SIC 3823 Industrial Instruments For Measurement, Display, and Control

AMETEK Inc. vs Roper Technologies Inc.

Data problemAME / ROPPrices through Nov 25, 2026

Why these are rivals: #2 and #3 by market value ($52B vs $47B) with SEC SIC 3823 (Industrial Instruments For Measurement, Display, and Control).

Prices for one of the stocks are not current, so nothing is decided on this pair until they are.

  • AME: latest final session stored: 2026-11-25 (needs 2026-11-27)
  • ROP: latest final session stored: 2026-11-25 (needs 2026-11-27)
Business leadership

ROP is the larger business

Annual revenue reported to the SEC. Scale, not market share.

YearAMEROPLarger
2025$7.4B$7.9BROP
2024$6.9B$7.0BROP
2023$6.6B$6.2BAME
2022$6.2B$5.4BAME
2021$5.5B$4.8BAME
2020$4.5B$4.0BAME

Revenue lead switched: 2024 to ROP. Market value: AME $52.2B, ROP $47.2B.

Stock leadership

ROP is ahead now

Measured against the pair's own last 252 trading days.

ROP leads AME by 1.70 standard deviations: +28.1% over its usual price ratio. 1 lead switch in the last year.

Price change3 mo6 mo12 mo
AME-6.6%+0.9%+16.5%
ROP+14.3%+51.1%+9.9%
Relationship

Not a measured twin today

Only these tests can make a pair tradable on paper.

Pass
Aligned sessions: 2514 (needs >= 254)
Data
One stock is not current
The twins over two years

Prices side by side, and the gap between them

AME AMETEK Inc. ROP Roper Technologies Inc.Price index, 100 = 2024-11-21. Tint = which stock is ahead of the pair's usual 1-year relationship (z beyond +/-0.5).
100Nov 2024Nov 2025Nov 2026AME 116ROP 87
Spread z-score: AME relative to ROP, against the 252 sessions before each day. Above 0: AME ahead; below 0: ROP ahead. Lines at +/-2 (idea) and +/-4 (stop).
-4stop-2idea0+2idea+4stopNov 2024Nov 2025Nov 2026
Data table (504 sessions)
DateAME indexROP indexzAhead
2026-11-25116.2187.16-1.70ROP ahead
2026-11-24116.2085.97-1.60ROP ahead
2026-11-23118.0982.66-1.20ROP ahead
2026-11-20113.8682.96-1.46ROP ahead
2026-11-19118.0883.53-1.25ROP ahead
2026-11-18120.3684.95-1.22ROP ahead
2026-11-17119.9685.14-1.25ROP ahead
2026-11-16120.4387.27-1.38ROP ahead
2026-11-13123.6886.60-1.14ROP ahead
2026-11-12123.1386.22-1.13ROP ahead
2026-11-11122.4486.19-1.15ROP ahead
2026-11-10121.7485.60-1.14ROP ahead
2026-11-09121.7085.09-1.09ROP ahead
2026-11-06116.8185.99-1.42ROP ahead
2026-11-05113.9188.58-1.76ROP ahead
2026-11-04121.1188.81-1.38ROP ahead
2026-11-03126.9885.44-0.83ROP ahead
2026-11-02123.5786.52-1.07ROP ahead
2026-10-30123.1784.18-0.91ROP ahead
2026-10-29128.6281.13-0.40near the usual relationship
2026-10-28126.7579.50-0.35near the usual relationship
2026-10-27125.7878.39-0.30near the usual relationship
2026-10-26124.0379.68-0.47near the usual relationship
2026-10-23122.6179.05-0.47near the usual relationship
2026-10-22122.0078.70-0.46near the usual relationship
2026-10-21127.8571.73+0.35near the usual relationship
2026-10-20126.3671.85+0.28near the usual relationship
2026-10-19126.2969.19+0.50AME ahead
2026-10-16126.7769.05+0.54AME ahead
2026-10-15126.9569.00+0.55AME ahead
2026-10-14126.0967.24+0.66AME ahead
2026-10-13127.9566.47+0.80AME ahead
2026-10-12127.6566.27+0.81AME ahead
2026-10-09126.9865.69+0.83AME ahead
2026-10-08126.4465.71+0.81AME ahead
2026-10-07127.0064.69+0.92AME ahead
2026-10-06129.6165.36+0.97AME ahead
2026-10-05128.6965.56+0.93AME ahead
2026-10-02128.6963.93+1.06AME ahead
2026-10-01127.2465.42+0.89AME ahead
2026-09-30126.5563.04+1.05AME ahead
2026-09-29128.1163.05+1.12AME ahead
2026-09-28128.5663.87+1.08AME ahead
2026-09-25128.0964.69+1.01AME ahead
2026-09-24126.5565.68+0.88AME ahead
2026-09-23125.8966.10+0.83AME ahead
2026-09-22125.3665.65+0.85AME ahead
2026-09-21123.2365.93+0.76AME ahead
2026-09-18121.3967.25+0.60AME ahead
2026-09-17119.7067.61+0.52AME ahead
2026-09-16118.6167.81+0.47near the usual relationship
2026-09-15119.7669.27+0.42near the usual relationship
2026-09-14119.3671.20+0.29near the usual relationship
2026-09-11123.5570.10+0.52AME ahead
2026-09-10119.6670.11+0.38near the usual relationship
2026-09-09120.6970.43+0.41near the usual relationship
2026-09-08121.4571.38+0.38near the usual relationship
2026-09-04121.4373.48+0.26near the usual relationship
2026-09-03119.6476.20+0.05near the usual relationship
2026-09-02119.1275.02+0.10near the usual relationship
2026-09-01118.1775.47+0.05near the usual relationship
2026-08-31120.1376.61+0.06near the usual relationship
2026-08-28120.6876.90+0.08near the usual relationship
2026-08-27124.4776.26+0.25near the usual relationship
2026-08-26125.2674.56+0.37near the usual relationship
2026-08-25123.5074.58+0.32near the usual relationship
2026-08-24123.7974.97+0.31near the usual relationship
2026-08-21122.3774.30+0.31near the usual relationship
2026-08-20122.1374.05+0.32near the usual relationship
2026-08-19124.2473.49+0.43near the usual relationship
2026-08-18127.7071.12+0.68AME ahead
2026-08-17129.8470.31+0.79AME ahead
2026-08-14130.1572.05+0.71AME ahead
2026-08-13130.8871.72+0.76AME ahead
2026-08-12132.0671.31+0.82AME ahead
2026-08-11130.9372.08+0.75AME ahead
2026-08-10129.1872.87+0.67AME ahead
2026-08-07129.5872.57+0.70AME ahead
2026-08-06128.4171.64+0.72AME ahead
2026-08-05130.1471.18+0.80AME ahead
2026-08-04129.7870.86+0.82AME ahead
2026-08-03124.5270.83+0.67AME ahead
2026-07-31123.4770.72+0.65AME ahead
2026-07-30122.6070.23+0.65AME ahead
2026-07-29120.1773.62+0.41near the usual relationship
2026-07-28123.3370.53+0.67AME ahead
2026-07-27124.1967.66+0.86AME ahead
2026-07-24123.6166.28+0.92AME ahead
2026-07-23123.1864.07+1.04AME ahead
2026-07-22121.1160.75+1.18AME ahead
2026-07-21121.4563.27+1.05AME ahead
2026-07-20120.1565.46+0.89AME ahead
2026-07-17121.0765.52+0.92AME ahead
2026-07-16121.2265.71+0.93AME ahead
2026-07-15119.2962.88+1.03AME ahead
2026-07-14119.5162.54+1.07AME ahead
2026-07-13118.5665.06+0.90AME ahead
2026-07-10119.5264.21+0.99AME ahead
2026-07-09119.0264.22+0.98AME ahead
2026-07-08118.1864.03+0.97AME ahead
2026-07-07118.3665.63+0.90AME ahead
2026-07-06121.1465.72+0.98AME ahead
2026-07-02119.8565.71+0.95AME ahead
2026-07-01121.1363.99+1.09AME ahead
2026-06-30123.5961.05+1.34AME ahead
2026-06-29121.4360.40+1.32AME ahead
2026-06-26121.3361.04+1.29AME ahead
2026-06-25123.0859.98+1.41AME ahead
2026-06-24120.2459.83+1.35AME ahead
2026-06-23119.5759.46+1.36AME ahead
2026-06-22123.3958.65+1.53AME ahead
2026-06-18121.2859.58+1.43AME ahead
2026-06-17118.1459.53+1.35AME ahead
2026-06-16118.4660.86+1.29AME ahead
2026-06-15117.7259.98+1.33AME ahead
2026-06-12116.0260.44+1.26AME ahead
2026-06-11115.5560.03+1.28AME ahead
2026-06-10113.2960.28+1.21AME ahead
2026-06-09117.3960.51+1.33AME ahead
2026-06-08115.4260.22+1.30AME ahead
2026-06-05115.7359.93+1.33AME ahead
2026-06-04116.8659.86+1.38AME ahead
2026-06-03116.5959.85+1.39AME ahead
2026-06-02116.3360.71+1.34AME ahead
2026-06-01114.1062.11+1.20AME ahead
2026-05-29115.3758.73+1.45AME ahead
2026-05-28115.1757.69+1.52AME ahead
2026-05-27115.6457.12+1.58AME ahead
2026-05-26117.2057.79+1.60AME ahead
2026-05-22114.6958.99+1.46AME ahead
2026-05-21114.0058.47+1.49AME ahead
2026-05-20114.7958.30+1.53AME ahead
2026-05-19113.0459.34+1.43AME ahead
2026-05-18115.2759.72+1.49AME ahead
2026-05-15116.4257.90+1.65AME ahead
2026-05-14118.5857.36+1.76AME ahead
2026-05-13118.2257.06+1.79AME ahead
2026-05-12118.1058.45+1.71AME ahead
2026-05-11118.5959.32+1.69AME ahead
2026-05-08118.7261.94+1.56AME ahead
2026-05-07119.9163.59+1.51AME ahead
2026-05-06123.3063.19+1.65AME ahead
2026-05-05119.8164.33+1.49AME ahead
2026-05-04117.7164.09+1.46AME ahead
2026-05-01117.7464.63+1.44AME ahead
2026-04-30120.3064.02+1.56AME ahead
2026-04-29116.4064.22+1.45AME ahead
2026-04-28116.9563.89+1.49AME ahead
2026-04-27119.0163.59+1.59AME ahead
2026-04-24119.0063.76+1.59AME ahead
2026-04-23120.0465.63+1.53AME ahead
2026-04-22117.7365.80+1.46AME ahead
2026-04-21119.3065.48+1.54AME ahead
2026-04-20120.9764.93+1.64AME ahead
2026-04-17120.6965.39+1.62AME ahead
2026-04-16117.6165.29+1.54AME ahead
2026-04-15117.5464.61+1.59AME ahead
2026-04-14119.7263.87+1.72AME ahead
2026-04-13119.7764.29+1.71AME ahead
2026-04-10120.0061.91+1.87AME ahead
2026-04-09119.2763.13+1.80AME ahead
2026-04-08117.7464.20+1.70AME ahead
2026-04-07111.2364.74+1.48AME ahead
2026-04-06111.5864.99+1.49AME ahead
2026-04-02111.5164.57+1.52AME ahead
2026-04-01111.6864.21+1.56AME ahead
2026-03-31109.5063.84+1.52AME ahead
2026-03-30106.4463.50+1.45AME ahead
2026-03-27106.8962.14+1.56AME ahead
2026-03-26108.0363.34+1.54AME ahead
2026-03-25110.0062.56+1.67AME ahead
2026-03-24110.8462.41+1.73AME ahead
2026-03-23108.7163.78+1.59AME ahead
2026-03-20106.9563.81+1.54AME ahead
2026-03-19108.0463.74+1.60AME ahead
2026-03-18108.6963.29+1.66AME ahead
2026-03-17110.1163.67+1.71AME ahead
2026-03-16109.5863.54+1.72AME ahead
2026-03-13109.5763.33+1.75AME ahead
2026-03-12110.1262.57+1.83AME ahead
2026-03-11114.5863.55+1.95AME ahead
2026-03-10115.6063.85+1.99AME ahead
2026-03-09114.9765.50+1.89AME ahead
2026-03-06113.3966.30+1.81AME ahead
2026-03-05115.8866.04+1.93AME ahead
2026-03-04119.9265.18+2.15AME ahead
2026-03-03120.1764.23+2.25AME ahead
2026-03-02123.3463.86+2.41AME ahead
2026-02-27122.2063.10+2.46AME ahead
2026-02-26121.0563.54+2.43AME ahead
2026-02-25119.0362.11+2.50AME ahead
2026-02-24120.9860.93+2.70AME ahead
2026-02-23118.2360.57+2.67AME ahead
2026-02-20119.2860.58+2.76AME ahead
2026-02-19118.9059.90+2.86AME ahead
2026-02-18119.6959.11+3.01AME ahead
2026-02-17119.1956.93+3.24AME ahead
2026-02-13117.3757.99+3.16AME ahead
2026-02-12116.8257.70+3.23AME ahead
2026-02-11120.1960.22+3.24AME ahead
2026-02-10119.0862.94+3.05AME ahead
2026-02-09119.2363.46+3.08AME ahead
2026-02-06118.4765.39+2.95AME ahead
2026-02-05117.3863.33+3.14AME ahead
2026-02-04116.3864.90+3.04AME ahead
2026-02-03116.9462.93+3.31AME ahead
2026-02-02116.3367.23+2.98AME ahead
2026-01-30114.4266.98+2.97AME ahead
2026-01-29115.7665.85+3.21AME ahead
2026-01-28113.6565.02+3.26AME ahead
2026-01-27112.6766.62+3.13AME ahead
2026-01-26112.2873.73+2.55AME ahead
2026-01-23112.7673.54+2.63AME ahead
2026-01-22113.3673.52+2.72AME ahead
2026-01-21112.6073.01+2.77AME ahead
2026-01-20108.8872.85+2.62AME ahead
2026-01-16110.1675.08+2.54AME ahead
2026-01-15109.8474.74+2.60AME ahead
2026-01-14107.8576.53+2.35AME ahead
2026-01-13108.1676.92+2.37AME ahead
2026-01-12107.1578.01+2.24AME ahead
2026-01-09107.6078.45+2.27AME ahead
2026-01-08107.2978.39+2.28AME ahead
2026-01-07107.8878.95+2.30AME ahead
2026-01-06109.4078.76+2.46AME ahead
2026-01-05107.9477.88+2.48AME ahead
2026-01-02106.8378.40+2.40AME ahead
2025-12-31104.8880.31+2.11AME ahead
2025-12-30105.7681.20+2.12AME ahead
2025-12-29106.6181.34+2.20AME ahead
2025-12-26106.4881.34+2.22AME ahead
2025-12-24106.4081.40+2.24AME ahead
2025-12-23106.5481.07+2.31AME ahead
2025-12-22105.3581.05+2.26AME ahead
2025-12-19103.8580.29+2.25AME ahead
2025-12-18103.1781.28+2.13AME ahead
2025-12-17102.1181.59+2.04AME ahead
2025-12-16103.0880.07+2.30AME ahead
2025-12-15103.8080.03+2.39AME ahead
2025-12-12103.0580.44+2.33AME ahead
2025-12-11104.1380.44+2.45AME ahead
2025-12-10102.5079.80+2.42AME ahead
2025-12-09100.1179.50+2.28AME ahead
2025-12-08101.7980.60+2.34AME ahead
2025-12-05102.0680.75+2.39AME ahead
2025-12-04101.7780.25+2.45AME ahead
2025-12-03101.7780.45+2.47AME ahead
2025-12-02100.7880.13+2.46AME ahead
2025-12-0199.9280.03+2.43AME ahead
2025-11-28101.0980.51+2.52AME ahead
2025-11-26100.2780.48+2.48AME ahead
2025-11-25100.7580.54+2.56AME ahead
2025-11-2499.7279.32+2.65AME ahead
2025-11-2199.6280.06+2.59AME ahead
2025-11-2097.0779.54+2.44AME ahead
2025-11-1997.8680.25+2.47AME ahead
2025-11-1897.0180.18+2.42AME ahead
2025-11-1797.6780.09+2.55AME ahead
2025-11-1498.7781.10+2.58AME ahead
2025-11-1399.1880.78+2.71AME ahead
2025-11-12100.5382.13+2.72AME ahead
2025-11-11100.9679.98+3.13AME ahead
2025-11-10101.1581.16+3.05AME ahead
2025-11-07100.2780.66+3.09AME ahead
2025-11-06100.7680.19+3.30AME ahead
2025-11-05101.1780.44+3.40AME ahead
2025-11-04101.1781.06+3.39AME ahead
2025-11-03101.5180.93+3.55AME ahead
2025-10-31103.2480.49+3.95AME ahead
2025-10-30101.3180.00+3.92AME ahead
2025-10-2994.0980.52+2.93AME ahead
2025-10-2894.5582.30+2.75AME ahead
2025-10-2795.4083.67+2.70AME ahead
2025-10-2495.6086.39+2.33AME ahead
2025-10-2396.6586.59+2.48AME ahead
2025-10-2294.4791.83+1.37AME ahead
2025-10-2196.1992.83+1.48AME ahead
2025-10-2095.7291.27+1.66AME ahead
2025-10-1794.7491.03+1.57AME ahead
2025-10-1694.2490.22+1.64AME ahead
2025-10-1594.9090.16+1.76AME ahead
2025-10-1494.9092.70+1.38AME ahead
2025-10-1393.0992.51+1.15AME ahead
2025-10-1091.5891.83+1.03AME ahead
2025-10-0993.6493.47+1.10AME ahead
2025-10-0893.5893.82+1.05AME ahead
2025-10-0792.6792.12+1.18AME ahead
2025-10-0693.4891.47+1.42AME ahead
2025-10-0393.8690.20+1.69AME ahead
2025-10-0295.0889.78+1.96AME ahead
2025-10-0195.7589.84+2.08AME ahead
2025-09-3096.0489.97+2.13AME ahead
2025-09-2995.4690.38+2.00AME ahead
2025-09-2695.2190.09+2.04AME ahead
2025-09-2594.1989.31+2.03AME ahead
2025-09-2495.1091.24+1.88AME ahead
2025-09-2395.3690.93+1.99AME ahead
2025-09-2296.2791.95+1.99AME ahead
2025-09-1995.9791.04+2.12AME ahead
2025-09-1896.3991.84+2.08AME ahead
2025-09-1795.1491.95+1.88AME ahead
2025-09-1695.6690.65+2.22AME ahead
2025-09-1596.8391.15+2.35AME ahead
2025-09-1297.0292.47+2.19AME ahead
2025-09-1198.0993.35+2.24AME ahead
2025-09-1095.7392.60+2.00AME ahead
2025-09-0995.7793.76+1.83AME ahead
2025-09-0896.3894.44+1.83AME ahead
2025-09-0595.7693.54+1.90AME ahead
2025-09-0495.9795.10+1.69AME ahead
2025-09-0394.1794.56+1.49AME ahead
2025-09-0294.4193.64+1.71AME ahead
2025-08-2994.4094.96+1.49AME ahead
2025-08-2895.3995.01+1.67AME ahead
2025-08-2795.3095.38+1.60AME ahead
2025-08-2695.4194.62+1.77AME ahead
2025-08-2594.7995.68+1.50AME ahead
2025-08-2295.5096.86+1.43AME ahead
2025-08-2193.7195.07+1.43AME ahead
2025-08-2093.6697.52+1.01AME ahead
2025-08-1994.6196.09+1.43AME ahead
2025-08-1893.2996.03+1.22AME ahead
2025-08-1592.6495.56+1.20AME ahead
2025-08-1494.3994.71+1.68AME ahead
2025-08-1395.4894.28+1.97AME ahead
2025-08-1294.4793.73+1.91AME ahead
2025-08-1193.2495.17+1.44AME ahead
2025-08-0893.0196.41+1.18AME ahead
2025-08-0793.0996.83+1.13AME ahead
2025-08-0694.7497.76+1.28AME ahead
2025-08-0594.4897.05+1.37AME ahead
2025-08-0494.2498.59+1.06AME ahead
2025-08-0193.1597.81+1.01AME ahead
2025-07-3194.4399.30+0.98AME ahead
2025-07-3090.2999.65+0.15near the usual relationship
2025-07-2991.42101.59+0.04near the usual relationship
2025-07-2891.36100.86+0.15near the usual relationship
2025-07-2592.00101.58+0.15near the usual relationship
2025-07-2491.81101.10+0.20near the usual relationship
2025-07-2392.60100.50+0.46near the usual relationship
2025-07-2291.54101.73+0.06near the usual relationship
2025-07-2190.9799.58+0.32near the usual relationship
2025-07-1891.1998.29+0.59AME ahead
2025-07-1791.8098.57+0.65AME ahead
2025-07-1690.4498.37+0.44near the usual relationship
2025-07-1590.1398.30+0.40near the usual relationship
2025-07-1491.1198.93+0.48near the usual relationship
2025-07-1192.4498.77+0.76AME ahead
2025-07-1092.6899.20+0.74AME ahead
2025-07-0993.11100.79+0.55AME ahead
2025-07-0892.63101.86+0.29near the usual relationship
2025-07-0793.16102.12+0.35near the usual relationship
2025-07-0394.09103.38+0.31near the usual relationship
2025-07-0292.97102.13+0.32near the usual relationship
2025-07-0193.51103.33+0.23near the usual relationship
2025-06-3092.44102.27+0.21near the usual relationship
2025-06-2792.22101.67+0.27near the usual relationship
2025-06-2691.86101.99+0.16near the usual relationship
2025-06-2590.93102.29-0.06near the usual relationship
2025-06-2491.56103.02-0.06near the usual relationship
2025-06-2390.56102.15-0.10near the usual relationship
2025-06-2090.26101.39-0.03near the usual relationship
2025-06-1890.81100.27+0.26near the usual relationship
2025-06-1789.68101.50-0.15near the usual relationship
2025-06-1691.25102.06+0.05near the usual relationship
2025-06-1390.40101.17+0.04near the usual relationship
2025-06-1291.93103.21-0.01near the usual relationship
2025-06-1192.41102.76+0.15near the usual relationship
2025-06-1091.88103.23-0.02near the usual relationship
2025-06-0991.25103.40-0.16near the usual relationship
2025-06-0691.11103.36-0.18near the usual relationship
2025-06-0590.38102.75-0.22near the usual relationship
2025-06-0490.52102.48-0.15near the usual relationship
2025-06-0390.78102.46-0.10near the usual relationship
2025-06-0290.07102.24-0.20near the usual relationship
2025-05-3091.31102.89-0.07near the usual relationship
2025-05-2991.97101.81+0.22near the usual relationship
2025-05-2891.42102.68-0.02near the usual relationship
2025-05-2792.36103.53+0.01near the usual relationship
2025-05-2390.74102.30-0.08near the usual relationship
2025-05-2291.20102.67-0.06near the usual relationship
2025-05-2190.76103.35-0.25near the usual relationship
2025-05-2092.36104.32-0.11near the usual relationship
2025-05-1992.91104.73-0.08near the usual relationship
2025-05-1693.35105.16-0.07near the usual relationship
2025-05-1592.06103.63-0.06near the usual relationship
2025-05-1491.62102.11+0.10near the usual relationship
2025-05-1392.20104.12-0.12near the usual relationship
2025-05-1291.63103.89-0.19near the usual relationship
2025-05-0987.73102.93-0.76ROP ahead
2025-05-0887.64103.74-0.91ROP ahead
2025-05-0786.69103.61-1.08ROP ahead
2025-05-0685.74102.79-1.14ROP ahead
2025-05-0586.98103.04-0.95ROP ahead
2025-05-0286.88102.13-0.83ROP ahead
2025-05-0185.44100.60-0.86ROP ahead
2025-04-3086.63101.05-0.71ROP ahead
2025-04-2985.72100.34-0.78ROP ahead
2025-04-2884.9599.58-0.81ROP ahead
2025-04-2585.15100.62-0.95ROP ahead
2025-04-2485.43100.97-0.96ROP ahead
2025-04-2382.8599.43-1.22ROP ahead
2025-04-2281.5599.47-1.50ROP ahead
2025-04-2179.3197.30-1.62ROP ahead
2025-04-1780.61100.54-1.91ROP ahead
2025-04-1680.98100.36-1.83ROP ahead
2025-04-1581.84102.31-2.00ROP ahead
2025-04-1482.43102.10-1.86ROP ahead
2025-04-1181.20101.06-1.97ROP ahead
2025-04-1080.4199.16-1.83ROP ahead
2025-04-0982.2499.91-1.58ROP ahead
2025-04-0877.3493.67-1.55ROP ahead
2025-04-0778.3396.08-1.79ROP ahead
2025-04-0477.9897.75-2.19ROP ahead
2025-04-0382.49104.59-2.43ROP ahead
2025-04-0288.23106.51-1.57ROP ahead
2025-04-0187.81106.59-1.69ROP ahead
2025-03-3187.93106.37-1.64ROP ahead
2025-03-2887.04105.12-1.63ROP ahead
2025-03-2789.68106.91-1.41ROP ahead
2025-03-2690.37105.13-0.97ROP ahead
2025-03-2591.80104.48-0.58ROP ahead
2025-03-2491.35104.04-0.59ROP ahead
2025-03-2189.15103.23-0.90ROP ahead
2025-03-2089.87103.82-0.87ROP ahead
2025-03-1990.45104.25-0.83ROP ahead
2025-03-1889.95104.08-0.91ROP ahead
2025-03-1791.25103.85-0.61ROP ahead
2025-03-1489.98102.71-0.67ROP ahead
2025-03-1388.33101.56-0.81ROP ahead
2025-03-1290.52102.19-0.48near the usual relationship
2025-03-1191.37102.07-0.29near the usual relationship
2025-03-1091.63104.00-0.58ROP ahead
2025-03-0793.99106.16-0.50ROP ahead
2025-03-0694.06106.14-0.48near the usual relationship
2025-03-0594.52107.14-0.57ROP ahead
2025-03-0493.65105.52-0.46near the usual relationship
2025-03-0395.30105.69-0.18near the usual relationship
2025-02-2896.70105.46+0.13near the usual relationship
2025-02-2795.69103.29+0.32near the usual relationship
2025-02-2696.13103.77+0.32near the usual relationship
2025-02-2595.50105.97-0.19near the usual relationship
2025-02-2494.90104.03+0.04near the usual relationship
2025-02-2195.11103.57+0.16near the usual relationship
2025-02-2096.43104.90+0.18near the usual relationship
2025-02-1996.48104.11+0.33near the usual relationship
2025-02-1894.18103.30+0.03near the usual relationship
2025-02-1493.76103.49-0.08near the usual relationship
2025-02-1394.21103.46+0.01near the usual relationship
2025-02-1294.76102.26+0.34near the usual relationship
2025-02-1194.67104.89-0.14near the usual relationship
2025-02-1095.00103.66+0.14near the usual relationship
2025-02-0794.25103.34+0.06near the usual relationship
2025-02-0693.43105.26-0.43near the usual relationship
2025-02-0592.07104.90-0.64ROP ahead
2025-02-0492.20104.22-0.49near the usual relationship
2025-02-0394.06104.11-0.10near the usual relationship
2025-01-3194.28103.86-0.01near the usual relationship
2025-01-3095.01102.95+0.29near the usual relationship
2025-01-2993.2497.97+0.84AME ahead
2025-01-2893.4399.16+0.67AME ahead
2025-01-2794.4897.67+1.15AME ahead
2025-01-2496.0395.87+1.79AME ahead
2025-01-2397.2896.21+1.98AME ahead
2025-01-2296.3996.43+1.79AME ahead
2025-01-2194.3595.77+1.54AME ahead
2025-01-1792.3294.24+1.45AME ahead
2025-01-1692.3993.66+1.59AME ahead
2025-01-1591.9893.45+1.57AME ahead
2025-01-1491.5292.14+1.75AME ahead
2025-01-1390.1691.65+1.59AME ahead
2025-01-1089.9890.70+1.76AME ahead
2025-01-0891.1692.07+1.74AME ahead
2025-01-0791.2891.49+1.91AME ahead
2025-01-0691.6691.49+2.01AME ahead
2025-01-0391.7392.85+1.77AME ahead
2025-01-0291.1092.70+1.68AME ahead
2024-12-3192.0893.79+1.68AME ahead
2024-12-3092.3393.80+1.75AME ahead
2024-12-2793.2094.52+1.80AME ahead
2024-12-2693.8595.13+1.83AME ahead
2024-12-2494.0295.29+1.85AME ahead
2024-12-2393.0194.71+1.78AME ahead
2024-12-2093.6794.79+1.92AME ahead
2024-12-1993.0394.13+1.95AME ahead
2024-12-1892.3495.03+1.63AME ahead
2024-12-1795.3896.84+1.92AME ahead
2024-12-1696.7497.80+2.03AME ahead
2024-12-1395.7298.09+1.78AME ahead
2024-12-1296.2798.88+1.75AME ahead
2024-12-1196.3799.30+1.70AME ahead
2024-12-1096.3499.14+1.74AME ahead
2024-12-0997.0098.95+1.94AME ahead
2024-12-0697.8499.45+2.03AME ahead
2024-12-0599.08100.66+2.06AME ahead
2024-12-0499.61103.91+1.54AME ahead
2024-12-0399.27102.27+1.81AME ahead
2024-12-0299.90102.59+1.89AME ahead
2024-11-2999.30102.20+1.86AME ahead
2024-11-2799.66101.82+2.03AME ahead
2024-11-26100.64101.38+2.35AME ahead
2024-11-25100.69100.66+2.55AME ahead
2024-11-22100.83101.06+2.53AME ahead
2024-11-21100.00100.00+2.63AME ahead

One-day company-specific moves (4+ standard deviations, which block ideas for 10 sessions): Oct 23, 2025 (AME +2.3%, ROP -5.7%); Oct 30, 2025 (AME +7.7%, ROP -0.7%); Jan 27, 2026 (AME +0.3%, ROP -9.6%); Feb 3, 2026 (AME +0.5%, ROP -6.4%); Oct 22, 2026 (AME -4.6%, ROP +9.7%).

Paired trades

The shared paper book and the replay, kept apart

Forward paper record

No paper position on this pair yet.

Historical simulation (a diagnostic, same rules)

1 simulated trade to Nov 24, 2026: -4.56% per trade on average after costs, 0 won.

LegsEnteredExitedWhyDaysBefore costsCosts + borrowAfter costs
Long AME · Short ROPJul 9, 2018Oct 25, 2018divergence stop108-$381.63-$76.72-$455.56 (-4.56%)

Per $10,000 a leg. A replay on today's companies cannot prove an edge.

The companies

AME and ROP at a glance

AME AMETEK Inc.

Listing
NYSE · SEC CIK 1037868
Industry
Industrial Machinery/Components · SIC 3823 Industrial Instruments For Measurement, Display, and Control
Market value
$52.2B
Price history
2,545 daily closes, Oct 12, 2016 to Nov 25, 2026 (not current)

ROP Roper Technologies Inc.

Listing
Nasdaq · SEC CIK 882835
Industry
Industrial Machinery/Components · SIC 3823 Industrial Instruments For Measurement, Display, and Control
Market value
$47.2B
Price history
2,514 daily closes, Nov 25, 2016 to Nov 25, 2026 (not current)

Daily prices: Nasdaq.com. Filings and industry codes: SEC EDGAR. Earnings dates: Nasdaq earnings calendar.

Related
All pairs →
PairStatusAhead nowIndustry
DHR / ROPData problemROP by 1.83 sdSIC 3823 Industrial Instruments For Measurement, Display, and Control
DHR / AMEData problemDHR by 0.86 sdSIC 3823 Industrial Instruments For Measurement, Display, and Control

Follow the research behind the paper book

Boostio is a research-first platform in private beta: crypto candidates, daily market stories, public paper trading and now rival stocks. Exploring these pages stays free and open.

Explore the private beta

Paper only: hypothetical paired positions with modelled costs. No broker, no orders, no real money. A historical simulation is a diagnostic, not proof of an edge. Not investment advice.