Biotechnology: Pharmaceutical Preparations

AbbVie Inc. vs Eli Lilly and Company

WatchlistABBV / LLYPrices through Oct 22, 2026

Why these are rivals: #1 and #3 by market value ($1168B vs $500B) in Nasdaq's "Biotechnology: Pharmaceutical Preparations" industry; SEC SIC 2834 / 2834 (same major group); #1 and #3 by market value ($1168B vs $500B) with SEC SIC 2834 (Pharmaceutical Preparations).

Rivals, but right now the price gap does not have a measured habit of closing, so there is no paper idea, whatever the gap.

  • Co-movement: daily return correlation, 252 sessions: 0.38 (needs >= 0.60)
Business leadership

LLY is the larger business

Annual revenue reported to the SEC. Scale, not market share.

YearABBVLLYLarger
2025$61.2B$65.2BLLY
2024$56.3B$45.0BABBV
2023$54.3B$34.1BABBV
2022$58.1B$28.5BABBV
2021$56.2B$28.3BABBV
2020$45.8B$24.5BABBV

Revenue lead switched: 2025 to LLY. Market value: ABBV $499.5B, LLY $1.17T.

Stock leadership

Neither is clearly ahead

Measured against the pair's own last 252 trading days.

The gap is 0.07 standard deviations, close to the usual relationship. 2 lead switches in the last year.

Price change3 mo6 mo12 mo
ABBV+10.0%+41.9%+23.3%
LLY+9.3%+42.4%+63.4%
Relationship

Not a measured twin today

Only these tests can make a pair tradable on paper.

Pass
Aligned sessions: 2521 (needs >= 254)
Fail
Co-movement: daily return correlation, 252 sessions: 0.38 (needs >= 0.60)
Pass
Mean reversion: ADF t-statistic of the spread: -4.18 (needs <= -2.873 (5% critical value))
Pass
Speed: half-life of the spread, sessions: 7.32 (needs <= 63)
Data
Both stocks current
The twins over two years

Prices side by side, and the gap between them

ABBV AbbVie Inc. LLY Eli Lilly and CompanyPrice index, 100 = 2024-10-18. Tint = which stock is ahead of the pair's usual 1-year relationship (z beyond +/-0.5).
100150Oct 2024Oct 2025Oct 2026ABBV 151LLY 142
Spread z-score: ABBV relative to LLY, against the 252 sessions before each day. Above 0: ABBV ahead; below 0: LLY ahead. Lines at +/-2 (idea) and +/-4 (stop).
-4stop-2idea0+2idea+4stopOct 2024Oct 2025Oct 2026
Data table (504 sessions)
DateABBV indexLLY indexzAhead
2026-10-22151.01142.35-0.07near the usual relationship
2026-10-21150.80138.43+0.31near the usual relationship
2026-10-20153.07139.84+0.36near the usual relationship
2026-10-19149.68135.12+0.51ABBV ahead
2026-10-16151.13136.94+0.43near the usual relationship
2026-10-15150.06136.35+0.38near the usual relationship
2026-10-14150.10131.68+0.82ABBV ahead
2026-10-13145.27127.07+0.84ABBV ahead
2026-10-12148.85128.83+0.96ABBV ahead
2026-10-09146.39128.46+0.76ABBV ahead
2026-10-08144.24127.41+0.66ABBV ahead
2026-10-07143.68129.49+0.40near the usual relationship
2026-10-06141.21126.09+0.49near the usual relationship
2026-10-05140.72124.53+0.58ABBV ahead
2026-10-02139.16124.50+0.43near the usual relationship
2026-10-01137.63125.26+0.21near the usual relationship
2026-09-30138.51126.05+0.19near the usual relationship
2026-09-29139.41129.05-0.01near the usual relationship
2026-09-28140.99129.07+0.09near the usual relationship
2026-09-25139.97128.92+0.02near the usual relationship
2026-09-24140.38128.75+0.05near the usual relationship
2026-09-23140.36125.38+0.30near the usual relationship
2026-09-22140.43127.47+0.13near the usual relationship
2026-09-21140.04126.90+0.14near the usual relationship
2026-09-18139.76125.60+0.20near the usual relationship
2026-09-17139.80125.54+0.20near the usual relationship
2026-09-16139.00123.95+0.26near the usual relationship
2026-09-15139.28123.76+0.28near the usual relationship
2026-09-14138.61124.00+0.20near the usual relationship
2026-09-11136.14121.54+0.21near the usual relationship
2026-09-10135.02122.34+0.07near the usual relationship
2026-09-09132.86122.47-0.09near the usual relationship
2026-09-08131.73122.43-0.18near the usual relationship
2026-09-04135.79125.21-0.11near the usual relationship
2026-09-03137.78126.32-0.07near the usual relationship
2026-09-02138.58126.37-0.03near the usual relationship
2026-09-01137.66126.37-0.10near the usual relationship
2026-08-31135.77126.01-0.20near the usual relationship
2026-08-28135.27127.96-0.37near the usual relationship
2026-08-27136.69128.12-0.30near the usual relationship
2026-08-26139.20129.57-0.24near the usual relationship
2026-08-25140.73134.39-0.46near the usual relationship
2026-08-24140.06135.84-0.60LLY ahead
2026-08-21140.29136.76-0.65LLY ahead
2026-08-20138.64135.56-0.68LLY ahead
2026-08-19140.83139.48-0.79LLY ahead
2026-08-18137.10133.53-0.66LLY ahead
2026-08-17132.55128.89-0.65LLY ahead
2026-08-14132.09128.56-0.66LLY ahead
2026-08-13132.81131.70-0.81LLY ahead
2026-08-12131.72132.93-0.95LLY ahead
2026-08-11132.42132.36-0.88LLY ahead
2026-08-10131.30134.20-1.06LLY ahead
2026-08-07130.28129.17-0.84LLY ahead
2026-08-06129.13129.85-0.95LLY ahead
2026-08-05130.36127.44-0.74LLY ahead
2026-08-04129.09121.54-0.46near the usual relationship
2026-08-03129.78122.16-0.47near the usual relationship
2026-07-31132.87125.15-0.48near the usual relationship
2026-07-30136.30125.82-0.33near the usual relationship
2026-07-29139.42131.81-0.51LLY ahead
2026-07-28139.36132.97-0.58LLY ahead
2026-07-27136.03130.45-0.62LLY ahead
2026-07-24137.33130.29-0.55LLY ahead
2026-07-23136.04129.18-0.56LLY ahead
2026-07-22134.12126.69-0.52LLY ahead
2026-07-21135.60128.04-0.52LLY ahead
2026-07-20134.16124.94-0.42near the usual relationship
2026-07-17134.75128.45-0.60LLY ahead
2026-07-16134.70127.36-0.54LLY ahead
2026-07-15129.25126.00-0.78LLY ahead
2026-07-14129.61125.55-0.73LLY ahead
2026-07-13131.31128.75-0.83LLY ahead
2026-07-10131.36129.48-0.88LLY ahead
2026-07-09132.33132.57-1.01LLY ahead
2026-07-08133.82132.45-0.92LLY ahead
2026-07-07134.84134.60-0.99LLY ahead
2026-07-06134.89130.73-0.77LLY ahead
2026-07-02138.23132.24-0.68LLY ahead
2026-07-01132.93129.82-0.84LLY ahead
2026-06-30133.24130.66-0.88LLY ahead
2026-06-29134.66133.98-0.99LLY ahead
2026-06-26134.15131.61-0.89LLY ahead
2026-06-25128.74122.85-0.68LLY ahead
2026-06-24124.37121.71-0.88LLY ahead
2026-06-23124.30120.60-0.82LLY ahead
2026-06-22121.79120.06-0.95LLY ahead
2026-06-18114.63119.67-1.40LLY ahead
2026-06-17117.14121.14-1.34LLY ahead
2026-06-16117.80122.28-1.38LLY ahead
2026-06-15117.33123.03-1.47LLY ahead
2026-06-12120.58123.42-1.29LLY ahead
2026-06-11119.01126.47-1.60LLY ahead
2026-06-10119.11123.79-1.43LLY ahead
2026-06-09119.36124.70-1.49LLY ahead
2026-06-08118.11125.18-1.62LLY ahead
2026-06-05120.32123.25-1.36LLY ahead
2026-06-04119.10122.58-1.41LLY ahead
2026-06-03114.97117.52-1.36LLY ahead
2026-06-02114.05115.92-1.33LLY ahead
2026-06-01112.74117.89-1.57LLY ahead
2026-05-29115.28120.37-1.58LLY ahead
2026-05-28115.76122.75-1.72LLY ahead
2026-05-27114.05117.97-1.53LLY ahead
2026-05-26112.85115.99-1.49LLY ahead
2026-05-22114.21116.02-1.41LLY ahead
2026-05-21113.58113.47-1.28LLY ahead
2026-05-20112.41110.99-1.19LLY ahead
2026-05-19113.18111.27-1.16LLY ahead
2026-05-18110.88107.64-1.06LLY ahead
2026-05-15111.40109.47-1.17LLY ahead
2026-05-14111.60109.67-1.18LLY ahead
2026-05-13110.40110.65-1.36LLY ahead
2026-05-12110.06107.83-1.18LLY ahead
2026-05-11107.37105.34-1.20LLY ahead
2026-05-08106.72103.32-1.09LLY ahead
2026-05-07107.33106.21-1.29LLY ahead
2026-05-06108.56107.53-1.30LLY ahead
2026-05-05109.13107.72-1.28LLY ahead
2026-05-04110.22105.44-1.02LLY ahead
2026-05-01109.39104.94-1.04LLY ahead
2026-04-30111.89101.81-0.58LLY ahead
2026-04-29107.9692.73-0.08near the usual relationship
2026-04-28104.6895.21-0.57LLY ahead
2026-04-27104.5194.59-0.53LLY ahead
2026-04-24105.2296.30-0.62LLY ahead
2026-04-23106.4099.97-0.84LLY ahead
2026-04-22106.16100.38-0.89LLY ahead
2026-04-21108.6198.37-0.52LLY ahead
2026-04-20107.86100.21-0.74LLY ahead
2026-04-17110.34100.99-0.61LLY ahead
2026-04-16110.6698.48-0.37near the usual relationship
2026-04-15110.3698.59-0.41near the usual relationship
2026-04-14111.33100.49-0.50LLY ahead
2026-04-13109.32101.26-0.72LLY ahead
2026-04-10110.10102.34-0.76LLY ahead
2026-04-09112.46104.05-0.72LLY ahead
2026-04-08112.04103.85-0.74LLY ahead
2026-04-07109.27101.43-0.76LLY ahead
2026-04-06109.44100.99-0.72LLY ahead
2026-04-02110.58101.92-0.71LLY ahead
2026-04-01113.83103.98-0.64LLY ahead
2026-03-31115.16100.20-0.22near the usual relationship
2026-03-30112.8596.59-0.08near the usual relationship
2026-03-27110.8895.67-0.15near the usual relationship
2026-03-26111.7997.72-0.26near the usual relationship
2026-03-25109.7099.82-0.61LLY ahead
2026-03-24108.6598.37-0.57LLY ahead
2026-03-23108.5199.19-0.66LLY ahead
2026-03-20108.5898.77-0.62LLY ahead
2026-03-19109.2099.95-0.68LLY ahead
2026-03-18110.31100.01-0.60LLY ahead
2026-03-17116.36101.35-0.26near the usual relationship
2026-03-16117.26107.75-0.73LLY ahead
2026-03-13116.32107.31-0.77LLY ahead
2026-03-12119.33106.46-0.48near the usual relationship
2026-03-11120.55108.92-0.59LLY ahead
2026-03-10120.20109.08-0.64LLY ahead
2026-03-09120.43109.85-0.68LLY ahead
2026-03-06121.84107.88-0.42near the usual relationship
2026-03-05123.03107.11-0.28near the usual relationship
2026-03-04125.06109.32-0.31near the usual relationship
2026-03-03123.83109.78-0.43near the usual relationship
2026-03-02124.04110.89-0.50LLY ahead
2026-02-27122.88114.60-0.87LLY ahead
2026-02-26118.97111.33-0.90LLY ahead
2026-02-25120.15112.08-0.87LLY ahead
2026-02-24120.96113.53-0.93LLY ahead
2026-02-23121.51115.32-1.03LLY ahead
2026-02-20119.04109.97-0.80LLY ahead
2026-02-19118.79111.47-0.93LLY ahead
2026-02-18121.11111.18-0.75LLY ahead
2026-02-17123.30112.86-0.72LLY ahead
2026-02-13122.58113.29-0.80LLY ahead
2026-02-12120.46113.11-0.94LLY ahead
2026-02-11116.96110.59-1.00LLY ahead
2026-02-10117.78111.66-1.03LLY ahead
2026-02-09118.21113.80-1.16LLY ahead
2026-02-06118.30115.27-1.27LLY ahead
2026-02-05115.97111.21-1.14LLY ahead
2026-02-04114.96120.61-1.94LLY ahead
2026-02-03119.49109.31-0.74LLY ahead
2026-02-02119.47113.74-1.09LLY ahead
2026-01-30118.08112.98-1.13LLY ahead
2026-01-29116.72111.57-1.12LLY ahead
2026-01-28115.78111.53-1.19LLY ahead
2026-01-27118.57113.24-1.12LLY ahead
2026-01-26116.90115.77-1.45LLY ahead
2026-01-23116.10115.94-1.53LLY ahead
2026-01-22115.49118.45-1.78LLY ahead
2026-01-21114.45117.49-1.81LLY ahead
2026-01-20113.33113.43-1.59LLY ahead
2026-01-16113.50113.12-1.56LLY ahead
2026-01-15114.77112.53-1.42LLY ahead
2026-01-14117.49116.92-1.57LLY ahead
2026-01-13116.89117.34-1.65LLY ahead
2026-01-12116.51117.76-1.73LLY ahead
2026-01-09116.53115.86-1.59LLY ahead
2026-01-08118.68118.22-1.62LLY ahead
2026-01-07123.59120.71-1.44LLY ahead
2026-01-06118.57115.91-1.46LLY ahead
2026-01-05116.58113.46-1.43LLY ahead
2026-01-02121.42117.69-1.39LLY ahead
2025-12-31120.98117.07-1.38LLY ahead
2025-12-30121.65117.62-1.38LLY ahead
2025-12-29122.23117.51-1.33LLY ahead
2025-12-26121.77117.41-1.37LLY ahead
2025-12-24121.73117.32-1.37LLY ahead
2025-12-23121.14116.74-1.37LLY ahead
2025-12-22120.68117.27-1.46LLY ahead
2025-12-19120.10116.72-1.47LLY ahead
2025-12-18117.98115.13-1.51LLY ahead
2025-12-17118.77113.49-1.31LLY ahead
2025-12-16118.43114.85-1.46LLY ahead
2025-12-15120.43115.71-1.37LLY ahead
2025-12-12118.25111.93-1.23LLY ahead
2025-12-11118.60109.96-1.03LLY ahead
2025-12-10119.23108.24-0.82LLY ahead
2025-12-09118.07107.00-0.80LLY ahead
2025-12-08118.14108.67-0.94LLY ahead
2025-12-05119.71110.06-0.93LLY ahead
2025-12-04121.10110.51-0.86LLY ahead
2025-12-03121.91112.59-0.98LLY ahead
2025-12-02118.80113.96-1.35LLY ahead
2025-12-01119.19115.24-1.43LLY ahead
2025-11-28120.57117.16-1.49LLY ahead
2025-11-26120.54120.30-1.76LLY ahead
2025-11-25122.74120.91-1.65LLY ahead
2025-11-24121.52116.58-1.39LLY ahead
2025-11-21125.11115.44-1.01LLY ahead
2025-11-20121.49113.65-1.15LLY ahead
2025-11-19123.32114.34-1.06LLY ahead
2025-11-18123.83112.21-0.83LLY ahead
2025-11-17123.90111.30-0.74LLY ahead
2025-11-14123.03111.69-0.84LLY ahead
2025-11-13123.00111.43-0.81LLY ahead
2025-11-12123.49110.87-0.73LLY ahead
2025-11-11119.23107.70-0.79LLY ahead
2025-11-10115.81105.30-0.86LLY ahead
2025-11-07116.04100.70-0.41near the usual relationship
2025-11-06115.98102.12-0.55LLY ahead
2025-11-05114.78100.85-0.53LLY ahead
2025-11-04114.3198.79-0.37near the usual relationship
2025-11-03112.2397.66-0.44near the usual relationship
2025-10-31115.4594.00+0.21near the usual relationship
2025-10-30120.8392.00+0.87ABBV ahead
2025-10-29119.2188.62+1.11ABBV ahead
2025-10-28120.4889.34+1.14ABBV ahead
2025-10-27120.7490.03+1.10ABBV ahead
2025-10-24120.7289.92+1.12ABBV ahead
2025-10-23120.8689.44+1.19ABBV ahead
2025-10-22121.0888.50+1.31ABBV ahead
2025-10-21122.5287.10+1.59ABBV ahead
2025-10-20122.8788.12+1.52ABBV ahead
2025-10-17121.5687.46+1.50ABBV ahead
2025-10-16120.1389.26+1.20ABBV ahead
2025-10-15119.7890.04+1.10ABBV ahead
2025-10-14121.3288.49+1.40ABBV ahead
2025-10-13121.9489.26+1.37ABBV ahead
2025-10-10122.0590.80+1.23ABBV ahead
2025-10-09122.1593.18+1.00ABBV ahead
2025-10-08122.4492.13+1.14ABBV ahead
2025-10-07123.2891.90+1.24ABBV ahead
2025-10-06121.8892.06+1.12ABBV ahead
2025-10-03123.8591.49+1.34ABBV ahead
2025-10-02125.2689.31+1.70ABBV ahead
2025-10-01129.4089.92+1.97ABBV ahead
2025-09-30122.6083.12+2.24ABBV ahead
2025-09-29118.1679.14+2.39ABBV ahead
2025-09-26116.8178.93+2.33ABBV ahead
2025-09-25115.7277.84+2.41ABBV ahead
2025-09-24116.4880.81+2.13ABBV ahead
2025-09-23117.8781.37+2.20ABBV ahead
2025-09-22117.8682.24+2.12ABBV ahead
2025-09-19117.8081.92+2.19ABBV ahead
2025-09-18117.5483.11+2.04ABBV ahead
2025-09-17116.9282.81+2.05ABBV ahead
2025-09-16114.5183.30+1.79ABBV ahead
2025-09-15115.2281.50+2.10ABBV ahead
2025-09-12115.6182.29+2.06ABBV ahead
2025-09-11116.6082.39+2.17ABBV ahead
2025-09-10112.0682.21+1.79ABBV ahead
2025-09-09111.4281.77+1.81ABBV ahead
2025-09-08111.0880.46+1.97ABBV ahead
2025-09-05112.5579.22+2.30ABBV ahead
2025-09-04112.7880.93+2.12ABBV ahead
2025-09-03112.1880.38+2.16ABBV ahead
2025-09-02112.2180.09+2.23ABBV ahead
2025-08-29111.4179.80+2.21ABBV ahead
2025-08-28110.0979.74+2.12ABBV ahead
2025-08-27110.1779.98+2.12ABBV ahead
2025-08-26110.3380.18+2.13ABBV ahead
2025-08-25109.9075.75+2.77ABBV ahead
2025-08-22111.5177.53+2.71ABBV ahead
2025-08-21110.9377.32+2.73ABBV ahead
2025-08-20110.7476.85+2.84ABBV ahead
2025-08-19109.1876.60+2.75ABBV ahead
2025-08-18109.3876.04+2.92ABBV ahead
2025-08-15109.4476.39+2.93ABBV ahead
2025-08-14108.3874.56+3.18ABBV ahead
2025-08-13106.6871.95+3.51ABBV ahead
2025-08-12105.1869.66+3.87ABBV ahead
2025-08-11105.1869.20+4.09ABBV ahead
2025-08-08104.8768.16+4.44ABBV ahead
2025-08-07105.2969.81+4.32ABBV ahead
2025-08-06103.9481.31+1.96ABBV ahead
2025-08-05105.1383.44+1.77ABBV ahead
2025-08-04104.4183.77+1.63ABBV ahead
2025-08-01103.3783.05+1.62ABBV ahead
2025-07-31100.0880.62+1.60ABBV ahead
2025-07-30100.2482.80+1.23ABBV ahead
2025-07-29101.2583.11+1.34ABBV ahead
2025-07-2899.8288.03+0.28near the usual relationship
2025-07-25100.7588.53+0.34near the usual relationship
2025-07-24101.0487.74+0.52ABBV ahead
2025-07-23100.8987.03+0.62ABBV ahead
2025-07-2299.0784.58+0.78ABBV ahead
2025-07-2197.8883.03+0.87ABBV ahead
2025-07-18100.2184.07+1.03ABBV ahead
2025-07-17101.3482.95+1.36ABBV ahead
2025-07-16100.9186.04+0.80ABBV ahead
2025-07-1598.6984.07+0.82ABBV ahead
2025-07-14101.4187.08+0.71ABBV ahead
2025-07-11101.9086.39+0.88ABBV ahead
2025-07-10103.2586.13+1.09ABBV ahead
2025-07-09100.9385.72+0.87ABBV ahead
2025-07-08100.4884.72+0.96ABBV ahead
2025-07-0799.3584.19+0.90ABBV ahead
2025-07-03100.2285.04+0.89ABBV ahead
2025-07-02101.0084.89+1.01ABBV ahead
2025-07-01100.6084.52+1.02ABBV ahead
2025-06-3098.2884.92+0.69ABBV ahead
2025-06-2796.5384.47+0.55ABBV ahead
2025-06-2698.9086.62+0.55ABBV ahead
2025-06-2598.1686.31+0.51ABBV ahead
2025-06-2498.2584.76+0.73ABBV ahead
2025-06-2397.3083.95+0.74ABBV ahead
2025-06-2098.1283.09+0.96ABBV ahead
2025-06-1898.2285.52+0.65ABBV ahead
2025-06-1798.2186.19+0.56ABBV ahead
2025-06-16101.0687.97+0.66ABBV ahead
2025-06-13101.1889.26+0.52ABBV ahead
2025-06-12101.8888.46+0.70ABBV ahead
2025-06-11101.4088.09+0.70ABBV ahead
2025-06-10100.3487.93+0.61ABBV ahead
2025-06-09100.1684.28+1.07ABBV ahead
2025-06-06100.5183.87+1.17ABBV ahead
2025-06-0599.2683.41+1.10ABBV ahead
2025-06-0499.2083.43+1.10ABBV ahead
2025-06-0399.1581.79+1.32ABBV ahead
2025-06-0299.0181.39+1.37ABBV ahead
2025-05-3098.5480.36+1.47ABBV ahead
2025-05-2998.2878.71+1.69ABBV ahead
2025-05-2896.9478.37+1.60ABBV ahead
2025-05-2798.3479.00+1.68ABBV ahead
2025-05-2397.0377.75+1.73ABBV ahead
2025-05-2296.6577.91+1.68ABBV ahead
2025-05-2196.2678.97+1.49ABBV ahead
2025-05-2097.8881.38+1.36ABBV ahead
2025-05-1998.3382.26+1.30ABBV ahead
2025-05-1697.4482.51+1.17ABBV ahead
2025-05-1596.2079.88+1.40ABBV ahead
2025-05-1493.9577.95+1.42ABBV ahead
2025-05-1399.5481.27+1.62ABBV ahead
2025-05-12100.6482.31+1.62ABBV ahead
2025-05-0997.7480.02+1.62ABBV ahead
2025-05-0898.2681.86+1.44ABBV ahead
2025-05-0799.5984.61+1.21ABBV ahead
2025-05-0699.0984.44+1.19ABBV ahead
2025-05-05103.8289.49+1.06ABBV ahead
2025-05-02105.0989.72+1.18ABBV ahead
2025-05-01102.3786.51+1.31ABBV ahead
2025-04-30103.3097.93-0.04near the usual relationship
2025-04-29102.4696.43+0.04near the usual relationship
2025-04-28101.8495.57+0.08near the usual relationship
2025-04-2598.5296.36-0.41near the usual relationship
2025-04-2495.5093.66-0.45near the usual relationship
2025-04-2393.7590.35-0.25near the usual relationship
2025-04-2292.0290.15-0.44near the usual relationship
2025-04-2190.1089.11-0.56LLY ahead
2025-04-1791.6091.50-0.68LLY ahead
2025-04-1690.9080.06+0.81ABBV ahead
2025-04-1593.6182.48+0.81ABBV ahead
2025-04-1494.8382.18+1.01ABBV ahead
2025-04-1192.6979.79+1.09ABBV ahead
2025-04-1092.2478.53+1.23ABBV ahead
2025-04-0995.2282.11+1.09ABBV ahead
2025-04-0893.0279.11+1.26ABBV ahead
2025-04-0798.7878.84+2.04ABBV ahead
2025-04-0498.9980.42+1.85ABBV ahead
2025-04-03106.7785.96+1.97ABBV ahead
2025-04-02108.6589.13+1.75ABBV ahead
2025-04-01109.2287.72+2.03ABBV ahead
2025-03-31110.9489.97+1.92ABBV ahead
2025-03-28108.7089.60+1.73ABBV ahead
2025-03-27107.3489.51+1.60ABBV ahead
2025-03-26106.5990.06+1.44ABBV ahead
2025-03-25106.6192.85+1.06ABBV ahead
2025-03-24110.7594.22+1.37ABBV ahead
2025-03-21111.2091.24+1.83ABBV ahead
2025-03-20112.2391.79+1.89ABBV ahead
2025-03-19112.3891.18+2.00ABBV ahead
2025-03-18113.2389.60+2.35ABBV ahead
2025-03-17113.5689.85+2.37ABBV ahead
2025-03-14112.1388.62+2.41ABBV ahead
2025-03-13112.0187.33+2.61ABBV ahead
2025-03-12112.2889.53+2.34ABBV ahead
2025-03-11113.0989.77+2.43ABBV ahead
2025-03-10114.7290.39+2.57ABBV ahead
2025-03-07113.4794.73+1.79ABBV ahead
2025-03-06111.5999.43+0.91ABBV ahead
2025-03-05112.01101.28+0.71ABBV ahead
2025-03-04110.0199.25+0.73ABBV ahead
2025-03-03111.98101.28+0.70ABBV ahead
2025-02-28110.68100.29+0.67ABBV ahead
2025-02-27108.5698.60+0.63ABBV ahead
2025-02-26107.4999.68+0.35near the usual relationship
2025-02-25108.0998.24+0.62ABBV ahead
2025-02-24108.0696.02+0.93ABBV ahead
2025-02-21107.0095.18+0.91ABBV ahead
2025-02-20106.3695.11+0.84ABBV ahead
2025-02-19104.5094.45+0.69ABBV ahead
2025-02-18103.9193.38+0.77ABBV ahead
2025-02-14102.1291.97+0.74ABBV ahead
2025-02-13102.4394.98+0.34near the usual relationship
2025-02-12102.1995.10+0.29near the usual relationship
2025-02-11101.5794.23+0.33near the usual relationship
2025-02-10100.7894.65+0.16near the usual relationship
2025-02-07100.9295.68+0.02near the usual relationship
2025-02-06102.1894.81+0.30near the usual relationship
2025-02-05101.5391.74+0.64ABBV ahead
2025-02-04100.5889.99+0.76ABBV ahead
2025-02-03100.6888.29+1.02ABBV ahead
2025-01-3197.3788.36+0.56ABBV ahead
2025-01-3093.0189.68-0.23near the usual relationship
2025-01-2992.8087.59+0.04near the usual relationship
2025-01-2892.5687.69-0.02near the usual relationship
2025-01-2793.6788.04+0.07near the usual relationship
2025-01-2490.1785.56-0.06near the usual relationship
2025-01-2390.3783.51+0.26near the usual relationship
2025-01-2289.5982.14+0.34near the usual relationship
2025-01-2191.4080.87+0.76ABBV ahead
2025-01-1790.8479.06+0.94ABBV ahead
2025-01-1691.9782.53+0.57ABBV ahead
2025-01-1590.7381.35+0.57ABBV ahead
2025-01-1492.9581.15+0.88ABBV ahead
2025-01-1393.5886.87+0.15near the usual relationship
2025-01-1092.7587.14+0.01near the usual relationship
2025-01-0894.5185.76+0.40near the usual relationship
2025-01-0795.0684.24+0.66ABBV ahead
2025-01-0695.3683.35+0.80ABBV ahead
2025-01-0395.9585.19+0.62ABBV ahead
2025-01-0295.0184.76+0.55ABBV ahead
2024-12-3194.0984.10+0.52ABBV ahead
2024-12-3093.3084.30+0.39near the usual relationship
2024-12-2794.2685.32+0.36near the usual relationship
2024-12-2694.8986.51+0.27near the usual relationship
2024-12-2495.3186.68+0.29near the usual relationship
2024-12-2394.4686.74+0.18near the usual relationship
2024-12-2092.9783.64+0.38near the usual relationship
2024-12-1990.8282.52+0.27near the usual relationship
2024-12-1891.6183.30+0.26near the usual relationship
2024-12-1792.8684.82+0.20near the usual relationship
2024-12-1690.8884.86-0.03near the usual relationship
2024-12-1391.8085.96-0.06near the usual relationship
2024-12-1291.7085.23+0.00near the usual relationship
2024-12-1192.3386.72-0.11near the usual relationship
2024-12-1093.0287.10-0.08near the usual relationship
2024-12-0993.4987.54-0.09near the usual relationship
2024-12-0693.2990.06-0.39near the usual relationship
2024-12-0593.2889.94-0.39near the usual relationship
2024-12-0493.4390.40-0.42near the usual relationship
2024-12-0396.1088.60+0.05near the usual relationship
2024-12-0296.2587.13+0.22near the usual relationship
2024-11-2996.8686.64+0.34near the usual relationship
2024-11-2796.9485.86+0.43near the usual relationship
2024-11-2695.9185.99+0.31near the usual relationship
2024-11-2593.7582.25+0.53ABBV ahead
2024-11-2293.6981.49+0.61ABBV ahead
2024-11-2190.9381.69+0.29near the usual relationship
2024-11-2088.8382.07+0.02near the usual relationship
2024-11-1988.2079.49+0.26near the usual relationship
2024-11-1888.0479.22+0.28near the usual relationship
2024-11-1587.3681.29-0.05near the usual relationship
2024-11-1489.8285.65-0.30near the usual relationship
2024-11-1390.2088.44-0.57LLY ahead
2024-11-1290.5989.20-0.62LLY ahead
2024-11-1192.3690.68-0.59LLY ahead
2024-11-08105.6390.58+0.73ABBV ahead
2024-11-07106.1786.87+1.20ABBV ahead
2024-11-06106.5384.58+1.50ABBV ahead
2024-11-05106.7987.81+1.16ABBV ahead
2024-11-04106.1587.82+1.10ABBV ahead
2024-11-01107.7889.21+1.09ABBV ahead
2024-10-31107.9590.39+0.97ABBV ahead
2024-10-30106.6992.25+0.65ABBV ahead
2024-10-29100.3198.43-0.59LLY ahead
2024-10-28100.4397.56-0.50LLY ahead
2024-10-2599.4797.25-0.57LLY ahead
2024-10-24100.4297.10-0.46near the usual relationship
2024-10-2399.4898.40-0.69LLY ahead
2024-10-2299.9599.04-0.71LLY ahead
2024-10-2198.7798.71-0.80LLY ahead
2024-10-18100.00100.00-0.81LLY ahead

One-day company-specific moves (4+ standard deviations, which block ideas for 10 sessions): Oct 30, 2024 (ABBV +6.4%, LLY -6.3%); Nov 11, 2024 (ABBV -12.6%, LLY +0.1%); Apr 17, 2025 (ABBV +0.8%, LLY +14.3%); May 1, 2025 (ABBV -0.9%, LLY -11.7%); Aug 7, 2025 (ABBV +1.3%, LLY -14.1%); Feb 4, 2026 (ABBV -3.8%, LLY +10.3%). Upcoming earnings: LLY Oct 29, 2026 (pre-market); ABBV Oct 30, 2026 (pre-market).

Paired trades

The shared paper book and the replay, kept apart

Forward paper record

No paper position on this pair yet.

Historical simulation (a diagnostic, same rules)

No simulated trade through Oct 20, 2026: the pair rarely passed every test while 2 standard deviations apart.

Per $10,000 a leg. A replay on today's companies cannot prove an edge.

The companies

ABBV and LLY at a glance

ABBV AbbVie Inc.

Listing
NYSE · SEC CIK 1551152
Industry
Biotechnology: Pharmaceutical Preparations · SIC 2834 Pharmaceutical Preparations
Market value
$499.5B
Price history
2,521 daily closes, Oct 12, 2016 to Oct 22, 2026

LLY Eli Lilly and Company

Listing
NYSE · SEC CIK 59478
Industry
Biotechnology: Pharmaceutical Preparations · SIC 2834 Pharmaceutical Preparations
Market value
$1.17T
Price history
2,521 daily closes, Oct 12, 2016 to Oct 22, 2026

Daily prices: Nasdaq.com. Filings and industry codes: SEC EDGAR. Earnings dates: Nasdaq earnings calendar.

Related
All pairs →
PairStatusAhead nowIndustry
LLY / JNJWatchlistLLY by 0.87 sdBiotechnology: Pharmaceutical Preparations
JNJ / ABBVWatchlistABBV by 0.83 sdBiotechnology: Pharmaceutical Preparations

Follow the research behind the paper book

Boostio is a research-first platform in private beta: crypto candidates, daily market stories, public paper trading and now rival stocks. Exploring these pages stays free and open.

Explore the private beta

Paper only: hypothetical paired positions with modelled costs. No broker, no orders, no real money. A historical simulation is a diagnostic, not proof of an edge. Not investment advice.