71AVGO ahead
2025-03-25111.6994.44+0.79AVGO ahead
2025-03-24113.4794.57+0.96AVGO ahead
2025-03-21113.7192.26+1.27AVGO ahead
2025-03-20113.0592.64+1.17AVGO ahead
2025-03-19116.0390.71+1.72AVGO ahead
2025-03-18111.9490.38+1.37AVGO ahead
2025-03-17115.4092.00+1.52AVGO ahead
2025-03-14116.0190.88+1.74AVGO ahead
2025-03-13113.5389.58+1.68AVGO ahead
2025-03-12115.2492.49+1.50AVGO ahead
2025-03-11112.7889.25+1.68AVGO ahead
2025-03-10109.4389.08+1.36AVGO ahead
2025-03-07115.6792.45+1.58AVGO ahead
2025-03-06106.4791.80+0.69AVGO ahead
2025-03-05113.6696.20+0.91AVGO ahead
2025-03-04111.2393.97+0.93AVGO ahead
2025-03-03111.1790.30+1.40AVGO ahead
2025-02-28118.3294.24+1.65AVGO ahead
2025-02-27117.3594.53+1.52AVGO ahead
2025-02-26126.34101.60+1.55AVGO ahead
2025-02-25120.1798.86+1.29AVGO ahead
2025-02-24123.36100.05+1.47AVGO ahead
2025-02-21129.73103.49+1.69AVGO ahead
2025-02-20134.52104.46+2.03AVGO ahead
2025-02-19135.70104.90+2.11AVGO ahead
2025-02-18135.59105.84+2.02AVGO ahead
2025-02-14138.26106.44+2.22AVGO ahead
2025-02-13139.90105.36+2.53AVGO ahead
2025-02-12140.23107.74+2.31AVGO ahead
2025-02-11139.45108.97+2.12AVGO ahead
2025-02-10139.45108.56+2.20AVGO ahead
2025-02-07133.41107.60+1.75AVGO ahead
2025-02-06137.26109.89+1.85AVGO ahead
2025-02-05137.64108.88+2.02AVGO ahead
2025-02-04131.97106.52+1.76AVGO ahead
2025-02-03129.18104.30+1.77AVGO ahead
2025-01-31131.28109.27+1.36AVGO ahead
2025-01-30127.95108.66+1.10AVGO ahead
2025-01-29122.43105.62+0.89AVGO ahead
2025-01-28123.03105.66+0.94AVGO ahead
2025-01-27119.92100.39+1.28AVGO ahead
2025-01-24145.18115.83+1.92AVGO ahead
2025-01-23142.56117.26+1.52AVGO ahead
2025-01-22142.93116.52+1.64AVGO ahead
2025-01-21142.57114.17+1.89AVGO ahead
2025-01-17140.87110.41+2.19AVGO ahead
2025-01-16136.11112.13+1.52AVGO ahead
2025-01-15135.27107.96+1.94AVGO ahead
2025-01-14133.31105.16+2.11AVGO ahead
2025-01-13133.66105.12+2.16AVGO ahead
2025-01-10133.08108.78+1.64AVGO ahead
2025-01-08136.05108.12+2.03AVGO ahead
2025-01-07135.65110.37+1.72AVGO ahead
2025-01-06140.26114.85+1.63AVGO ahead
2025-01-03137.97108.90+2.15AVGO ahead
2025-01-02137.63105.23+2.61AVGO ahead
2024-12-31137.55103.10+2.92AVGO ahead
2024-12-30139.77104.61+2.98AVGO ahead
2024-12-27143.43105.26+3.32AVGO ahead
2024-12-26145.57106.00+3.49AVGO ahead
2024-12-24142.20107.71+2.95AVGO ahead
2024-12-23137.85108.25+2.43AVGO ahead
2024-12-20130.99102.95+2.42AVGO ahead
2024-12-19129.53101.61+2.45AVGO ahead
2024-12-18132.67102.09+2.75AVGO ahead
2024-12-17142.53104.75+3.49AVGO ahead
2024-12-16148.32105.56+4.09AVGO ahead
2024-12-13133.37104.92+2.55AVGO ahead
2024-12-12107.1899.95-0.10near the usual relationship
2024-12-11108.69101.59-0.14near the usual relationship
2024-12-10101.93100.20-0.93TSM ahead
2024-12-09106.16103.97-0.88TSM ahead
2024-12-06106.51105.98-1.13TSM ahead
2024-12-05101.14106.65-2.05TSM ahead
2024-12-04101.19104.77-1.78TSM ahead
2024-12-0399.76103.83-1.89TSM ahead
2024-12-0298.79101.48-1.70TSM ahead
2024-11-2996.1696.40-1.32TSM ahead
2024-11-2794.7394.59-1.26TSM ahead
2024-11-2697.7495.97-1.00TSM ahead
2024-11-2597.7996.62-1.11TSM ahead
2024-11-2297.4499.23-1.61TSM ahead
2024-11-2197.2699.83-1.76TSM ahead
2024-11-2096.8698.33-1.60TSM ahead
2024-11-1998.1099.01-1.51TSM ahead
2024-11-1898.2997.87-1.30TSM ahead
2024-11-1597.8097.10-1.26TSM ahead
2024-11-14101.0998.40-0.95TSM ahead
2024-11-13102.9897.44-0.48near the usual relationship
2024-11-12104.55100.11-0.68TSM ahead
2024-11-11106.15101.30-0.63TSM ahead
2024-11-08108.95105.03-0.80TSM ahead
2024-11-07109.05105.03-0.79TSM ahead
2024-11-06106.53100.87-0.51TSM ahead
2024-11-05103.17102.19-1.27TSM ahead
2024-11-04100.00100.00-1.44TSM ahead

One-day company-specific moves (4+ standard deviations, which block ideas for 10 sessions): Dec 13, 2024 (AVGO +24.4%, TSM +5.0%); Dec 16, 2024 (AVGO +11.2%, TSM +0.6%); Jun 4, 2026 (AVGO -12.6%, TSM +1.9%).

Paired trades

The shared paper book and the replay, kept apart

Forward paper record

No paper position on this pair yet.

Historical simulation (a diagnostic, same rules)

1 simulated trade to Nov 3, 2026: -17.19% per trade on average after costs, 0 won.

LegsEnteredExitedWhyDaysBefore costsCosts + borrowAfter costs
Long TSM · Short AVGOJan 10, 2025Jun 4, 2025divergence stop145-$1,621.24-$43.98-$1,718.74 (-17.19%)

Per $10,000 a leg. A replay on today's companies cannot prove an edge.

The companies

AVGO and TSM at a glance

AVGO Broadcom Inc.

Listing
Nasdaq · SEC CIK 1730168
Industry
Semiconductors · SIC 3674 Semiconductors & Related Devices
Market value
$1.59T
Price history
2,532 daily closes, Oct 12, 2016 to Nov 6, 2026

TSM Taiwan Semiconductor Manufacturing Company Ltd.

Listing
NYSE · SEC CIK 1046179
Industry
Semiconductors · SIC 3674 Semiconductors & Related Devices
Market value
$2.10T
Price history
2,532 daily closes, Oct 12, 2016 to Nov 6, 2026

Daily prices: Nasdaq.com. Filings and industry codes: SEC EDGAR. Earnings dates: Nasdaq earnings calendar.

Related
All pairs →
PairStatusAhead nowIndustry
NVDA / AVGOWatchlistNVDA by 1.61 sdSemiconductors
NVDA / TSMWatchlistTSM by 0.71 sdSemiconductors

Follow the research behind the paper book

Boostio is a research-first platform in private beta: crypto candidates, daily market stories, public paper trading and now rival stocks. Exploring these pages stays free and open.

Explore the private beta

Paper only: hypothetical paired positions with modelled costs. No broker, no orders, no real money. A historical simulation is a diagnostic, not proof of an edge. Not investment advice.